I applied via Naukri.com and was interviewed in Jun 2024. There were 3 interview rounds.
General Skills...!!!
Civil and Environmental Engineering Processes and Technology Development in Highways Roads Infrastructure etc.
Problam solving approaches and methodologies...!!!
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
Environmental Engineering related Topics...!!!
Performence of Technical Writing as well as Reporting and Editing Skills must be Evaluated...!!!
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 4 interview rounds.
Group discussion of any matter like that any tests process of using material in site work.
Testing of building materials involves following IS codes and codal provisions to ensure quality and safety.
Testing of building materials is essential to ensure quality and safety in construction projects.
IS codes are standards set by the Bureau of Indian Standards (BIS) for various building materials.
Codal provisions refer to the regulations and guidelines specified by relevant authorities for the use of building mate...
I applied via Walk-in and was interviewed before Oct 2023. There was 1 interview round.
The bitumen percentage in Dense Bituminous Macadam (DBM) typically ranges from 5-7%.
Bitumen percentage in DBM is usually around 5-7%
The exact percentage may vary based on the specific mix design and project requirements
Higher bitumen content provides better durability and resistance to weathering
Lower bitumen content may result in a more rigid mix but may be prone to cracking
Proper testing and quality control measures ...
L. N. Malviya Infra Projects Group interview questions for popular designations
Basic knowledge of IQ and quantitative and basic reasoning.
Get interview-ready with Top L. N. Malviya Infra Projects Group Interview Questions
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Slump is the required consistency of PQC (Pavement Quality Concrete) for proper construction.
The required slump for PQC typically ranges from 20-40 mm.
Slump test should be conducted at the site to ensure the correct consistency.
Proper slump ensures good workability and strength of the concrete.
If the slump is too high, it may lead to segregation and bleeding issues.
If the slump is too low, it may result in difficulty i
The laying temperature for DBM (Dense Bituminous Macadam) typically ranges from 140 to 160 degrees Celsius.
Laying temperature for DBM is crucial for achieving proper compaction and bonding of the material.
The temperature range of 140-160 degrees Celsius ensures that the DBM is workable and can be compacted effectively.
Excessive heat can lead to premature cooling and inadequate compaction, while lower temperatures may r...
The maximum thickness of a layer in highway engineering is typically around 300 mm.
Maximum thickness is usually limited to around 300 mm for practical and cost-effective reasons
Thicker layers may lead to excessive settlement or instability
Thinner layers may not provide adequate strength or durability
Examples: Base course layer in flexible pavement is typically around 150-300 mm thick
The maximum speed of a compactor varies depending on the type and model, but typically ranges from 2 to 6 miles per hour.
The maximum speed of a compactor is usually between 2 to 6 miles per hour.
The speed can vary based on the type of compactor (e.g. vibratory, smooth drum) and the model.
Higher speed compactors are often used for larger projects where efficiency is key.
Lower speed compactors are used for more precise c
The maximum speed of paver during DBM laying should be around 2-3 km/h to ensure proper compaction and quality of the road surface.
The maximum speed of the paver should be controlled to allow for proper compaction of the DBM layer.
Excessive speed can lead to inadequate compaction, resulting in a weaker road surface and potential future issues.
A speed of 2-3 km/h is generally recommended for DBM laying to achieve optima...
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
Load actions on a bridge refer to the various forces and weights that act on the structure, including dead loads, live loads, wind loads, and seismic loads.
Dead loads are the permanent weight of the bridge structure itself, such as the weight of the beams, deck, and piers.
Live loads are the temporary loads that move across the bridge, such as vehicles, pedestrians, and traffic.
Wind loads are the forces exerted by wind ...
I applied via Walk-in and was interviewed in Jul 2022. There were 2 interview rounds.
Concrete M25 refers to a mix of concrete that has a compressive strength of 25 N/mm² after 28 days of curing.
M25 is a mix of concrete that contains a ratio of 1:1:2 of cement, sand, and aggregate respectively.
It is commonly used in the construction of buildings, bridges, and other structures.
The compressive strength of M25 concrete is achieved after 28 days of curing.
The strength of the concrete can be increased by usi...
Compressive strength of concrete is its ability to resist compression or withstand loads that tend to reduce its size.
Compressive strength is measured by applying a compressive load to a concrete cylinder or cube until failure occurs.
The strength of concrete is affected by factors such as water-cement ratio, curing conditions, and aggregate type.
The compressive strength of concrete is important in determining the load-...
I applied via Referral and was interviewed before Sep 2021. There were 3 interview rounds.
PQC laying refers to the process of laying a Pavement Quality Concrete (PQC) layer on a highway.
Prepare the subgrade by compacting and leveling the surface.
Place a layer of granular sub-base material and compact it.
Construct the edge forms to define the boundaries of the PQC.
Pour the PQC mix onto the prepared surface and spread it evenly.
Use a paver machine or manual methods to level and compact the PQC.
Cure the PQC by...
I have experience working with various pavers including Caterpillar, Volvo, and Dynapac.
I have used Caterpillar pavers on a highway resurfacing project in my previous job.
I have also worked with Volvo pavers on a bridge construction project.
Dynapac pavers were used on a road widening project that I was a part of.
I am familiar with the features and capabilities of each of these pavers.
Top trending discussions
Interview experience
based on 343 reviews
Rating in categories
Field Engineer
90
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Assistant Bridge Engineer
55
salaries
| ₹3 L/yr - ₹8 L/yr |
Assistant Highway Engineer
52
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Road Engineer
33
salaries
| ₹3 L/yr - ₹4 L/yr |
Lab Technician
25
salaries
| ₹1.7 L/yr - ₹4.3 L/yr |
GMR Group
Larsen & Toubro Limited
Reliance Infrastructure
Tata Projects