Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2023. There were 7 interview rounds.
Compressive strength of cube
All test all tests quality control
Bitumen, Aggregate test, cement test,????
Coding test all questions
All tests quality control in Lab engineering
I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.
PNC Infratech interview questions for designations
Top trending discussions
posted on 3 May 2019
I feel confident and well-prepared for this interview.
I have thoroughly researched the company and the role
I have practiced common interview questions and my responses
I am showcasing my technical skills and experiences effectively
I would report the incident to the appropriate authority and follow the company's policy on reporting unethical behavior.
Confront the colleague and ask for an explanation
Check the company's policy on reporting unethical behavior
Report the incident to the appropriate authority
Maintain confidentiality and avoid gossiping about the incident
I handle stress by prioritizing tasks, taking breaks, and seeking support from colleagues.
Prioritize tasks to focus on what needs to be done first
Take short breaks to relax and recharge
Seek support from colleagues or mentors for guidance and advice
I handle stress in colleagues by maintaining open communication, offering support, and promoting a positive work environment.
Maintain open communication to address any issues or concerns
Offer support and assistance when needed
Promote a positive work environment through teamwork and collaboration
I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.
posted on 10 Jun 2021
posted on 20 Mar 2022
I applied via Company Website and was interviewed in Feb 2022. There were 2 interview rounds.
posted on 14 Jan 2023
I applied via Company Website
posted on 20 Feb 2021
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
PH value is not applicable to weather as it is a measure of acidity or alkalinity of a solution.
PH value is a measure of the concentration of hydrogen ions in a solution.
It is used to determine the acidity or alkalinity of a solution on a scale of 0 to 14.
Weather does not have a PH value as it is not a solution.
However, PH value can be affected by weather conditions such as acid rain.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
It is an important factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete and its intended use.
For example, a water cement ratio of 0.45 is recommended for concrete used ...
Unit weight of 1m³ steel?
The unit weight of steel varies depending on its type and grade
The density of mild steel is around 7850 kg/m³
The density of stainless steel is around 7480 kg/m³
The density of high carbon steel is around 7850 kg/m³
The density of low carbon steel is around 7700 kg/m³
M-20 and M-25 are concrete mix ratios used in construction.
M-20 concrete mix ratio is 1:1.5:3 (cement:sand:aggregate)
M-25 concrete mix ratio is 1:1:2 (cement:sand:aggregate)
The strength of concrete increases with the increase in the mix ratio
M-20 is generally used for non-structural works while M-25 is used for structural works
Unit weight of 1m³ cement?
Unit weight of cement varies from 1440 to 1840 kg/m³ depending on the type of cement used.
The most commonly used cement, Portland cement, has a unit weight of 1506 kg/m³.
Unit weight is important in determining the amount of cement required for a project.
Volume of a bag of cement?
A standard bag of cement weighs 50 kg
The volume of a bag of cement depends on its density
Assuming a density of 1440 kg/m³, the volume of a bag of cement is 0.0347 m³
based on 2 interviews
2 Interview rounds
based on 10 reviews
Rating in categories
Assistant Engineer
174
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
109
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
Simplex Infrastructures