I applied via Newspaper Ad and was interviewed in Feb 2023. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
Developed a unique algorithm to optimize data processing in a large-scale distributed system.
Identified a bottleneck in the system's data processing pipeline
Implemented a parallel processing approach to distribute the workload across multiple nodes
Utilized a combination of caching and pre-processing techniques to reduce computational overhead
Achieved a significant improvement in overall system performance and reduced p
Yes
Yes, I have received constructive criticism on my work assignments.
I always view constructive criticism as an opportunity for growth and improvement.
I actively listen to the feedback provided and take notes to ensure I understand the areas that need improvement.
I analyze the criticism objectively and identify areas where I can make adjustments or implement changes.
I seek clarification if needed and ask for specific ...
I have extensive experience interfacing with clients both directly and indirectly.
I have worked as a Senior Engineer for the past five years, where I have regularly interacted with clients.
I have directly communicated with clients to gather requirements, provide updates, and address any concerns or issues.
I have also indirectly interfaced with clients through project managers and business analysts, ensuring their needs...
Yes, I have experience dealing with treatment plant equipment such as screens, grit, macerator, and sludge handling equipment.
I have worked on various projects involving the installation and maintenance of treatment plant equipment.
I am familiar with the operation and troubleshooting of screens used for removing large debris from wastewater.
I have experience with grit removal systems that separate sand, gravel, and oth...
Yes
Implemented a new Agile methodology to improve team productivity
Introduced a knowledge sharing platform to encourage continuous learning
Implemented a mentorship program to foster professional growth
Introduced automated testing tools to improve software quality
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I was interviewed in May 2023.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Some of the top questions asked at the The Louis Berger Group Civil Site Engineer interview -
based on 3 interviews
Interview experience
based on 3 reviews
Rating in categories
Civil Inspector
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Section Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Resident Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Bridge Design Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
Bechtel
Fluor Corporation