I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
Portals are used in OHE for easy access to information, different types of portals are used, guy rod consists of various parts, and different types of relationships are used in project planning.
Portals are used in OHE for easy access to information and communication among team members.
Types of portals used in OHE include project management portals, document sharing portals, and collaboration portals.
Parts of a guy rod ...
Different types of foundations, parts of Bracket Assembly, and types of insulators used in OHE.
Types of foundations used in OHE: Direct Embedment, Pile Foundation, Raft Foundation, etc.
Parts of Bracket Assembly: Bracket, Insulator, Clamp, Bolts, Nuts, etc.
Types of insulators used in OHE: Pin Type Insulator, Suspension Type Insulator, Strain Type Insulator, etc.
Anticreep is a feature in gas turbines that prevents the rotor from creeping during shutdown.
Prevents rotor from moving slowly during shutdown
Helps maintain proper alignment of components
Reduces wear and tear on turbine parts
Improves overall efficiency and performance of the turbine
Regulating equipment is used to control the flow, pressure, or temperature of a system to maintain desired conditions.
Regulating equipment includes valves, regulators, controllers, and sensors.
The purpose of regulating equipment is to ensure that the system operates within specified parameters.
For example, a pressure regulator is used to maintain a constant pressure in a gas pipeline.
Another example is a thermostat tha
The size of Contact and Catenary wire varies depending on the specific application and requirements.
Contact wire typically ranges from 10 mm to 14 mm in diameter
Catenary wire can range from 7 mm to 12 mm in diameter
The size of the wire is determined by factors such as the weight it needs to support and the amount of current it needs to carry
Bonding is the process of creating a strong emotional connection between individuals, often through shared experiences and mutual trust.
Bonding helps to build trust and loyalty among team members
It fosters collaboration and communication within a group
Bonding can improve morale and motivation in the workplace
Examples include team-building activities, group projects, and social events
Top trending discussions
posted on 7 Sep 2022
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
60 minutes, basic aptitude and english
The latest technology in construction includes 3D printing, drones, and Building Information Modeling (BIM).
3D printing allows for faster and more efficient construction of complex structures.
Drones can be used for site inspections, surveying, and monitoring progress.
BIM is a digital representation of a building that allows for better collaboration and communication among stakeholders.
Other technologies include virtual...
posted on 6 Jun 2023
I applied via Approached by Company and was interviewed before Jun 2022. There were 2 interview rounds.
Primavera is a popular planning tool used for scheduling and quantity calculation, while subcontractor and client billing are essential aspects of project management.
Primavera is a widely used planning tool for creating schedules and managing resources in construction projects.
Planning tools help in creating timelines, assigning tasks, and tracking progress to ensure projects are completed on time.
Quantity calculation ...
posted on 2 Aug 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
I am highly confident in my skills and abilities.
I have a strong track record of successfully managing planning projects in my previous roles.
I continuously seek opportunities to improve my skills through training and professional development.
I have received positive feedback from colleagues and supervisors on my performance and contributions.
I am confident in my ability to analyze data, develop strategies, and make in
Yes, I am ready to work 12 hours per day as an Assistant Planning Manager.
I am dedicated to my work and willing to put in the extra hours when needed
I understand the demands of the role and am prepared to meet them
I have experience working long hours in previous positions
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
posted on 2 May 2021
posted on 10 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Piping code and welder qualifications test
Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.
Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.
Both piping code and welder qualifications test are important in ensu...
I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.
I applied via Referral and was interviewed before Sep 2017. There were 2 interview rounds.
Some of the top questions asked at the Zetwerk Assistant Manager Planning interview -
Assistant Manager
132
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
85
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
67
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
64
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
Bharat Forge
Larsen & Toubro Limited
Mahindra & Mahindra