Filter interviews by
I applied via Walk-in
Personal Behaviour and sound knowledge of your work.
Risk assessment at work involves identifying hazards, evaluating the likelihood and severity of harm, and implementing controls to reduce risk.
Identify hazards in the workplace
Evaluate the likelihood and severity of harm
Implement controls to reduce risk
Review and update risk assessments regularly
Involve employees in the risk assessment process
Document the risk assessment process and findings
Top trending discussions
posted on 11 Apr 2020
Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.
Set clear and measurable goals for the company
Monitor progress regularly and make adjustments as needed
Optimize processes to increase efficiency and reduce costs
Make data-driven decisions based on financial and operational data
Invest in employee training and development to improve perf...
I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.
Implement safety protocols to ensure compliance
Provide proper training to all personnel
Regularly inspect and maintain equipment
Enforce strict adherence to safety guidelines
Monitor and evaluate performance regularly
posted on 24 Jul 2023
I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
To make a budget for a project, identify all expenses and allocate funds accordingly.
Identify all expenses including labor, materials, equipment, and any other costs
Estimate the cost of each expense and allocate funds accordingly
Consider any potential risks or unexpected expenses and allocate contingency funds
Regularly review and adjust the budget as needed throughout the project
Use budgeting software or tools to help ...
The rate of RCC, reinforcement, or shuttering can be analyzed through various factors.
Factors affecting the rate of RCC include the type of concrete mix, the size and shape of the structure, and the location of the project.
Reinforcement rates depend on the type and size of the reinforcement used, as well as the complexity of the design.
Shuttering rates are influenced by the type of material used, the size and shape of ...
I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
Design optimization can be achieved through various methods such as simulation, iteration, and utilization of advanced tools.
Utilize simulation software to test different design scenarios and identify the most optimal solution
Iterate on the design by making incremental changes and evaluating the impact on performance
Use advanced tools like finite element analysis (FEA) or computational fluid dynamics (CFD) for detailed...
Expectations for monetary benefits should align with industry standards and reflect the level of responsibility and experience required for the Senior Manager role.
Monetary benefits should be competitive with market rates for Senior Manager positions.
Consider additional perks such as bonuses, stock options, or benefits packages.
Negotiate for salary increases based on performance and achievements.
Ensure transparency and...
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
based on 6 reviews
Rating in categories
Junior Engineer
174
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Civil Engineer
168
salaries
| ₹2.2 L/yr - ₹9 L/yr |
Senior Engineer
166
salaries
| ₹4.4 L/yr - ₹11.7 L/yr |
Civil Site Engineer
149
salaries
| ₹2 L/yr - ₹6.4 L/yr |
Engineer
112
salaries
| ₹2.5 L/yr - ₹9 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Kalpataru Projects International