I applied via Naukri.com and was interviewed before Dec 2020. There were 2 interview rounds.
Costing and budget of building
Costing and budgeting are crucial aspects of any building project
It involves estimating the cost of materials, labor, and other expenses
Creating a budget helps in managing the project and avoiding overspending
Regular monitoring and updating of the budget is necessary to ensure the project stays on track
Factors like inflation, unexpected expenses, and changes in scope can impact the budget
posted on 13 Dec 2022
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.
Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.
Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.
Eq...
Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.
It shows the electrical components and their connections in a simplified manner
It helps in understanding the flow of power and voltage levels in the system
It is used for planning, designing, and maintenance of the substation
It includes information about transformers, circuit breakers, busbars, and other equ...
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
posted on 31 Oct 2023
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
based on 6 reviews
Rating in categories
Senior Engineer
43
salaries
| ₹6 L/yr - ₹11.1 L/yr |
Senior Civil Engineer
21
salaries
| ₹4.2 L/yr - ₹9.5 L/yr |
Project Manager
20
salaries
| ₹9.1 L/yr - ₹13.8 L/yr |
Junior Engineer Civil
17
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Junior Engineer
16
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Lea Associates South Asia
ABCI Infrastructures
VIKRAN Engineering & Exim
The Louis Berger Group