Superelevation is the banking of a road or railway track on a curve to counteract the centrifugal force.
It is the inward slope of a road or railway track on a curve.
It helps to counteract the centrifugal force that tends to pull a vehicle or train off the track.
The amount of superelevation required depends on the speed of the vehicle or train and the radius of the curve.
Superelevation is usually expressed as a percenta...
A radius curve is a section of a road or railway track that curves gradually in a circular shape.
Radius curves are used to allow vehicles or trains to change direction smoothly.
The radius of a curve is determined by the degree of the curve and the speed limit of the road or track.
Radius curves can be found on highways, railways, and even roller coasters.
A larger radius curve allows for higher speeds, while a smaller ra...
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Jun 2023. There was 1 interview round.
posted on 30 Nov 2023
I was interviewed before Nov 2022.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
Total station errors can affect GPS to GPS measurements due to various factors.
Total station errors can include instrument calibration errors, atmospheric conditions, and human error.
Examples of total station errors affecting GPS to GPS measurements include incorrect leveling of the total station, improper target placement, and misalignment of the instrument.
Regular calibration and maintenance of the total station can
I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
based on 8 reviews
Rating in categories
Junior Engineer
181
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
157
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
152
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
138
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
114
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Hindustan Construction Company
Simplex Infrastructures
IRB Infrastructure