Filter interviews by
Clear (1)
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
Top trending discussions
posted on 23 Aug 2023
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 2 interview rounds.
Pipe rack design involves determining layout, sizing, and support requirements for pipes in an industrial facility.
Start by determining the layout of the pipe rack based on the piping system requirements and plant layout.
Calculate the pipe sizes and materials based on the flow rates, pressure, and temperature requirements.
Design the supports for the pipe rack to ensure stability and safety.
Consider factors such as seis...
posted on 14 Jun 2024
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Job Fair and was interviewed before Jun 2022. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in May 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Nov 2024. There were 3 interview rounds.
Occurrence of the elements in descending order.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
Developed a unique algorithm to optimize data processing in a large-scale distributed system.
Identified a bottleneck in the system's data processing pipeline
Implemented a parallel processing approach to distribute the workload across multiple nodes
Utilized a combination of caching and pre-processing techniques to reduce computational overhead
Achieved a significant improvement in overall system performance and reduced p
Yes
Yes, I have received constructive criticism on my work assignments.
I always view constructive criticism as an opportunity for growth and improvement.
I actively listen to the feedback provided and take notes to ensure I understand the areas that need improvement.
I analyze the criticism objectively and identify areas where I can make adjustments or implement changes.
I seek clarification if needed and ask for specific ...
I have extensive experience interfacing with clients both directly and indirectly.
I have worked as a Senior Engineer for the past five years, where I have regularly interacted with clients.
I have directly communicated with clients to gather requirements, provide updates, and address any concerns or issues.
I have also indirectly interfaced with clients through project managers and business analysts, ensuring their needs...
Yes, I have experience dealing with treatment plant equipment such as screens, grit, macerator, and sludge handling equipment.
I have worked on various projects involving the installation and maintenance of treatment plant equipment.
I am familiar with the operation and troubleshooting of screens used for removing large debris from wastewater.
I have experience with grit removal systems that separate sand, gravel, and oth...
Yes
Implemented a new Agile methodology to improve team productivity
Introduced a knowledge sharing platform to encourage continuous learning
Implemented a mentorship program to foster professional growth
Introduced automated testing tools to improve software quality
Civil Inspector
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Section Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Resident Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Bridge Design Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
Bechtel
Fluor Corporation