The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
Top trending discussions
posted on 29 Dec 2022
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
posted on 20 Jun 2021
I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
posted on 31 Oct 2023
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.
Rate analysis for plaster involves calculating the cost of materials, labor, and equipment required for plastering a specific area.
Determine the area to be plastered
Calculate the quantity of materials required (cement, sand, water)
Determine the cost of materials per unit
Calculate the cost of labor per unit area
Include the cost of equipment and tools used
Add all costs to get the total cost of plastering
Example: For plas...
BBS is Bar Bending Schedule used for steel reinforcement and BOQ is Bill of Quantities used for building items.
BBS provides details of reinforcement steel required for construction.
BOQ lists all the materials and quantities required for construction.
BBS is used for steel reinforcement in structures like columns, beams, slabs, etc.
BOQ is used for building items like bricks, cement, sand, etc.
Both BBS and BOQ are importa...
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
based on 21 reviews
Rating in categories
Deputy Engineer
105
salaries
| ₹4.6 L/yr - ₹8.1 L/yr |
Assistant Bridge Engineer
69
salaries
| ₹3.8 L/yr - ₹6.5 L/yr |
Assistant Engineer
55
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Assistant Highway Engineer
49
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
42
salaries
| ₹3.2 L/yr - ₹6.4 L/yr |
ABCI Infrastructures
VIKRAN Engineering & Exim
The Louis Berger Group
Nesma & Partners