Filter interviews by
Clear (1)
Dtr & PSS structure of SLD refers to Distribution Transformer and Package Substation structure in Single Line Diagram.
Dtr stands for Distribution Transformer which is used to step down voltage for distribution purposes.
PSS stands for Package Substation which is a compact unit containing transformers, switchgear, and control equipment.
In a Single Line Diagram (SLD), Dtr and PSS are represented by symbols to show their l...
PTR stands for Project Technical Report.
PTR is a document that summarizes the technical aspects of a project.
It includes details such as project scope, objectives, methodology, results, and conclusions.
PTRs are often used to communicate project progress and findings to stakeholders.
LT pole election rule refers to the guidelines and regulations for selecting and installing low tension electrical poles.
LT pole election rule specifies the criteria for selecting the appropriate location for installing low tension electrical poles.
It includes factors such as distance from buildings, roadways, and other structures, as well as soil conditions and accessibility.
Compliance with LT pole election rule ensur...
Coil earthing is a method of grounding electrical systems to prevent electric shock and ensure safety.
Coil earthing involves burying a coil of wire in the ground to create a low-resistance path for electrical currents to flow safely.
The depth at which the coil should be buried depends on factors such as soil type, moisture content, and local regulations.
Proper installation of coil earthing is essential to protect equip...
Top trending discussions
I applied via Job Fair and was interviewed before Jun 2022. There were 5 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.
It depends on the region, for me they conducted tool test in the 1st round.
based on 2 interviews
Interview experience
based on 6 reviews
Rating in categories
Civil Inspector
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Section Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Resident Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Bridge Design Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
Bechtel
Fluor Corporation