Upload Button Icon Add office photos

Filter interviews by

Kalpataru Projects International Senior Manager Interview Questions and Answers

Updated 24 Jul 2023

Kalpataru Projects International Senior Manager Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Details of past project responsibility
Round 3 - HR 

(1 Question)

  • Q1. Existing package and expectations

Interview Questionnaire 

2 Questions

  • Q1. How execution and profit shall be manged for company.
  • Ans. 

    Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.

    • Set clear and measurable goals for the company

    • Monitor progress regularly and make adjustments as needed

    • Optimize processes to increase efficiency and reduce costs

    • Make data-driven decisions based on financial and operational data

    • Invest in employee training and development to improve perf...

  • Answered by AI
  • Q2. How will you control man/machine at site.
  • Ans. 

    I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.

    • Implement safety protocols to ensure compliance

    • Provide proper training to all personnel

    • Regularly inspect and maintain equipment

    • Enforce strict adherence to safety guidelines

    • Monitor and evaluate performance regularly

  • Answered by AI

Senior Manager Interview Questions Asked at Other Companies

Q1. 1. What you understand the requirement of shuttering material at ... read more
asked in Tata Motors
Q2. Types of pumps and for which process which types of pumps are req ... read more
asked in Tata Motors
Q3. What can you do if Shortage of our parts for customer ??
asked in Flipkart
Q4. - what will you do to double revenue of your organisation
asked in Yes Bank
Q5. Which funds do you recommend for long term Investment in mutual f ... read more

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Quants , Logical and Verbal reasoning are the three sections we were tested on

Round 3 - Technical 

(2 Questions)

  • Q1. Questions were asked based on my resume and my favourite subjects
  • Q2. Interview took place for 20 mins

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Deputy Manager interview:
  • Project management
Interview preparation tips for other job seekers - Prepare aptitude well and be thorough with resume and favourite subjects

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What we do for shortage of material received?
  • Ans. 

    When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

    • Contact the supplier to inform them about the shortage and request immediate resolution

    • Check inventory records and cross-verify with the supplier's delivery documentation

    • Investigate the cause of the shortage, such as shipping errors or miscommunication

    • Implement measures to prevent future short...

  • Answered by AI
  • Q2. Can we do correction in invoice? if ans is yes then what are the further steps?
  • Ans. 

    Yes, corrections can be made in an invoice by following certain steps.

    • The correction should be made as soon as possible to avoid any confusion.

    • The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.

    • A new invoice should be created with the correct information and a reference to the original invoice.

    • The reason for the correction should be clearly stated on the new invoice.

    • Both the origin...

  • Answered by AI
  • Q3. Various SAP T code for Issues
  • Ans. 

    Various SAP T codes for Issues

    • MB21 - Create Reservation

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

    • MB1T - Transfer Posting

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive; interviewer may cross checks your confidence through various counter question, but what is right is right it can not be wrong, if interviewer says it wrong then don't go by interviewer words, always stick with your belief and knowledge.

Skills evaluated in this interview

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.

I appeared for an interview before May 2020.

Interview Questionnaire 

1 Question

  • Q1. How to fix rate of 1 cum metre rcc for m10 and m20
  • Ans. 

    To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

    • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

    • Calculate the labor cost involved in the construction process

    • Consider the cost of equipment required for the construction process

    • Include overheads like transportation, insurance, and taxes

    • Compare the ra...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - technicalviru.in
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Asked several questions about ASME code and clauses
  • Q2. Proven track record about handled equipment with critical condition
  • Ans. 

    I have a proven track record of effectively handling equipment in critical condition.

    • Successfully managed and maintained critical equipment in previous roles

    • Implemented preventive maintenance strategies to avoid critical failures

    • Trained team members on proper handling and troubleshooting of critical equipment

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend interview with through knowledge about your respective field
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Field related Questions
  • Q2. Experience regarding discussions
Round 2 - HR 

(2 Questions)

  • Q1. Salary Discussion, Job Location discussion.
  • Q2. Negotiation and joining discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Electrical instruments interface
  • Ans. 

    Electrical instruments interface involves connecting, configuring, and troubleshooting various electrical devices for optimal performance.

    • Understanding the specifications and requirements of each electrical instrument

    • Properly connecting the instruments to power sources and other devices

    • Configuring settings and parameters to ensure accurate readings and functionality

    • Troubleshooting issues such as faulty connections or m...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Normal question related to your branch
  • Q2. About mass transfer,Heat transfer
Round 3 - Interview 

(1 Question)

  • Q1. About my goals and projects

Interview Preparation Tips

Topics to prepare for Saint-Gobain Deputy Manager interview:
  • Mass Transfer
  • Heat Exchangers
  • Fluid Mechanics

Kalpataru Projects International Interview FAQs

How many rounds are there in Kalpataru Projects International Senior Manager interview?
Kalpataru Projects International interview process usually has 3 rounds. The most common rounds in the Kalpataru Projects International interview process are Resume Shortlist, Technical and HR.
How to prepare for Kalpataru Projects International Senior Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kalpataru Projects International. The most common topics and skills that interviewers at Kalpataru Projects International expect are 400Kv, Cable Sizing, Electrical Design and Substation.
What are the top questions asked in Kalpataru Projects International Senior Manager interview?

Some of the top questions asked at the Kalpataru Projects International Senior Manager interview -

  1. How execution and profit shall be manged for compa...read more
  2. How will you control man/machine at sit...read more
  3. Existing package and expectati...read more

Tell us how to improve this page.

Kalpataru Projects International Senior Manager Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more
Kalpataru Projects International Senior Manager Salary
based on 260 salaries
₹10 L/yr - ₹35 L/yr
9% less than the average Senior Manager Salary in India
View more details

Kalpataru Projects International Senior Manager Reviews and Ratings

based on 54 reviews

3.9/5

Rating in categories

3.8

Skill development

3.6

Work-life balance

3.7

Salary

3.8

Job security

3.6

Company culture

3.4

Promotions

3.5

Work satisfaction

Explore 54 Reviews and Ratings
Deputy Manager
616 salaries
unlock blur

₹5.4 L/yr - ₹21 L/yr

Assistant Manager
606 salaries
unlock blur

₹3.7 L/yr - ₹14 L/yr

Senior Engineer
509 salaries
unlock blur

₹3.4 L/yr - ₹11.2 L/yr

Engineer
288 salaries
unlock blur

₹2.7 L/yr - ₹8.5 L/yr

Manager
261 salaries
unlock blur

₹7.9 L/yr - ₹26 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview