Round 1 - HR 

(1 Question)

  • Q1. Why dowel bar is used in pqc
  • Ans. 

    Dowel bars are used in PQC to transfer load and prevent faulting in joints.

    • Dowel bars help in transferring loads between adjacent slabs, reducing stresses at joints

    • They prevent faulting by maintaining alignment and load transfer across joints

    • Improves overall performance and durability of the pavement

    • Commonly made of steel or fiberglass materials

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Previous company salary structure,pay slip last 3 months,salary negotiation is there .
  • Ans. I have showed my earlier organization pay slip of last 3 month and making negotiation with my salary .
  • Answered Anonymously
Round 3 - Technical 

(1 Question)

  • Q1. Question related to previous projects duties and responsibilities. IRC codes and MoRTH specifications related to BC,DM quality test and procedures. Aggregate nominal size mix gradation,MPR ,DPR,cost estima...
  • Ans. I have prepared the answer as because I have worked the cost estimate of various elements related COS in my previous organisation, very well versed with specifications related to IRC and MoRTH and also worked in LAB when get time from site work
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Please get through knowledge about the typical section of carriageway width of 4 lane 6 lane and knowledge about the layers components of flexible and rigid pavement,Get versed about IRC codes specially IRC SP 84,87,67,35,073

Assistant Highway Engineer Interview Questions Asked at Other Companies

Q1. Which Company Paver do you use?
Q2. What should be the maximum speed of paver during DBM LAYING?
Q3. What's maximum camber in superelevation portion
Q4. What is the width of 4 Lane highway?
Q5. Crossfall ,height of embankment,what type of stability

Interview questions from similar companies

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As attendance for “Mid Management level designation “ Just asks about my Experience. Not much Technical points highlighted except few Manager level Questions (general points not much technically projected)...

Interview Preparation Tips

Topics to prepare for VIKRAN Engineering & Exim Assistant Manager interview:
  • Nothing required.
Interview preparation tips for other job seekers - Just expecting less salary and having Good experience in the relevant field you can have JOB CONFIRMED easily.

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical about railway experience in OHE
  • Q2. Commerical experience related to client billing
  • Ans. 

    I have extensive commercial experience related to client billing.

    • Managed client billing for a software company, ensuring timely and accurate invoicing

    • Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue

    • Collaborated with sales team to resolve billing discrepancies and improve client satisfaction

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Small organisation but growing in a steady path

I applied via Naukri.com and was interviewed before Dec 2020. There were 2 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Execution work Related question
  • Q2. Estimation related questions
  • Q3. Costing and budget of building
  • Ans. 

    Costing and budget of building

    • Costing and budgeting are crucial aspects of any building project

    • It involves estimating the cost of materials, labor, and other expenses

    • Creating a budget helps in managing the project and avoiding overspending

    • Regular monitoring and updating of the budget is necessary to ensure the project stays on track

    • Factors like inflation, unexpected expenses, and changes in scope can impact the budget

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No o(kkkkkkkkkkkkkk
Okkkk
Okkkkkk
Okkkkkkk
Okkk
Okk
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 3 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items

I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Rate analysis for plaster
  • Ans. 

    Rate analysis for plaster involves calculating the cost of materials, labor, and equipment required for plastering a specific area.

    • Determine the area to be plastered

    • Calculate the quantity of materials required (cement, sand, water)

    • Determine the cost of materials per unit

    • Calculate the cost of labor per unit area

    • Include the cost of equipment and tools used

    • Add all costs to get the total cost of plastering

    • Example: For plas...

  • Answered by AI
  • Q2. BBS for steel and BOQ for building items
  • Ans. 

    BBS is Bar Bending Schedule used for steel reinforcement and BOQ is Bill of Quantities used for building items.

    • BBS provides details of reinforcement steel required for construction.

    • BOQ lists all the materials and quantities required for construction.

    • BBS is used for steel reinforcement in structures like columns, beams, slabs, etc.

    • BOQ is used for building items like bricks, cement, sand, etc.

    • Both BBS and BOQ are importa...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Study IS 1200 all parts, material reconciliation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is the basics concept used for construction of Substation from start to Finish
  • Ans. 

    The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.

    • Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.

    • Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.

    • Eq...

  • Answered by AI
  • Q2. What is Single Line Diagram of Substation
  • Ans. 

    Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.

    • It shows the electrical components and their connections in a simplified manner

    • It helps in understanding the flow of power and voltage levels in the system

    • It is used for planning, designing, and maintenance of the substation

    • It includes information about transformers, circuit breakers, busbars, and other equ...

  • Answered by AI
  • Q3. What is your strength
  • Q4. If the company not provide the payment timely to the contractor, then you will conveyance the contractor for the work

Interview Preparation Tips

Interview preparation tips for other job seekers - Just keep the confidence & positive attitude. Mostly technically & management questions are asked

Lea Associates South Asia Interview FAQs

How many rounds are there in Lea Associates South Asia Assistant Highway Engineer interview?
Lea Associates South Asia interview process usually has 2 rounds. The most common rounds in the Lea Associates South Asia interview process are HR, Resume Shortlist and Technical.
What are the top questions asked in Lea Associates South Asia Assistant Highway Engineer interview?

Some of the top questions asked at the Lea Associates South Asia Assistant Highway Engineer interview -

  1. Why dowel bar is used in ...read more
  2. Question related to previous projects duties and responsibilities. IRC codes an...read more

Tell us how to improve this page.

Lea Associates South Asia Assistant Highway Engineer Interview Process

based on 3 interviews

Interview experience

4
  
Good
View more
Lea Associates South Asia Assistant Highway Engineer Salary
based on 49 salaries
₹3.6 L/yr - ₹7.5 L/yr
9% more than the average Assistant Highway Engineer Salary in India
View more details

Lea Associates South Asia Assistant Highway Engineer Reviews and Ratings

based on 20 reviews

3.8/5

Rating in categories

4.2

Skill development

4.0

Work-life balance

3.3

Salary

3.6

Job security

3.5

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 20 Reviews and Ratings
Deputy Engineer
105 salaries
unlock blur

₹4.6 L/yr - ₹8.1 L/yr

Assistant Bridge Engineer
69 salaries
unlock blur

₹3.8 L/yr - ₹6.5 L/yr

Assistant Engineer
54 salaries
unlock blur

₹3 L/yr - ₹6.5 L/yr

Assistant Highway Engineer
49 salaries
unlock blur

₹3.6 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
42 salaries
unlock blur

₹3.2 L/yr - ₹6.4 L/yr

Explore more salaries
Compare Lea Associates South Asia with

ABCI Infrastructures

3.4
Compare

VIKRAN Engineering & Exim

4.0
Compare

The Louis Berger Group

4.3
Compare

Nesma & Partners

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview