Shuttering material refers to temporary structures used in construction projects to support concrete during the curing process.
Shuttering material is required to provide formwork support for concrete structures.
It helps in creating the desired shape and structure of the concrete element.
Common types of shuttering materials include plywood, steel, aluminum, and plastic.
The choice of material depends on factors like proj...
Yes
Yes, I am able to formulate claim raising and defending strategies based on contractual provisions.
I have extensive experience in contract management and have successfully raised and defended claims in my previous roles.
I am well-versed in analyzing contractual provisions and identifying the relevant clauses for formulating effective strategies.
I have a strong understanding of contract law and can leverage it to dev...
Preliminary drawing, as-built drawing, drawing schedule, and proof checking are all important aspects of the design and construction process.
Preliminary drawing: Initial sketches or plans that outline the basic design concept.
As-built drawing: Final drawings that reflect any changes made during construction.
Drawing schedule: A timeline or list that outlines when each drawing is expected to be completed.
Proof checking: ...
The sources and quantity of materials in projects are determined based on the tender requirements.
The sources of materials in projects are determined through a procurement process.
The quantity of materials required is specified in the tender documents.
The tender documents may include a bill of quantities or a detailed scope of work.
The procurement team evaluates potential suppliers and selects the most suitable ones.
Th...
Rate analysis of earthwork for road project involves calculating the cost of excavation, transportation, and compaction of soil.
Rate analysis helps in estimating the cost of earthwork for road construction.
It involves determining the quantity of earthwork required and the rates for excavation, transportation, and compaction.
The rates are based on factors like the type of soil, distance of transportation, and equipment ...
The S-Curve is a graphical representation of the growth or progress of a project or business over time.
The S-Curve is named after its shape, which resembles the letter 'S'.
It is commonly used in project management to track and visualize the progress of tasks or activities.
The curve typically shows slow progress at the beginning, followed by a rapid growth phase, and then a tapering off towards the end.
The S-Curve helps...
Preparing a R0 budget for a road project involves several steps and considerations.
Identify the scope and objectives of the road project
Estimate the quantities of materials and resources required
Determine the unit costs of materials, labor, and equipment
Calculate the total cost for each item and activity
Consider any contingencies or unforeseen expenses
Sum up the costs to create the overall budget
Review and refine the b
Change of Scope in a road project refers to any modifications or alterations made to the original project plan.
Change of scope can include changes in project objectives, deliverables, timelines, or budget.
It may involve adding or removing features, adjusting the project scope, or redefining project requirements.
For example, if a road project initially planned to construct a two-lane road but later decides to expand it ...
Price adjustment is a mechanism to account for changes in project costs. It helps in maintaining project profitability.
Price adjustment is a provision in a contract that allows for changes in project costs due to various factors such as inflation, currency fluctuations, or changes in material prices.
Its role in project cost is to ensure that the project remains financially viable and profitable despite cost fluctuation...
I appeared for an interview in Jan 2025.
Plan and profile drawings are used in highway engineering to show the horizontal and vertical alignment of a road.
Plan drawing shows the horizontal alignment of the road, including curves, intersections, and other features.
Profile drawing shows the vertical alignment of the road, including grades, slopes, and elevations.
Both drawings are used together to provide a comprehensive view of the road design.
Plan and profile ...
Rigid pavement is made of concrete while flexible pavement is made of asphalt.
Rigid pavement is made of concrete and has high flexural strength.
Flexible pavement is made of asphalt and has low flexural strength.
Rigid pavement is more durable and requires less maintenance compared to flexible pavement.
Flexible pavement is easier and cheaper to repair and maintain.
Examples of rigid pavement include concrete highways and ...
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
How can one effectively handle various situations during operations without feeling blank or stressed? Maintain patience and approach your tasks with complete confidence. If you find yourself stuck, discuss the matters with your senior or supervisor.
PNC Infratech interview questions for popular designations
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
The valve size refers to the diameter of the valve opening, typically measured in inches or millimeters.
Valve size is important for determining flow rate and pressure drop in a system.
Common valve sizes include 1/2", 3/4", 1", etc.
Valve size may vary depending on the application and required flow rate.
DI pipe can be measured using a measuring tape or a caliper.
Measure the diameter of the DI pipe using a measuring tape or caliper.
Ensure the measurement is taken at the widest point of the pipe.
Record the measurement accurately for reference and future use.
My current CTC before this company is $80,000 per year.
My current CTC is $80,000 per year
I have been earning this amount for the past two years
I received a 10% raise in my previous job, bringing my CTC to $80,000
Expected CTC in this company depends on various factors such as experience, qualifications, and negotiation skills.
Expected CTC can vary based on the level of experience - entry level, mid-level, senior level.
Qualifications and certifications can also impact the expected CTC.
Negotiation skills play a crucial role in determining the final CTC offer.
Researching industry standards and company policies can give an idea of
Get interview-ready with Top PNC Infratech Interview Questions
Regarding SAP t code and store system
Store working system
I appeared for an interview in Jan 2025.
I applied via Referral and was interviewed in Aug 2024. There were 2 interview rounds.
All about to known facts towards store
Talking about ay last job and about my department
I applied via Naukri.com and was interviewed in Nov 2023. There were 7 interview rounds.
Compressive strength of cube
All test all tests quality control
Bitumen, Aggregate test, cement test,????
Coding test all questions
All tests quality control in Lab engineering
Top trending discussions
Some of the top questions asked at the PNC Infratech interview -
The duration of PNC Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 69 interviews
Interview experience
based on 934 reviews
Rating in categories
Assistant Engineer
172
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
111
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
78
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
Simplex Infrastructures