Shuttering material refers to temporary structures used in construction projects to support concrete during the curing process.
Shuttering material is required to provide formwork support for concrete structures.
It helps in creating the desired shape and structure of the concrete element.
Common types of shuttering materials include plywood, steel, aluminum, and plastic.
The choice of material depends on factors like proj...
Yes
Yes, I am able to formulate claim raising and defending strategies based on contractual provisions.
I have extensive experience in contract management and have successfully raised and defended claims in my previous roles.
I am well-versed in analyzing contractual provisions and identifying the relevant clauses for formulating effective strategies.
I have a strong understanding of contract law and can leverage it to dev...
Preliminary drawing, as-built drawing, drawing schedule, and proof checking are all important aspects of the design and construction process.
Preliminary drawing: Initial sketches or plans that outline the basic design concept.
As-built drawing: Final drawings that reflect any changes made during construction.
Drawing schedule: A timeline or list that outlines when each drawing is expected to be completed.
Proof checking: ...
The sources and quantity of materials in projects are determined based on the tender requirements.
The sources of materials in projects are determined through a procurement process.
The quantity of materials required is specified in the tender documents.
The tender documents may include a bill of quantities or a detailed scope of work.
The procurement team evaluates potential suppliers and selects the most suitable ones.
Th...
Rate analysis of earthwork for road project involves calculating the cost of excavation, transportation, and compaction of soil.
Rate analysis helps in estimating the cost of earthwork for road construction.
It involves determining the quantity of earthwork required and the rates for excavation, transportation, and compaction.
The rates are based on factors like the type of soil, distance of transportation, and equipment ...
The S-Curve is a graphical representation of the growth or progress of a project or business over time.
The S-Curve is named after its shape, which resembles the letter 'S'.
It is commonly used in project management to track and visualize the progress of tasks or activities.
The curve typically shows slow progress at the beginning, followed by a rapid growth phase, and then a tapering off towards the end.
The S-Curve helps...
Preparing a R0 budget for a road project involves several steps and considerations.
Identify the scope and objectives of the road project
Estimate the quantities of materials and resources required
Determine the unit costs of materials, labor, and equipment
Calculate the total cost for each item and activity
Consider any contingencies or unforeseen expenses
Sum up the costs to create the overall budget
Review and refine the b
Change of Scope in a road project refers to any modifications or alterations made to the original project plan.
Change of scope can include changes in project objectives, deliverables, timelines, or budget.
It may involve adding or removing features, adjusting the project scope, or redefining project requirements.
For example, if a road project initially planned to construct a two-lane road but later decides to expand it ...
Price adjustment is a mechanism to account for changes in project costs. It helps in maintaining project profitability.
Price adjustment is a provision in a contract that allows for changes in project costs due to various factors such as inflation, currency fluctuations, or changes in material prices.
Its role in project cost is to ensure that the project remains financially viable and profitable despite cost fluctuation...
Top trending discussions
posted on 17 Jun 2023
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.
posted on 8 Jul 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
Costing for transmission line involves calculating the total expenses for materials, labor, equipment, and overhead costs.
Calculate the total length of the transmission line needed
Estimate the cost of materials such as cables, poles, insulators, and connectors
Factor in labor costs for installation and maintenance
Include equipment costs for specialized tools and machinery
Consider overhead costs such as permits, land acq...
Execution of transmission line involves planning, design, construction, and maintenance of power lines.
Planning involves route selection, environmental impact assessment, and obtaining necessary permits.
Design includes determining the type of towers, conductor size, and insulator selection.
Construction involves clearing the right-of-way, setting foundations, erecting towers, and stringing conductors.
Maintenance include...
posted on 15 May 2024
I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.
My current Cost To Company is $120,000 per year.
My current Cost To Company includes my salary, benefits, bonuses, and any other compensation provided by the company.
It is important to consider the total value of all components of the compensation package when discussing Cost To Company.
For example, my salary is $100,000 per year, with an additional $20,000 in benefits and bonuses.
The Cost To Company may vary based on i
posted on 27 Dec 2024
I applied via LinkedIn and was interviewed before Dec 2023. There was 1 interview round.
Numerical reasoning and verbal reasoning followed by psychometric assessment.
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.
Logistics management Suppy Chain internet and CV.
Organization Amazon, Udaan and Dehaat skills assessment the same important working support.
posted on 5 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
Process of Goods receive, Material Issuence ,Inventory control ,Gate Pass of Job work Material
Population projection methods include cohort-component, trend extrapolation, and expert opinion. For water supply projects, population can be projected based on historical data, demographic trends, and development plans.
Population projection methods: cohort-component, trend extrapolation, expert opinion
For water supply projects, project population based on historical data, demographic trends, development plans
Consider ...
Water distribution systems are designed using hydraulic principles to ensure efficient water supply to consumers. Elevated service reservoirs are designed to store and distribute water at higher elevations.
Water distribution systems are designed based on factors such as population served, water demand, topography, and available water sources.
Hydraulic calculations are used to determine pipe sizes, flow rates, and press...
Some of the top questions asked at the PNC Infratech Senior Manager interview -
based on 3 reviews
Rating in categories
Assistant Engineer
174
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
109
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
Simplex Infrastructures