I applied via Company Website and was interviewed before Apr 2022. There were 2 interview rounds.
CA stands for Contract Administration. There are typically 3 schedules in a construction contract.
CA involves managing and enforcing the terms of a construction contract.
The 3 schedules in a construction contract are typically: Schedule of Values, Payment Schedule, and Change Order Schedule.
The Schedule of Values outlines the budget for the project, the Payment Schedule outlines when payments will be made, and the Chan...
EPC Contract stands for Engineering, Procurement, and Construction Contract.
EPC Contract is a type of construction contract where the contractor is responsible for the entire project from design to construction.
The contractor is responsible for the engineering, procurement, and construction of the project.
EPC Contracts are commonly used in large-scale infrastructure projects such as power plants, oil refineries, and hi...
FDD stands for Field Density Test. Loose soil density ranges from 1.2 to 1.4 g/cm³ and compacted soil density ranges from 1.4 to 1.6 g/cm³.
FDD is a test used to determine the density of soil in the field.
Loose soil density ranges from 1.2 to 1.4 g/cm³.
Compacted soil density ranges from 1.4 to 1.6 g/cm³.
The density of soil affects its strength and load-bearing capacity.
The density of soil can be increased through compac
OGL Sampling stands for OpenGL Sampling. It is a technique used to improve the quality of graphics rendering in computer graphics.
OGL Sampling is used to reduce aliasing and improve the quality of graphics.
It involves taking multiple samples of a pixel and averaging the color values to produce a smoother image.
The number of samples taken per pixel can be adjusted to balance quality and performance.
OGL Sampling is commo...
The IS code for BBS & Measurements is IS 13920:2016.
IS 13920:2016 is the Indian Standard code for detailing of reinforcement in concrete structures.
It provides guidelines for the preparation of bar bending schedules (BBS) and measurement of reinforcement.
The code specifies the requirements for the dimensions, shape, and position of reinforcement in various structural elements.
It also covers the calculation of cutting l...
I was interviewed in Feb 2025.
I was interviewed before Mar 2024.
MKC Infrastructure Ltd. interview questions for popular designations
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
Get interview-ready with Top MKC Infrastructure Ltd. Interview Questions
I am currently employed as a Senior Operations Manager at a leading logistics company, overseeing supply chain efficiency.
Leading a team of 50+ employees to optimize delivery routes, resulting in a 20% reduction in transportation costs.
Implementing new software solutions that improved inventory tracking accuracy by 30%.
Collaborating with cross-functional teams to enhance customer satisfaction scores by 15% over the pas
I left my previous company to pursue new challenges and opportunities for growth in my career.
I sought a role that aligned more closely with my long-term career goals.
The company culture shifted, and I felt it was time for a change.
I wanted to explore new industries and broaden my skill set.
I was presented with an opportunity that offered greater responsibility and leadership potential.
I applied via Campus Placement
Gerneral Aptitude Questions
Super elevation is the banking of a road or railway track around a curve to counteract the effects of centrifugal force.
Super elevation is the tilt or incline provided to the outer edge of a road or railway track on a curve.
It helps in counteracting the effects of centrifugal force, allowing vehicles or trains to travel at higher speeds safely.
The amount of super elevation required depends on factors like design speed,...
I applied via Company Website
The rolling margin method is a technique used in engineering to calculate the margin of safety in structural design.
The rolling margin method involves calculating the margin of safety by considering the load and resistance factors.
It is commonly used in the design of reinforced concrete structures.
The margin of safety is calculated by dividing the available strength by the required strength.
The unit weight of steel bar...
I applied via Approached by Company and was interviewed in Jan 2024. There was 1 interview round.
Gernal electronic and chromatography word question
The duration of MKC Infrastructure Ltd. interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 44 interviews
Interview experience
based on 331 reviews
Rating in categories
Junior Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Reliance Infrastructure
GMR Group