Filter interviews by
The maximum camber in the superelevation portion of a highway is the maximum slope or tilt of the road surface.
Camber is the slope provided to the road surface to counteract the centrifugal force acting on vehicles during turns.
Superelevation is the banking of the road at curves to allow vehicles to safely negotiate the turn at higher speeds.
The maximum camber in the superelevation portion is determined by various fact...
I applied via Job Fair and was interviewed in May 2018. There were 3 interview rounds.
posted on 5 Dec 2020
I applied via Company Website and was interviewed in Jun 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.
No GD
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
Hydration is the process of providing adequate fluids to the body to maintain proper function.
Hydration is essential for overall health and well-being
It helps regulate body temperature, transport nutrients, and remove waste
Drinking water, consuming fruits and vegetables, and electrolyte-rich beverages are ways to stay hydrated
I applied via Walk-in and was interviewed before Jun 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.
SG top layer finishing work refers to the final layer of asphalt or concrete pavement on a road or highway.
SG top layer finishing work is the final layer of pavement on a road or highway
It is typically made of asphalt or concrete
The purpose of this layer is to provide a smooth and durable driving surface
It also helps to protect the underlying layers from damage and wear
Examples of SG top layer finishing work include ch
WMM top layer finishing work is the final layer of construction in a road pavement.
WMM stands for Wet Mix Macadam, which is a type of road construction material.
The top layer of WMM is usually made up of crushed aggregates and is laid to a thickness of 50-75mm.
The top layer is compacted using a vibratory roller to achieve the desired density and smoothness.
The finishing work involves trimming the edges of the road, rem...
based on 8 reviews
Rating in categories
Assistant Engineer
144
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Junior Engineer
108
salaries
| ₹1.8 L/yr - ₹4.1 L/yr |
Assistant Manager
78
salaries
| ₹4.8 L/yr - ₹11 L/yr |
Store Keeper
51
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Accounts Officer
49
salaries
| ₹3.2 L/yr - ₹6.6 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Nagarjuna Construction Company