SG top layer finishing work refers to the final layer of asphalt or concrete pavement on a road or highway.
SG top layer finishing work is the final layer of pavement on a road or highway
It is typically made of asphalt or concrete
The purpose of this layer is to provide a smooth and durable driving surface
It also helps to protect the underlying layers from damage and wear
Examples of SG top layer finishing work include ch
WMM top layer finishing work is the final layer of construction in a road pavement.
WMM stands for Wet Mix Macadam, which is a type of road construction material.
The top layer of WMM is usually made up of crushed aggregates and is laid to a thickness of 50-75mm.
The top layer is compacted using a vibratory roller to achieve the desired density and smoothness.
The finishing work involves trimming the edges of the road, rem...
I applied via Company Website and was interviewed in Mar 2023. There were 2 interview rounds.
Dilip Buildcon interview questions for designations
Top trending discussions
I applied via Naukri.com
According to the topic
Some projects needful for you
Presence of mind
Knowledge of me in this field
No GD
I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.
To remove bumping in sg at hard rock areas, proper rock excavation techniques and road design considerations are necessary.
Perform thorough rock excavation to remove any irregularities or protrusions in the hard rock areas.
Ensure proper compaction of the subgrade and base layers to minimize settlement and unevenness.
Design the road profile with appropriate cross slopes and superelevation to facilitate smooth vehicle mo...
The grade of GSB used in previous projects varies depending on the specific project requirements.
The grade of GSB (Granular Sub-Base) used in previous projects is determined based on factors such as traffic load, soil conditions, and project specifications.
Different grades of GSB, such as GSB-20, GSB-25, GSB-30, etc., may be used in different projects.
For example, in a high-traffic highway project, a higher grade of GS...
based on 5 interviews
2 Interview rounds
based on 39 reviews
Rating in categories
Senior Engineer
213
salaries
| ₹4 L/yr - ₹11 L/yr |
Asst Store
202
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Assistant Manager
198
salaries
| ₹3.4 L/yr - ₹11 L/yr |
Store Executive
197
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Structural Engineer
179
salaries
| ₹2 L/yr - ₹6.7 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
PNC Infratech