J.kumar metro project is a major infrastructure project involving construction of metro rail system.
J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.
The project involves various stages such as planning, design, construction, and implementation.
It may include tasks like excavation, tunneling, track laying, station construction, etc.
The project requires coordination wi...
Top trending discussions
posted on 30 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
posted on 18 Nov 2020
AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.
AIDL is used to define the interface between client and service in Android.
It allows communication between different processes in Android.
AIDL is used to pass complex data types between processes.
AIDL is similar to Remote Procedure Call (RPC) in other programming languages.
Example: AIDL is used in Android to implement...
Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.
Hash set stores unique values without any specific order.
Hash map stores key-value pairs and allows fast retrieval of values based on keys.
Both use hashing to map keys to their corresponding values.
In Java, HashSet and HashMap are implementations of these data structures.
I applied via Company Website and was interviewed in Aug 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
If casing gets trapped after concreting, I would follow these steps to resolve the issue.
Assess the situation and determine the cause of the casing getting trapped
If the casing is stuck due to concrete hardening, try to break the concrete around it using appropriate tools
If breaking the concrete is not feasible, consider using a hydraulic jack to push the casing out
Consult with experienced professionals or engineers fo...
posted on 25 Jun 2021
I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
based on 6 interviews
Interview experience
based on 44 reviews
Rating in categories
Junior Engineer
177
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Civil Engineer
168
salaries
| ₹2.2 L/yr - ₹9 L/yr |
Senior Engineer
166
salaries
| ₹4.4 L/yr - ₹11.7 L/yr |
Civil Site Engineer
149
salaries
| ₹2 L/yr - ₹6.4 L/yr |
Engineer
112
salaries
| ₹2.5 L/yr - ₹9 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Kalpataru Projects International