Upload Button Icon Add office photos

PNC Infratech

Compare button icon Compare button icon Compare

Filter interviews by

PNC Infratech Interview Questions, Process, and Tips

Updated 26 Feb 2025

Top PNC Infratech Interview Questions and Answers

View all 38 questions

PNC Infratech Interview Experiences

Popular Designations

60 interviews found

Interview Questionnaire 

10 Questions

  • Q1. 1. What you understand the requirement of shuttering material at project site?
  • Ans. 

    Shuttering material refers to temporary structures used in construction projects to support concrete during the curing process.

    • Shuttering material is required to provide formwork support for concrete structures.

    • It helps in creating the desired shape and structure of the concrete element.

    • Common types of shuttering materials include plywood, steel, aluminum, and plastic.

    • The choice of material depends on factors like proj...

  • Answered by AI
  • Q2. 2.Do you able to formulate claim raising and defending strategy basis on contractual provision ?
  • Ans. 

    Yes

    • Yes, I am able to formulate claim raising and defending strategies based on contractual provisions.

    • I have extensive experience in contract management and have successfully raised and defended claims in my previous roles.

    • I am well-versed in analyzing contractual provisions and identifying the relevant clauses for formulating effective strategies.

    • I have a strong understanding of contract law and can leverage it to dev...

  • Answered by AI
  • Q3. 3. What do you understand about preliminary drawing, as-built drawing, drawing schedule, proof checking ?
  • Ans. 

    Preliminary drawing, as-built drawing, drawing schedule, and proof checking are all important aspects of the design and construction process.

    • Preliminary drawing: Initial sketches or plans that outline the basic design concept.

    • As-built drawing: Final drawings that reflect any changes made during construction.

    • Drawing schedule: A timeline or list that outlines when each drawing is expected to be completed.

    • Proof checking: ...

  • Answered by AI
  • Q4. 4. How of sources and requirement (quantity) of materials in projects as per tender ?
  • Ans. 

    The sources and quantity of materials in projects are determined based on the tender requirements.

    • The sources of materials in projects are determined through a procurement process.

    • The quantity of materials required is specified in the tender documents.

    • The tender documents may include a bill of quantities or a detailed scope of work.

    • The procurement team evaluates potential suppliers and selects the most suitable ones.

    • Th...

  • Answered by AI
  • Q5. 5.Explore your knowledge of automated systems, software and IT applications such as MS Project, Prima Vera, SAP, AutoCAD, Auto Plotter, Road Estimator & CalCquen.
  • Q6. 6. Rate Analysis of Earth Work for Road Project.
  • Ans. 

    Rate analysis of earthwork for road project involves calculating the cost of excavation, transportation, and compaction of soil.

    • Rate analysis helps in estimating the cost of earthwork for road construction.

    • It involves determining the quantity of earthwork required and the rates for excavation, transportation, and compaction.

    • The rates are based on factors like the type of soil, distance of transportation, and equipment ...

  • Answered by AI
  • Q7. 7. What is S-Curve ? Explain with example.
  • Ans. 

    The S-Curve is a graphical representation of the growth or progress of a project or business over time.

    • The S-Curve is named after its shape, which resembles the letter 'S'.

    • It is commonly used in project management to track and visualize the progress of tasks or activities.

    • The curve typically shows slow progress at the beginning, followed by a rapid growth phase, and then a tapering off towards the end.

    • The S-Curve helps...

  • Answered by AI
  • Q8. 8. Haw can you prepare R0 Budget for a Road Project ? Describe sequence in brief.
  • Ans. 

    Preparing a R0 budget for a road project involves several steps and considerations.

    • Identify the scope and objectives of the road project

    • Estimate the quantities of materials and resources required

    • Determine the unit costs of materials, labor, and equipment

    • Calculate the total cost for each item and activity

    • Consider any contingencies or unforeseen expenses

    • Sum up the costs to create the overall budget

    • Review and refine the b

  • Answered by AI
  • Q9. 9. What is Change of Scope in Road Project ? Describe sequence in brief.
  • Ans. 

    Change of Scope in a road project refers to any modifications or alterations made to the original project plan.

    • Change of scope can include changes in project objectives, deliverables, timelines, or budget.

    • It may involve adding or removing features, adjusting the project scope, or redefining project requirements.

    • For example, if a road project initially planned to construct a two-lane road but later decides to expand it ...

  • Answered by AI
  • Q10. 10. What is Price Adjustment ? What is its role in Project Cost ? How to calculate it ?
  • Ans. 

    Price adjustment is a mechanism to account for changes in project costs. It helps in maintaining project profitability.

    • Price adjustment is a provision in a contract that allows for changes in project costs due to various factors such as inflation, currency fluctuations, or changes in material prices.

    • Its role in project cost is to ensure that the project remains financially viable and profitable despite cost fluctuation...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be cool and clam during Interview. Do not hesitate. Most of the Answers of asked Questions has been already very conversant with you and it is related to your routine/periodic work. Do not make any specific strategy. If any Questions are beyond your knowledge, please say clearly sorry.

Top PNC Infratech Senior Manager Interview Questions and Answers

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Plan and profile drawing explain
  • Ans. 

    Plan and profile drawings are used in highway engineering to show the horizontal and vertical alignment of a road.

    • Plan drawing shows the horizontal alignment of the road, including curves, intersections, and other features.

    • Profile drawing shows the vertical alignment of the road, including grades, slopes, and elevations.

    • Both drawings are used together to provide a comprehensive view of the road design.

    • Plan and profile ...

  • Answered by AI
  • Q2. Difference between rigid pavement and flexible pavement
  • Ans. 

    Rigid pavement is made of concrete while flexible pavement is made of asphalt.

    • Rigid pavement is made of concrete and has high flexural strength.

    • Flexible pavement is made of asphalt and has low flexural strength.

    • Rigid pavement is more durable and requires less maintenance compared to flexible pavement.

    • Flexible pavement is easier and cheaper to repair and maintain.

    • Examples of rigid pavement include concrete highways and ...

  • Answered by AI

Highway Engineer Interview Questions asked at other Companies

Q1. What is the density of soil in embankment layer.
View answer (7)
PNC Infratech Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Previous experience
  • Q2. Which work completed in your supervision

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your work knowledge

Site Supervisor Interview Questions asked at other Companies

Q1. What are handover process to civil or facillities
View answer (4)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Group Discussion 

How can one effectively handle various situations during operations without feeling blank or stressed? Maintain patience and approach your tasks with complete confidence. If you find yourself stuck, discuss the matters with your senior or supervisor.

Interview Preparation Tips

Interview preparation tips for other job seekers - Appear for interview with your full confidence and don't be afraid of the questions
Give frank answers without beating around the bush.
Be straight forward to the interviewer

Senior Operations Manager Interview Questions asked at other Companies

Q1. How do you align operational strategies with the company's overall goals?
View answer (1)

PNC Infratech interview questions for popular designations

 Highway Engineer

 (4)

 Junior Engineer Civil

 (4)

 Assistant Engineer

 (3)

 Civil Engineer

 (3)

 Lab Technician

 (2)

 Assistant Store Keeper

 (2)

 Billing Engineer

 (2)

 Mechanical Engineer

 (2)

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the valve size
  • Ans. 

    The valve size refers to the diameter of the valve opening, typically measured in inches or millimeters.

    • Valve size is important for determining flow rate and pressure drop in a system.

    • Common valve sizes include 1/2", 3/4", 1", etc.

    • Valve size may vary depending on the application and required flow rate.

  • Answered by AI
  • Q2. How can i measure di pipe
  • Ans. 

    DI pipe can be measured using a measuring tape or a caliper.

    • Measure the diameter of the DI pipe using a measuring tape or caliper.

    • Ensure the measurement is taken at the widest point of the pipe.

    • Record the measurement accurately for reference and future use.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Current CTC before this company
  • Ans. 

    My current CTC before this company is $80,000 per year.

    • My current CTC is $80,000 per year

    • I have been earning this amount for the past two years

    • I received a 10% raise in my previous job, bringing my CTC to $80,000

  • Answered by AI
  • Q2. Expected ctc in this company
  • Ans. 

    Expected CTC in this company depends on various factors such as experience, qualifications, and negotiation skills.

    • Expected CTC can vary based on the level of experience - entry level, mid-level, senior level.

    • Qualifications and certifications can also impact the expected CTC.

    • Negotiation skills play a crucial role in determining the final CTC offer.

    • Researching industry standards and company policies can give an idea of

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Short interview

Civil Execution Engineer Interview Questions asked at other Companies

Q1. How to check consumption of gypsum, Grade of SS, Deshuttering of Cantilever structure, lapping of different dia of steel, etc
View answer (1)

Get interview-ready with Top PNC Infratech Interview Questions

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Regarding SAP t code and store system

Round 2 - Technical 

(2 Questions)

  • Q1. Store system sap
  • Q2. SAP activity and movement
Round 3 - HR 

(1 Question)

  • Q1. Salary discuss for how many
Round 4 - Group Discussion 

Store working system

Interview Preparation Tips

Interview preparation tips for other job seekers - No Sunday off. Working culture is not good

Jobs at PNC Infratech

View all
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Highway & Wey explain in layer chart
  • Q2. What is road project kraw &shlop

Interview Preparation Tips

Interview preparation tips for other job seekers - involve in service sector for example highway & expressway project

Civil Foreman Interview Questions asked at other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, and quantity .
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Site engineer 

(2 Questions)

  • Q1. Water Project work jjm
  • Q2. Water supply Project
Round 2 - Engineer site 

(2 Questions)

  • Q1. Site engineer at pipeline pump house
  • Q2. Pnc infra ltd up
Round 3 - Site engineer 

(2 Questions)

  • Q1. Pratibha interface ltd
  • Q2. Di pipe and hdpe pipe fhtc

Interview Preparation Tips

Interview preparation tips for other job seekers - Water Project work in up
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Introduced ur self
  • Q2. Covers of structure different type of element

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)

Store Keeper Interview Questions & Answers

user image Anonymous

posted on 4 Sep 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Assignment 

All about to known facts towards store

Round 2 - Group Discussion 

Talking about ay last job and about my department

Store Keeper Interview Questions asked at other Companies

Q1. What is the process of material receiving??
View answer (4)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 7 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Any questions in Lab engineering
  • Q2. Bitumen, Aggregate, penetretion test viscosity tests
Round 3 - Aptitude Test 

Compressive strength of cube

Round 4 - Coding Test 

All test all tests quality control

Round 5 - Case Study 

Bitumen, Aggregate test, cement test,????

Round 6 - Coding Test 

Coding test all questions

Round 7 - Coding Test 

All tests quality control in Lab engineering

Interview Preparation Tips

Topics to prepare for PNC Infratech Junior Engineer Civil interview:
  • Bitumen
  • Aggregate test
  • RMC ,wmm HM PLANT calibration
  • Cement test all tests
Interview preparation tips for other job seekers - Concrete in internet

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)
Contribute & help others!
anonymous
You can choose to be anonymous

PNC Infratech Interview FAQs

How many rounds are there in PNC Infratech interview?
PNC Infratech interview process usually has 2-3 rounds. The most common rounds in the PNC Infratech interview process are Technical, Resume Shortlist and HR.
How to prepare for PNC Infratech interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at PNC Infratech. The most common topics and skills that interviewers at PNC Infratech expect are SAP, Civil Engineering, Accounting, Construction and Project Management.
What are the top questions asked in PNC Infratech interview?

Some of the top questions asked at the PNC Infratech interview -

  1. 1. What you understand the requirement of shuttering material at project sit...read more
  2. 2.Do you able to formulate claim raising and defending strategy basis on contra...read more
  3. 3. What do you understand about preliminary drawing, as-built drawing, drawing ...read more
How long is the PNC Infratech interview process?

The duration of PNC Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

LIST OF COMPANIES

Netcon Technologies

Locations

SALARIES

H.G. Infra Engineering

No Salaries

SALARIES

H.G. Infra Engineering

No Salaries

SALARIES

H.G. Infra Engineering

SALARIES

IVTL Infoview Technologies

No Salaries

SALARIES

H.G. Infra Engineering

SALARIES

H.G. Infra Engineering

INTERVIEWS

India Nippon Electricals

No Interviews

SALARIES

India Nippon Electricals

Tell us how to improve this page.

PNC Infratech Interview Process

based on 69 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

GMR Group Interview Questions
4.0
 • 80 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 65 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all

PNC Infratech Reviews and Ratings

based on 934 reviews

3.8/5

Rating in categories

3.5

Skill development

3.6

Work-life balance

3.4

Salary

3.8

Job security

3.5

Company culture

3.1

Promotions

3.6

Work satisfaction

Explore 934 Reviews and Ratings
AGM /DGM -Store

Agra

20-25 Yrs

Not Disclosed

AGM/Sr. Manager/Manager - Legal

Agra

15-20 Yrs

₹ 15-20 LPA

Explore more jobs
Assistant Engineer
172 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
111 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
78 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accountant
50 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accounts Officer
49 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare PNC Infratech with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview