Upload Button Icon Add office photos

PNC Infratech

Compare button icon Compare button icon Compare

Filter interviews by

PNC Infratech Assistant Highway Engineer Interview Questions and Answers

Updated 27 Jul 2021

PNC Infratech Assistant Highway Engineer Interview Experiences

1 interview found

Interview Questionnaire 

1 Question

  • Q1. What's maximum camber in superelevation portion
  • Ans. 

    The maximum camber in the superelevation portion of a highway is the maximum slope or tilt of the road surface.

    • Camber is the slope provided to the road surface to counteract the centrifugal force acting on vehicles during turns.

    • Superelevation is the banking of the road at curves to allow vehicles to safely negotiate the turn at higher speeds.

    • The maximum camber in the superelevation portion is determined by various fact...

  • Answered by AI

Interview questions from similar companies

I applied via Job Fair and was interviewed in May 2018. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. This round is very important for share your experience for technical HR.
  • Q2. This round is satisfied for HR in all level for company requirements.
  • Q3. HR Interview to correlate in our behaviour and about for introduce yourself and family detail.

Interview Preparation Tips

General Tips: All Interviews for not stressful but I make these Interviews for scared and stressful.
These Interviews to clarify for your behaviour and position.
Skills: Logical Thinking, Hard work, Analytical problem solving,, Problem Solving, Analytical Skills, Time Management, Decision Making Skills
Duration: 1-4 weeks

I applied via Company Website and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. BBS regarding pile cap, pier, and quality related questions I.e about steel and concrete.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be in Confidence and hv command on your previous years experience.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Why are you looking for a change?
  • Q2. Why should we hire you?
  • Q3. Tell me about yourself.
  • Q4. Share details of your previous job.
  • Q5. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep prepared yourself and your professional working experience
Round 1 - Aptitude Test 
Round 2 - Technical 

(1 Question)

  • Q1. Highway knowledge & lab knowledge good Exerpince in earth work...for interview

Interview Preparation Tips

Interview preparation tips for other job seekers - Lab experience & more question asking

I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Telephone questions road work
  • Q2. Telephone questions
  • Q3. Telephone questions
  • Q4. Telephone questions road work

Interview Preparation Tips

Interview preparation tips for other job seekers - Highway
Round 1 - Group Discussion 

No GD

Round 2 - One-on-one 

(1 Question)

  • Q1. Base question for civil

Interview Preparation Tips

Interview preparation tips for other job seekers - Input requirements is fix for all yes
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain hydration
  • Ans. 

    Hydration is the process of providing adequate fluids to the body to maintain proper function.

    • Hydration is essential for overall health and well-being

    • It helps regulate body temperature, transport nutrients, and remove waste

    • Drinking water, consuming fruits and vegetables, and electrolyte-rich beverages are ways to stay hydrated

  • Answered by AI

I applied via Walk-in and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Prepare BBS sheet , study a drawing and calculate the Quantity Details , about Contractors Billing, preparing Daily and monthly progress report,Study the Drawing and BOQ preparation and raising the materi...

Interview Preparation Tips

Topics to prepare for G R Infraprojects Billing Engineer interview:
  • Billing
Interview preparation tips for other job seekers - Don’t worry.They are Very Friendly. If you don’t know the answer of any questions then tell them. They will give you the answer.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(7 Questions)

  • Q1. Level chak tolrensh quantity
  • Q2. Level sheet site trail
  • Q3. Site supervisor side measurement re wall exiovation
  • Q4. SG top layer finishing work
  • Ans. 

    SG top layer finishing work refers to the final layer of asphalt or concrete pavement on a road or highway.

    • SG top layer finishing work is the final layer of pavement on a road or highway

    • It is typically made of asphalt or concrete

    • The purpose of this layer is to provide a smooth and durable driving surface

    • It also helps to protect the underlying layers from damage and wear

    • Examples of SG top layer finishing work include ch

  • Answered by AI
  • Q5. GSB top layer finishing work
  • Q6. Wmm top layer finishing work
  • Ans. 

    WMM top layer finishing work is the final layer of construction in a road pavement.

    • WMM stands for Wet Mix Macadam, which is a type of road construction material.

    • The top layer of WMM is usually made up of crushed aggregates and is laid to a thickness of 50-75mm.

    • The top layer is compacted using a vibratory roller to achieve the desired density and smoothness.

    • The finishing work involves trimming the edges of the road, rem...

  • Answered by AI
  • Q7. DBM laying work in dlc laying work pqc BC working and ogl changing

Interview Preparation Tips

Interview preparation tips for other job seekers - Highway site working DBM laying work in wmm laynig

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
Tata Projects Interview Questions
4.2
 • 447 Interviews
KEC International Interview Questions
4.0
 • 308 Interviews
Dilip Buildcon Interview Questions
4.0
 • 145 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all
PNC Infratech Assistant Highway Engineer Salary
based on 33 salaries
₹2.5 L/yr - ₹5.2 L/yr
15% less than the average Assistant Highway Engineer Salary in India
View more details

PNC Infratech Assistant Highway Engineer Reviews and Ratings

based on 8 reviews

4.7/5

Rating in categories

4.2

Skill development

4.5

Work-life balance

4.0

Salary

4.3

Job security

4.4

Company culture

3.0

Promotions

4.8

Work satisfaction

Explore 8 Reviews and Ratings
Assistant Engineer
144 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Junior Engineer
108 salaries
unlock blur

₹1.8 L/yr - ₹4.1 L/yr

Assistant Manager
78 salaries
unlock blur

₹4.8 L/yr - ₹11 L/yr

Store Keeper
51 salaries
unlock blur

₹2.2 L/yr - ₹4 L/yr

Accounts Officer
49 salaries
unlock blur

₹3.2 L/yr - ₹6.6 L/yr

Explore more salaries
Compare PNC Infratech with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview