M-20 grade ratio is the mix proportion of cement, sand and aggregate for making concrete of strength 20 MPa.
M-20 grade concrete is commonly used for residential and commercial construction.
The ratio of cement:sand:aggregate is 1:1.5:3.
For 1 cubic meter of concrete, 0.28 cubic meters of cement, 0.42 cubic meters of sand, and 0.84 cubic meters of coarse aggregate are required.
A site engineer is responsible for overseeing construction projects and ensuring they are completed on time and within budget.
Managing and supervising construction activities
Ensuring compliance with building codes and regulations
Preparing and submitting progress reports
Collaborating with architects, contractors, and other stakeholders
Monitoring project budgets and timelines
Ensuring safety protocols are followed on site
Steel is used in steel structures due to its high strength, durability, and versatility.
Steel has a high strength-to-weight ratio, making it ideal for supporting heavy loads.
It is also durable and resistant to corrosion, making it suitable for outdoor structures.
Steel can be easily fabricated into various shapes and sizes, allowing for versatile design options.
Examples of steel structures include skyscrapers, bridges,
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
Yes, code for concrete refers to the specific mix design used in construction.
Code for concrete includes the proportions of cement, aggregates, water, and additives used in a specific mix design.
Different codes and standards (such as ACI, ASTM) provide guidelines for designing concrete mixes for different applications.
For example, ACI 318 provides requirements for structural concrete used in buildings and other structu
Top trending discussions
posted on 9 Nov 2024
I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.
RCC road construction involves using reinforced concrete for durability and strength.
RCC stands for Reinforced Cement Concrete
Specifications include using high-quality cement, aggregates, and steel reinforcement
Proper compaction and curing are essential for durability
Thickness of the RCC road depends on traffic load and subgrade conditions
Joint spacing should be as per design specifications
Building construction activities include excavation, foundation work, framing, roofing, electrical work, plumbing, and finishing.
Excavation: Digging the foundation and preparing the site
Foundation work: Pouring concrete and setting the foundation
Framing: Building the structure's skeleton with wood or steel beams
Roofing: Installing the roof materials
Electrical work: Wiring the building for electricity
Plumbing: Installin...
Background condition refers to the existing circumstances or situation that has led to the current state of affairs.
Background condition can include factors such as previous experiences, events, or decisions that have influenced the current situation.
It is important to consider the background condition when analyzing a problem or making decisions.
For example, in engineering, understanding the background condition of a ...
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
Hydration is the process of providing adequate fluids to the body to maintain proper function.
Hydration is essential for overall health and well-being
It helps regulate body temperature, transport nutrients, and remove waste
Drinking water, consuming fruits and vegetables, and electrolyte-rich beverages are ways to stay hydrated
posted on 30 Mar 2024
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Thermodynamics is the branch of physics that deals with the relationships between heat, work, and energy.
Study of energy transformations in physical systems
Involves concepts like heat, work, temperature, and energy
Laws of thermodynamics govern energy transfer and conversion
Used in engineering for designing engines, refrigeration systems, etc.
posted on 9 Jan 2021
I applied via Walk-in and was interviewed in Dec 2020. There were 4 interview rounds.
I applied via Job Fair and was interviewed in May 2018. There were 3 interview rounds.
based on 34 reviews
Rating in categories
Assistant Engineer
171
salaries
| ₹2 L/yr - ₹6 L/yr |
Junior Engineer
107
salaries
| ₹1.8 L/yr - ₹4.6 L/yr |
Assistant Manager
63
salaries
| ₹5 L/yr - ₹12.5 L/yr |
Accounts Officer
52
salaries
| ₹3.2 L/yr - ₹6.6 L/yr |
Highway Engineer
50
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
Simplex Infrastructures