Filter interviews by
I applied via Job Fair and was interviewed in May 2018. There were 3 interview rounds.
Top trending discussions
posted on 4 Aug 2024
Road construction involves several steps including planning, designing, clearing the land, laying the foundation, paving, and adding finishing touches.
Planning: Determine the route, traffic flow, and necessary permits.
Designing: Create detailed plans including width, materials, and drainage systems.
Clearing the land: Remove trees, rocks, and other obstacles.
Laying the foundation: Level the ground, add layers of gravel ...
Sub grade to wearing course technical specifications include material type, thickness, compaction requirements, and drainage considerations.
Material type for sub grade can be natural soil, stabilized soil, or aggregate base.
Thickness of sub grade is typically specified based on soil conditions and traffic loads.
Compaction requirements ensure proper density and strength of the sub grade.
Wearing course materials can incl...
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
Hydration is the process of providing adequate fluids to the body to maintain proper function.
Hydration is essential for overall health and well-being
It helps regulate body temperature, transport nutrients, and remove waste
Drinking water, consuming fruits and vegetables, and electrolyte-rich beverages are ways to stay hydrated
posted on 21 Sep 2021
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
posted on 27 Jan 2021
I applied via Recruitment Consultant and was interviewed in Jul 2020. There were 4 interview rounds.
I have experience in drawing various types of bridges including beam, truss, arch, suspension, and cable-stayed bridges.
Beam bridges - simple and economical design with horizontal beams supported by piers or abutments
Truss bridges - composed of interconnected triangles for added strength and stability
Arch bridges - curved design that distributes weight evenly to supports at each end
Suspension bridges - main cables anch...
posted on 15 Aug 2024
Being customer oriented means focusing on delivering results that meet the needs and expectations of the customer.
Understanding the needs and preferences of customers
Providing excellent customer service
Ensuring customer satisfaction and loyalty
Adapting products or services to meet customer demands
Seeking feedback and implementing improvements based on customer input
posted on 8 Apr 2024
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.
Earthwork quantity can be calculated by using the formula: Volume = Area x Depth
Calculate the area of the earthwork site (length x width)
Determine the depth of excavation or fill required
Multiply the area by the depth to get the volume of earthwork
Consider any slopes or irregular shapes in the calculation
Use software like AutoCAD or Excel for accurate calculations
To calculate re wall quantity and rate, measure the area of the wall and determine the cost per unit area.
Measure the length and height of the wall to calculate the area in square feet or square meters.
Determine the cost per unit area by dividing the total cost of materials and labor by the total area of the wall.
Multiply the area of the wall by the cost per unit area to calculate the total cost of the wall.
Example: If...
I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.
posted on 21 Oct 2023
I applied via Company Website and was interviewed in Sep 2023. There were 3 interview rounds.
The maximum on BOCW & site situation refers to the highest number of workers allowed on a construction site based on safety regulations.
BOCW stands for Building and Other Construction Workers, regulations set limits on the number of workers allowed on site
Site situation includes factors like space, hazards, and emergency evacuation plans
Maximum number of workers should be determined based on safety assessments and comp
Interview experience
based on 4 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
720
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
527
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Civil Site Engineer
380
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
324
salaries
| ₹5 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA