Upload Button Icon Add office photos

IRB Infrastructure

Compare button icon Compare button icon Compare

Filter interviews by

IRB Infrastructure Supervisor Interview Questions and Answers

Updated 21 Jun 2024

IRB Infrastructure Supervisor Interview Experiences

1 interview found

Supervisor Interview Questions & Answers

user image Anonymous

posted on 21 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Company location
  • Q2. Salary basic salary time

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. What is android architecture stack?
  • Q2. What is AIDL?
  • Ans. 

    AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.

    • AIDL is used to define the interface between client and service in Android.

    • It allows communication between different processes in Android.

    • AIDL is used to pass complex data types between processes.

    • AIDL is similar to Remote Procedure Call (RPC) in other programming languages.

    • Example: AIDL is used in Android to implement...

  • Answered by AI
  • Q3. What is hash set and hash map
  • Ans. 

    Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.

    • Hash set stores unique values without any specific order.

    • Hash map stores key-value pairs and allows fast retrieval of values based on keys.

    • Both use hashing to map keys to their corresponding values.

    • In Java, HashSet and HashMap are implementations of these data structures.

  • Answered by AI

Skills evaluated in this interview

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1.  l&t company establishment date
  • Q2. You have a experience in construction line.
  • Q3. What working to be site
  • Ans. Box culvert, returning wall, desk slab, cross bariyar, tow wall etc.
  • Answered by Suman maity

Interview Preparation Tips

Interview preparation tips for other job seekers - I am try to be small time to complete the work. My site is properly safety with 0 accident. It's projected is my responsibility.
I work to rail project, road project, hospital and metro project working in site.

I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. My past work related questions
  • Q2. Bbs, reinforcement formula
  • Q3. Concrete realated

Interview Preparation Tips

Interview preparation tips for other job seekers - Your experience is the best teacher

I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About site handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be good technical knowledge

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

IRB Infrastructure Interview FAQs

How many rounds are there in IRB Infrastructure Supervisor interview?
IRB Infrastructure interview process usually has 1 rounds. The most common rounds in the IRB Infrastructure interview process are One-on-one Round.

Tell us how to improve this page.

IRB Infrastructure Supervisor Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
IRB Infrastructure Supervisor Salary
based on 19 salaries
₹1.2 L/yr - ₹4 L/yr
19% less than the average Supervisor Salary in India
View more details

IRB Infrastructure Supervisor Reviews and Ratings

based on 20 reviews

4.5/5

Rating in categories

4.5

Skill development

3.7

Work-life balance

3.6

Salary

4.2

Job security

4.1

Company culture

4.3

Promotions

4.5

Work satisfaction

Explore 20 Reviews and Ratings
Executive Accountant
33 salaries
unlock blur

₹2.4 L/yr - ₹5.3 L/yr

Highway Engineer
30 salaries
unlock blur

₹4 L/yr - ₹10.9 L/yr

Senior Accounts Executive
26 salaries
unlock blur

₹3 L/yr - ₹6.1 L/yr

Structural Engineer
24 salaries
unlock blur

₹2.4 L/yr - ₹9.2 L/yr

Supervisor
19 salaries
unlock blur

₹1.2 L/yr - ₹4 L/yr

Explore more salaries
Compare IRB Infrastructure with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview