Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
Design optimization can be achieved through various methods such as simulation, iteration, and utilization of advanced tools.
Utilize simulation software to test different design scenarios and identify the most optimal solution
Iterate on the design by making incremental changes and evaluating the impact on performance
Use advanced tools like finite element analysis (FEA) or computational fluid dynamics (CFD) for detailed...
Expectations for monetary benefits should align with industry standards and reflect the level of responsibility and experience required for the Senior Manager role.
Monetary benefits should be competitive with market rates for Senior Manager positions.
Consider additional perks such as bonuses, stock options, or benefits packages.
Negotiate for salary increases based on performance and achievements.
Ensure transparency and...
I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
posted on 25 Jan 2025
I was interviewed in Dec 2024.
The interview was thorough and challenging, with a focus on leadership experience and problem-solving skills.
Discussed previous leadership roles and how I handled challenging situations
Gave examples of successful projects I managed and the outcomes
Talked about my problem-solving approach and strategies
Asked about my vision for the team and how I would drive success
I had a positive experience with the work culture in my previous job.
Encouraged collaboration and teamwork
Open communication between employees and management
Emphasis on work-life balance
Recognition and appreciation for hard work
Supportive and inclusive environment
I have over 10 years of experience in senior management roles, leading teams and driving strategic initiatives.
Led cross-functional teams to successfully launch new products
Implemented cost-saving measures resulting in a 15% increase in profitability
Developed and executed strategic plans to drive business growth
Managed key client relationships and negotiated contracts
Yes, I am open to relocating for the right opportunity.
I am open to relocating for the right opportunity
I have relocated for previous roles and am comfortable with the process
I am excited about the possibility of experiencing a new location and culture
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
I achieved a 150% increase in sales target by implementing a new marketing strategy.
Set ambitious but achievable targets
Analyzed market trends and customer behavior
Implemented a new marketing strategy focusing on customer engagement
Provided training and motivation to the sales team
Regularly monitored progress and made adjustments as needed
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
To make a budget for a project, identify all expenses and allocate funds accordingly.
Identify all expenses including labor, materials, equipment, and any other costs
Estimate the cost of each expense and allocate funds accordingly
Consider any potential risks or unexpected expenses and allocate contingency funds
Regularly review and adjust the budget as needed throughout the project
Use budgeting software or tools to help ...
The rate of RCC, reinforcement, or shuttering can be analyzed through various factors.
Factors affecting the rate of RCC include the type of concrete mix, the size and shape of the structure, and the location of the project.
Reinforcement rates depend on the type and size of the reinforcement used, as well as the complexity of the design.
Shuttering rates are influenced by the type of material used, the size and shape of ...
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
based on 3 interviews
Interview experience
based on 36 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
705
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
503
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
391
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineering Manager
322
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA