Premium Employer

i

This company page is being actively managed by L. N. Malviya Infra Projects Group Team. If you also belong to the team, you can get access from here

L. N. Malviya Infra Projects Group

Compare button icon Compare button icon Compare

Filter interviews by

L. N. Malviya Infra Projects Group Environmental Engineer Interview Questions and Answers

Updated 21 Jul 2024

L. N. Malviya Infra Projects Group Environmental Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

General Skills...!!!

Round 2 - Group Discussion 

Civil and Environmental Engineering Processes and Technology Development in Highways Roads Infrastructure etc.

Round 3 - Case Study 

Problam solving approaches and methodologies...!!!

Interview Preparation Tips

Topics to prepare for L. N. Malviya Infra Projects Group Environmental Engineer interview:
  • Civil and environmental
  • Roads Infrastructure
Interview preparation tips for other job seekers - Always devoted to your work and share them to get positive response from expert's with their mandatory reasons for your esteemed organisation because of this published work on the topics of civil and environmental Engineering...!!!
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Environmental Engineering related Topics...!!!

Round 2 - Assignment 

Performence of Technical Writing as well as Reporting and Editing Skills must be Evaluated...!!!

Interview Preparation Tips

Topics to prepare for L. N. Malviya Infra Projects Group Environmental Engineer interview:
  • Towards Consitent AppEnvironment
Interview preparation tips for other job seekers - Dedicated to Work by 💜 Heart... In all respect...!!!

Environmental Engineer Interview Questions Asked at Other Companies

Q1. What is water treatment
Q2. What is STP and ETP? Mention their significance
Q3. What is reverse osmosis
Q4. What is PM 10 & PM 2.5?
Q5. How hard water can be treated?

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your self. About casting yard. About Methodology of casting of different structures. About site progress planning and time cycle of progress. This process is for 30-40 minutes.
Round 3 - HR 

(1 Question)

  • Q1. Details of my Education and experience. Salary negotiation and finalization of joining.

Interview Preparation Tips

Topics to prepare for AECOM Senior Engineer interview:
  • Civil Construction
  • IS Code
  • Your expertise area
Interview preparation tips for other job seekers - Prepare before going to attend an interview on all subject not only in your expertise area.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge

L. N. Malviya Infra Projects Group Interview FAQs

How many rounds are there in L. N. Malviya Infra Projects Group Environmental Engineer interview?
L. N. Malviya Infra Projects Group interview process usually has 2-3 rounds. The most common rounds in the L. N. Malviya Infra Projects Group interview process are Group Discussion, Assignment and Aptitude Test.
How to prepare for L. N. Malviya Infra Projects Group Environmental Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at L. N. Malviya Infra Projects Group. The most common topics and skills that interviewers at L. N. Malviya Infra Projects Group expect are Environmental Engineering.

Tell us how to improve this page.

L. N. Malviya Infra Projects Group Environmental Engineer Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more
Join L. N. Malviya Infra Projects Group 17 years of experiences in Infrastructure Consultancy.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 60 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all

L. N. Malviya Infra Projects Group Environmental Engineer Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

1.0

Work-life balance

1.0

Salary

1.0

Job security

1.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Field Engineer
88 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Assistant Highway Engineer
46 salaries
unlock blur

₹3.2 L/yr - ₹7.2 L/yr

Road Engineer
33 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Assistant Bridge Engineer
32 salaries
unlock blur

₹3.3 L/yr - ₹7.2 L/yr

Assistant Quality Material Engineer
25 salaries
unlock blur

₹3 L/yr - ₹5.4 L/yr

Explore more salaries
Compare L. N. Malviya Infra Projects Group with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview