i
G R Infraprojects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
Top trending discussions
posted on 16 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
posted on 27 Sep 2024
P&m phul from hai ka
I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.
posted on 12 Jul 2024
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
posted on 11 May 2022
I applied via Company Website and was interviewed in May 2022. There were 3 interview rounds.
Single phase has one live wire and one neutral wire, while three phase has three live wires and one neutral wire.
Single phase is used for smaller loads like household appliances.
Three phase is used for larger loads like industrial machinery.
Single phase has a lower power output compared to three phase.
Three phase is more efficient and cost-effective for high power applications.
Single phase has a voltage of 230V while t...
The kW required for a 2 hp motor depends on the efficiency of the motor.
The efficiency of the motor needs to be known to calculate the kW required.
The formula to calculate kW is kW = hp x 0.746 / efficiency.
Assuming an efficiency of 80%, the kW required for a 2 hp motor would be 1.49 kW.
Electrician ITI NCVT college
I applied via Job Portal and was interviewed in Mar 2022. There was 1 interview round.
Wiring and boards are essential components of electrical systems.
Wiring refers to the physical connections between electrical components.
Boards are used to organize and control the flow of electricity.
Proper wiring and board design are crucial for safety and efficiency.
Examples of boards include circuit breaker panels and control boards for industrial machinery.
posted on 18 Mar 2022
I applied via Company Website and was interviewed in Feb 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jul 2021. There was 1 interview round.
based on 2 reviews
Rating in categories
Assistant Manager
318
salaries
| ₹4.5 L/yr - ₹11.5 L/yr |
Senior Engineer
221
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Engineer
138
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Executive
133
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Deputy Manager
126
salaries
| ₹6.6 L/yr - ₹17.5 L/yr |
Nagarjuna Construction Company
PNC Infratech
Ashoka Buildcon
IRB Infrastructure