I applied via Company Website and was interviewed in Aug 2022. There were 3 interview rounds.
As a highway engineer, my responsibility in the last site was to oversee the construction of a new highway interchange.
Managed a team of construction workers and ensured that the project was completed on time and within budget
Reviewed and approved design plans and made necessary adjustments
Coordinated with local authorities and stakeholders to ensure compliance with regulations and minimize disruptions to the community
...
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
Top trending discussions
I applied via AmbitionBox and was interviewed in Mar 2024. There was 1 interview round.
To maintain a slope in a hill cutting location, proper drainage, erosion control measures, and stabilization techniques must be implemented.
Ensure proper drainage to prevent water accumulation and erosion
Implement erosion control measures such as retaining walls, geotextiles, and vegetation
Stabilize the slope using techniques like terracing, soil nailing, or rock bolting
Regularly inspect and maintain the slope to addre...
I have 5 years of experience as a Highway Engineer, working on various road construction and maintenance projects.
Worked on designing and implementing road infrastructure projects
Managed construction and maintenance activities
Collaborated with government agencies and contractors
Performed site inspections and ensured compliance with safety regulations
Analyzed traffic patterns and proposed improvements
Used software and t...
I applied via Naukri.com
According to the topic
Some projects needful for you
Presence of mind
Knowledge of me in this field
No GD
I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.
SG top layer finishing work refers to the final layer of asphalt or concrete pavement on a road or highway.
SG top layer finishing work is the final layer of pavement on a road or highway
It is typically made of asphalt or concrete
The purpose of this layer is to provide a smooth and durable driving surface
It also helps to protect the underlying layers from damage and wear
Examples of SG top layer finishing work include ch
WMM top layer finishing work is the final layer of construction in a road pavement.
WMM stands for Wet Mix Macadam, which is a type of road construction material.
The top layer of WMM is usually made up of crushed aggregates and is laid to a thickness of 50-75mm.
The top layer is compacted using a vibratory roller to achieve the desired density and smoothness.
The finishing work involves trimming the edges of the road, rem...
Interview experience
based on 20 reviews
Rating in categories
Assistant Engineer
175
salaries
| ₹2 L/yr - ₹6 L/yr |
Junior Engineer
108
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Assistant Manager
63
salaries
| ₹5 L/yr - ₹12.5 L/yr |
Highway Engineer
54
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Accounts Officer
51
salaries
| ₹3.2 L/yr - ₹6.6 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
Simplex Infrastructures