The minimum thickness of a slab depends on various factors such as load, span, and material used.
The minimum thickness of a slab is determined by the load it needs to support. Heavier loads require thicker slabs.
The span or distance between supports also affects the minimum thickness. Longer spans may require thicker slabs.
The material used for the slab also plays a role. Different materials have different strength pro...
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
Initial setting time and Final setting time of Cement refers to the time taken for the cement to change from a liquid to a solid state.
Initial setting time is the time taken for the cement paste to lose its plasticity and become rigid enough to resist certain defined pressure.
Final setting time is the time taken for the cement paste to completely harden and attain its full strength.
The setting time of cement is influen...
Top trending discussions
Interview experience
based on 344 reviews
Rating in categories
Field Engineer
90
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Assistant Bridge Engineer
55
salaries
| ₹3 L/yr - ₹8 L/yr |
Assistant Highway Engineer
52
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Road Engineer
33
salaries
| ₹3 L/yr - ₹4 L/yr |
Lab Technician
25
salaries
| ₹1.7 L/yr - ₹4.3 L/yr |
GMR Group
Larsen & Toubro Limited
Reliance Infrastructure
Tata Projects