Premium Employer

i

This company page is being actively managed by L. N. Malviya Infra Projects Group Team. If you also belong to the team, you can get access from here

L. N. Malviya Infra Projects Group

Compare button icon Compare button icon Compare

Filter interviews by

L. N. Malviya Infra Projects Group Assistant Highway Engineer Interview Questions, Process, and Tips

Updated 20 Oct 2024

Top L. N. Malviya Infra Projects Group Assistant Highway Engineer Interview Questions and Answers

View all 10 questions

L. N. Malviya Infra Projects Group Assistant Highway Engineer Interview Experiences

5 interviews found

Assistant Highway Engineer Interview Questions & Answers

user image Arpit Kulshreshtha

posted on 20 Oct 2024

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. What is your name
  • Q2. What is the bitumen percentage in DBM
  • Ans. 

    The bitumen percentage in Dense Bituminous Macadam (DBM) typically ranges from 5-7%.

    • Bitumen percentage in DBM is usually around 5-7%

    • The exact percentage may vary based on the specific mix design and project requirements

    • Higher bitumen content provides better durability and resistance to weathering

    • Lower bitumen content may result in a more rigid mix but may be prone to cracking

    • Proper testing and quality control measures ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don’t waste your time with this company
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Basic knowledge of IQ and quantitative and basic reasoning.

Round 3 - Technical 

(1 Question)

  • Q1. Basic to advanced knowledge about civil engineering Highway, transportation.
Round 4 - HR 

(1 Question)

  • Q1. Personal details and salary discussion

Assistant Highway Engineer Interview Questions Asked at Other Companies

Q1. Which Company Paver do you use?
Q2. What should be the maximum speed of paver during DBM LAYING?
Q3. What's maximum camber in superelevation portion
Q4. What is the width of 4 Lane highway?
Q5. Crossfall ,height of embankment,what type of stability
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What is required slum for PQC?
  • Ans. 

    Slump is the required consistency of PQC (Pavement Quality Concrete) for proper construction.

    • The required slump for PQC typically ranges from 20-40 mm.

    • Slump test should be conducted at the site to ensure the correct consistency.

    • Proper slump ensures good workability and strength of the concrete.

    • If the slump is too high, it may lead to segregation and bleeding issues.

    • If the slump is too low, it may result in difficulty i

  • Answered by AI
  • Q2. What is laying temprature for DBM?
  • Ans. 

    The laying temperature for DBM (Dense Bituminous Macadam) typically ranges from 140 to 160 degrees Celsius.

    • Laying temperature for DBM is crucial for achieving proper compaction and bonding of the material.

    • The temperature range of 140-160 degrees Celsius ensures that the DBM is workable and can be compacted effectively.

    • Excessive heat can lead to premature cooling and inadequate compaction, while lower temperatures may r...

  • Answered by AI
  • Q3. What is the maximum thickness of a layer?
  • Ans. 

    The maximum thickness of a layer in highway engineering is typically around 300 mm.

    • Maximum thickness is usually limited to around 300 mm for practical and cost-effective reasons

    • Thicker layers may lead to excessive settlement or instability

    • Thinner layers may not provide adequate strength or durability

    • Examples: Base course layer in flexible pavement is typically around 150-300 mm thick

  • Answered by AI
  • Q4. What is the maximum speed of a compactor
  • Ans. 

    The maximum speed of a compactor varies depending on the type and model, but typically ranges from 2 to 6 miles per hour.

    • The maximum speed of a compactor is usually between 2 to 6 miles per hour.

    • The speed can vary based on the type of compactor (e.g. vibratory, smooth drum) and the model.

    • Higher speed compactors are often used for larger projects where efficiency is key.

    • Lower speed compactors are used for more precise c

  • Answered by AI
  • Q5. What should be the maximum speed of paver during DBM LAYING?
  • Ans. 

    The maximum speed of paver during DBM laying should be around 2-3 km/h to ensure proper compaction and quality of the road surface.

    • The maximum speed of the paver should be controlled to allow for proper compaction of the DBM layer.

    • Excessive speed can lead to inadequate compaction, resulting in a weaker road surface and potential future issues.

    • A speed of 2-3 km/h is generally recommended for DBM laying to achieve optima...

  • Answered by AI

I applied via Referral and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. When did you complete your Degree
Round 3 - Technical 

(4 Questions)

  • Q1. What was the thickness of different layer in your last project?
  • Ans. Sub grade-500mm, WMM-200mm,DLC-150mm,Sand-10mm, Plastic sprater-100micron thick, PQC-360mm.
  • Answered Anonymously
  • Q2. How do you laying pqc?
  • Ans. 

    PQC laying refers to the process of laying a Pavement Quality Concrete (PQC) layer on a highway.

    • Prepare the subgrade by compacting and leveling the surface.

    • Place a layer of granular sub-base material and compact it.

    • Construct the edge forms to define the boundaries of the PQC.

    • Pour the PQC mix onto the prepared surface and spread it evenly.

    • Use a paver machine or manual methods to level and compact the PQC.

    • Cure the PQC by...

  • Answered by AI
  • Q3. Which Company Paver do you use?
  • Ans. 

    I have experience working with various pavers including Caterpillar, Volvo, and Dynapac.

    • I have used Caterpillar pavers on a highway resurfacing project in my previous job.

    • I have also worked with Volvo pavers on a bridge construction project.

    • Dynapac pavers were used on a road widening project that I was a part of.

    • I am familiar with the features and capabilities of each of these pavers.

  • Answered by AI
  • Q4. Writgen company paver

Interview Preparation Tips

Topics to prepare for L. N. Malviya Infra Projects Group Assistant Highway Engineer interview:
  • Highways
Interview preparation tips for other job seekers - You have to send your cv to HR. After selecting you will go for HR round and then technical round will be taken at PIU.

L. N. Malviya Infra Projects Group interview questions for designations

 Assistant Bridge Engineer

 (2)

 Assistant Resident Engineer

 (1)

 Assistant Quality Material Engineer

 (3)

 Road Engineer

 (1)

 Site Engineer

 (1)

 Bridge Engineer

 (1)

 Resident Engineer

 (1)

 Assistant Quality Control Engineer

 (1)

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How to improve soil bearing?
  • Ans. 

    Soil bearing can be improved by various methods.

    • Compaction of soil

    • Adding stabilizers like lime, cement, or fly ash

    • Preloading the soil with a heavy load for a period of time

    • Improving drainage to prevent water accumulation

    • Using geotextiles or geogrids to reinforce the soil

    • Modifying the soil with chemical agents like sodium silicate or calcium chloride

  • Answered by AI
  • Q2. Using soil steblizer
  • Ans. 

    Soil stabilizer is a chemical or mechanical additive used to improve the properties of soil.

    • Soil stabilizers can improve soil strength, durability, and resistance to erosion.

    • Chemical stabilizers include lime, cement, and asphalt emulsions.

    • Mechanical stabilizers include geotextiles and grids.

    • Soil stabilizers are commonly used in road construction and building foundations.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Job Keep posted on website. Visit company website regularly.

Get interview-ready with Top L. N. Malviya Infra Projects Group Interview Questions

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Quality related to highways
  • Q2. About bituminous layers
  • Q3. About Rigid pavement

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. Details of Procurement Process
  • Ans. 

    Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and managing relationships.

    • Identify needs and requirements

    • Research and select potential suppliers

    • Negotiate terms and conditions

    • Create and sign contracts

    • Manage supplier relationships and performance

    • Monitor and evaluate procurement process effectiveness

  • Answered by AI
  • Q2. Understanding the material to be purchased
  • Q3. Suppliers database ans popular suppliers
  • Q4. Achievements in given project assignment
  • Q5. Supplier evaluation and selection process
  • Q6. Awareness of terms and conditions used in EPC projects
  • Q7. Integrity with internal stake holders
  • Ans. 

    Integrity with internal stakeholders is crucial for building trust and maintaining a positive work environment.

    • Communicate openly and honestly with colleagues and superiors

    • Respect confidentiality and avoid gossip or spreading rumors

    • Follow through on commitments and hold yourself accountable

    • Act with fairness and impartiality in decision-making

    • Admit mistakes and take responsibility for correcting them

    • Lead by example and

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - While attending the interview, keep your responses to the point.
Keep your involvement in your existing job and mark/ keep abreast on all such tiny issues, that will represent your strength for the required position.

I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.
Round 3 - Technical 

(1 Question)

  • Q1. What is consolidation of soil?
  • Ans. 

    Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.

    • Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.

    • This process is time-dependent and can take years to complete.

    • Consolidation can cause settlement and deformation of structures built on top of the...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Assistant Manager interview:
  • Soil Mechanics
Interview preparation tips for other job seekers - Prepare technically basic questions

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you left from your current company? What is your job profile? How to manage all things? To whom reported? How many employee in your current & previous company? What was the roll in previous company? Ho...
  • Q2. What is your current job location. What is the project cost? How much percentage hike my salary? What is the leave policy, HR Policies extra .

Interview Preparation Tips

Interview preparation tips for other job seekers - What is the achievements in previous companies.

L. N. Malviya Infra Projects Group Interview FAQs

How many rounds are there in L. N. Malviya Infra Projects Group Assistant Highway Engineer interview?
L. N. Malviya Infra Projects Group interview process usually has 2-3 rounds. The most common rounds in the L. N. Malviya Infra Projects Group interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in L. N. Malviya Infra Projects Group Assistant Highway Engineer interview?

Some of the top questions asked at the L. N. Malviya Infra Projects Group Assistant Highway Engineer interview -

  1. Which Company Paver do you u...read more
  2. What should be the maximum speed of paver during DBM LAYI...read more
  3. What is the maximum thickness of a lay...read more

Tell us how to improve this page.

L. N. Malviya Infra Projects Group Assistant Highway Engineer Interview Process

based on 5 interviews

1 Interview rounds

  • Resume Shortlist Round
View more
Join L. N. Malviya Infra Projects Group 17 years of experiences in Infrastructure Consultancy.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
L. N. Malviya Infra Projects Group Assistant Highway Engineer Salary
based on 46 salaries
₹3.2 L/yr - ₹7.2 L/yr
At par with the average Assistant Highway Engineer Salary in India
View more details

L. N. Malviya Infra Projects Group Assistant Highway Engineer Reviews and Ratings

based on 14 reviews

2.7/5

Rating in categories

2.5

Skill development

2.4

Work-life balance

2.3

Salary

2.7

Job security

2.3

Company culture

2.4

Promotions

2.7

Work satisfaction

Explore 14 Reviews and Ratings
Field Engineer
88 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Assistant Highway Engineer
46 salaries
unlock blur

₹3.2 L/yr - ₹7.2 L/yr

Road Engineer
33 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Assistant Bridge Engineer
32 salaries
unlock blur

₹3.3 L/yr - ₹7.2 L/yr

Assistant Quality Material Engineer
25 salaries
unlock blur

₹3 L/yr - ₹5.4 L/yr

Explore more salaries
Compare L. N. Malviya Infra Projects Group with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview