EOT proposal is a request for an extension of time in a construction project due to delays beyond the contractor's control.
EOT stands for Extension of Time.
It is a formal request made by the contractor to the client or project owner.
The request is usually accompanied by supporting documentation such as delay analysis reports, weather reports, and other relevant evidence.
EOT proposals are typically reviewed by the proje...
To plan 2 lacs Cum concrete in 1 year, calculate daily production target and number of RMC plants needed.
Calculate daily production target by dividing total volume by number of working days in a year
Determine the capacity of each RMC plant and divide the daily production target by it to find out how many plants are needed
Consider factors like downtime, maintenance, and transportation in your planning
Top trending discussions
posted on 2 Aug 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
I am highly confident in my skills and abilities.
I have a strong track record of successfully managing planning projects in my previous roles.
I continuously seek opportunities to improve my skills through training and professional development.
I have received positive feedback from colleagues and supervisors on my performance and contributions.
I am confident in my ability to analyze data, develop strategies, and make in
Yes, I am ready to work 12 hours per day as an Assistant Planning Manager.
I am dedicated to my work and willing to put in the extra hours when needed
I understand the demands of the role and am prepared to meet them
I have experience working long hours in previous positions
posted on 7 Aug 2023
I applied via LinkedIn and was interviewed before Aug 2022. There were 5 interview rounds.
posted on 11 Aug 2024
Baselines in Primavera are snapshots of the project schedule at a specific point in time, used for comparison and tracking progress.
Baselines capture the original project plan before any changes are made.
They are used as a reference point to compare actual progress against planned progress.
Baselines help in identifying deviations from the original plan and taking corrective actions.
In Primavera, baselines can be create...
To track a project in Primavera P6 on a daily basis, use the following steps.
Update progress for each activity daily
Review critical path activities regularly
Monitor resource allocation and availability
Compare planned vs. actual progress
Generate daily reports for stakeholders
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
The planning initiation process involves defining the project scope, objectives, and deliverables.
Identify the need for planning
Define the project scope, objectives, and deliverables
Identify key stakeholders and their roles
Establish a project team
Develop a project charter or initiation document
Conduct a feasibility study
Identify risks and constraints
Define the planning timeline and milestones
The scheduling process involves considering durations in relation to productivity.
The scheduling process starts by identifying the tasks that need to be completed.
The duration of each task is estimated based on historical data or expert judgment.
Productivity levels are taken into account when determining the duration of tasks.
Factors such as employee skills, equipment availability, and potential bottlenecks are conside...
The productivity norms in planning management vary across industries and sites.
Productivity norms in planning management are specific to each industry and site.
These norms are determined based on factors such as the nature of work, resources available, and industry standards.
For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.
In the...
Trackers are prepared for site tracking and schedule upgradation.
Trackers are tools used to monitor and track progress on a site or project.
They help in keeping track of tasks, deadlines, and milestones.
Trackers can be in the form of spreadsheets, software, or project management tools.
They provide visibility into the status of various activities and help in identifying bottlenecks or delays.
Upgradation of schedules inv...
posted on 4 Aug 2024
I applied via Referral and was interviewed in Feb 2024. There were 2 interview rounds.
Steel wastage can be controlled by implementing efficient production processes, proper inventory management, and regular maintenance of equipment.
Implementing efficient production processes to minimize errors and reduce scrap
Proper inventory management to avoid overstocking and material damage
Regular maintenance of equipment to ensure optimal performance and prevent breakdowns
Training employees on proper handling and c...
Routing is the process of determining the most efficient path for materials or information to flow through a production system.
Routing involves determining the sequence of operations and work centers through which a product will pass during manufacturing.
It helps in optimizing production processes by minimizing delays and maximizing efficiency.
Examples of routing decisions include selecting the best machine for a parti...
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
I applied via Referral and was interviewed in Mar 2023. There were 4 interview rounds.
Yes, I have experience in scheduling.
I have worked on scheduling projects using software such as Primavera P6 and Microsoft Project.
I am familiar with creating and updating project schedules, resource allocation, and critical path analysis.
I have also worked on schedule risk analysis and mitigation planning.
I understand the importance of accurate scheduling in project management and strive to ensure that schedules are
based on 3 reviews
Rating in categories
Assistant Manager
318
salaries
| ₹4.5 L/yr - ₹11.5 L/yr |
Senior Engineer
221
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Engineer
138
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Executive
133
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Deputy Manager
126
salaries
| ₹6.6 L/yr - ₹17.5 L/yr |
Nagarjuna Construction Company
PNC Infratech
Ashoka Buildcon
IRB Infrastructure