Survey Engineer
20+ Survey Engineer Interview Questions and Answers
Popular Companies
Q1. What's is traversing, and describe it how to it calculate data.....
Traversing is a surveying technique used to measure distances and angles between points on the ground.
Traversing involves moving from one point to another and measuring the distance and angle between them.
Data is calculated using trigonometry and the principles of geometry.
Traversing can be done using various instruments such as theodolites, total stations, and GPS receivers.
The accuracy of traversing depends on the precision of the instruments used and the skill of the surve...read more
Q2. What if we have only one TBM to connect instrument
Utilize the TBM efficiently by strategically connecting instruments
Prioritize critical instruments for connection first
Consider using multiplexers to connect multiple instruments to one TBM
Implement a communication protocol to ensure smooth data transfer
Ensure proper calibration and testing of connected instruments
Have a backup plan in case of TBM failure
Survey Engineer Interview Questions and Answers for Freshers
Q3. What is main reason failure The construction
Poor planning and lack of communication are the main reasons for construction failure.
Poor planning and design
Lack of communication between stakeholders
Inadequate supervision and inspection
Use of substandard materials and equipment
Unforeseen environmental factors
Inaccurate surveying and measurements
Human error and negligence
Q4. How to Check error in Total station
To check errors in a Total Station, perform a calibration check and ensure proper leveling and alignment.
Perform a calibration check by measuring a known distance and comparing it to the Total Station's measurement.
Ensure the Total Station is properly leveled and aligned before taking measurements.
Check for any physical damage or obstructions that may affect the accuracy of the Total Station.
Verify that the instrument is set to the correct units and coordinate system for the ...read more
Q5. Find second largest number in Java, Second last number,
To find the second largest number in Java, sort the array and return the second last element.
Sort the array in descending order using Arrays.sort() method
Return the second element from the sorted array
If the array has less than two elements, return -1
Q6. How to import data in AutoCad
Data can be imported in AutoCad using the 'Data Extraction' tool.
Open the drawing in AutoCad
Go to the 'Insert' tab and click on 'Data Extraction'
Select the objects from which you want to extract data
Choose the properties you want to extract
Save the extracted data as a .csv file
Share interview questions and help millions of jobseekers 🌟
Q7. Tunnel monitoring system and how it's working
Tunnel monitoring systems use sensors to detect changes in the tunnel environment and alert engineers to potential issues.
Sensors are placed throughout the tunnel to monitor factors such as temperature, humidity, and air quality.
Data from the sensors is collected and analyzed in real-time to detect any abnormalities or potential hazards.
Alerts are sent to engineers if any issues are detected, allowing them to take action before a problem becomes more serious.
Examples of tunne...read more
Q8. How to do Tranverse Survey
Transverse survey involves measuring distances and angles to determine the position of points on the ground.
Set up the theodolite at a known point and measure a back sight to a benchmark.
Take foresight readings to the points to be surveyed, recording both the horizontal and vertical angles.
Measure the distances using a tape or EDM.
Calculate the coordinates of the points using trigonometry and the measured angles and distances.
Check the accuracy of the survey by closing the tr...read more
Survey Engineer Jobs
Q9. What are the coordinates
Coordinates are sets of numbers used to determine the position of a point in a space or on a map.
Coordinates consist of latitude and longitude values
Latitude measures how far north or south a point is from the equator
Longitude measures how far east or west a point is from the Prime Meridian
Coordinates are commonly used in GPS systems to pinpoint locations
Q10. How to Close tavers eror calculation? =2n-4
To close travers error calculation, use the formula 2n-4.
To close travers error calculation, substitute the value of n into the formula 2n-4.
For example, if n=3, the calculation would be 2(3)-4 = 6-4 = 2.
Q11. What is the tollerence of subgrade top?
The tolerance of subgrade top refers to the acceptable deviation from the specified elevation of the subgrade surface.
Tolerance of subgrade top is typically specified in project plans or specifications.
It is important to measure and ensure that the subgrade top meets the specified tolerance to ensure proper construction of the pavement layers.
For example, a typical tolerance for subgrade top may be +/- 0.1 feet from the specified elevation.
Q12. How to do Level work
Level work involves using a level instrument to determine the elevation of points on the ground.
Set up the level instrument at a known benchmark point
Take readings at various points to determine their elevations
Use the leveling rod to measure the height difference between the instrument and the ground
Calculate the elevation of each point based on the readings
Ensure the instrument is properly calibrated for accurate results
Q13. Tell me about transition curve?
Transition curve is a curve that connects a straight line with a circular curve in a smooth and gradual manner.
Transition curve is used in civil engineering and transportation engineering to ensure smooth transition between different types of curves.
It helps in reducing discomfort for passengers and minimizing wear and tear on vehicles.
Examples of transition curves include clothoid, cubic parabola, and spiral curves.
Q14. Name some softwares related to GIS surveying
Some software related to GIS surveying include ArcGIS, QGIS, and AutoCAD Civil 3D.
ArcGIS: A powerful GIS software used for mapping, spatial analysis, and data management.
QGIS: An open-source GIS software that offers similar functionalities to ArcGIS.
AutoCAD Civil 3D: A software specifically designed for civil engineering and surveying tasks, including GIS integration.
Q15. How many leescount in auto level
There are no 'leescount' in an auto level. It seems like a typo or misunderstanding of terminology.
There is no concept of 'leescount' in auto level surveying equipment.
It is possible that the interviewer meant to ask about something else related to auto levels.
It is important to clarify any confusion or misunderstanding with the interviewer.
Q16. Difference between camber and gradient?
Camber is the curvature of the road surface while gradient is the slope of the road surface.
Camber refers to the curvature of the road surface, typically used to aid in water drainage.
Gradient refers to the slope of the road surface, indicating the rate of incline or decline.
Camber is measured in percentage or ratio, while gradient is measured in degrees or percentage.
Example: A road with a positive camber will slope slightly towards the center, while a road with a positive g...read more
Q17. Traversing survey work
Traversing survey work involves measuring angles and distances between points to determine the location of new points.
Traversing is used to establish control points for construction projects.
It involves measuring angles and distances between points using a theodolite and tape measure.
The measurements are used to calculate the coordinates of new points.
Traversing can be done using either an open or closed traverse.
An open traverse starts and ends at different points, while a c...read more
Q18. What is the section line
A section line is a line on a map or drawing that represents a cut through a structure or land to show details of the interior.
Section lines are used in engineering and architecture to provide detailed views of structures.
They are typically drawn as dashed lines with arrows indicating the direction of the cut.
Section lines help to visualize the internal features of a structure or land.
Examples include cross-sectional views of buildings, roads, and geological formations.
Q19. Traversing And its implementation
Traversing is a surveying technique used to determine the relative positions of points on the earth's surface.
Traversing involves measuring angles and distances between survey points.
It is used to create a network of connected points for mapping or construction purposes.
Traversing can be done using various methods such as compass and tape, theodolite, or GPS.
Errors in traversing can be minimized by using proper techniques and equipment.
Example: Traversing a boundary line to c...read more
Q20. How to your expected slary
I am looking for a competitive salary based on my experience and qualifications.
Research industry standards for Survey Engineers salaries
Consider your level of experience and qualifications
Negotiate based on the responsibilities and expectations of the role
Q21. Size of bricks
The size of bricks varies depending on the region and purpose.
Bricks can have different dimensions such as length, width, and height.
Common brick sizes include 230 mm x 110 mm x 76 mm and 200 mm x 100 mm x 50 mm.
Special bricks like fire bricks or refractory bricks may have different sizes.
Brick sizes can also vary based on the country or region's building standards.
Q22. Wright of steel
Wright of steel refers to the strength and durability of steel structures.
It is a term used to describe the ability of steel to withstand stress and pressure.
Steel structures with high Wright can resist natural disasters like earthquakes and hurricanes.
The Wright of steel is determined by its composition and manufacturing process.
Steel with high Wright is commonly used in construction of bridges, skyscrapers, and other large structures.
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month