Active earth pressure is the lateral pressure exerted by soil on a retaining structure when the soil is in a state of movement.
Active earth pressure is also known as dynamic earth pressure.
It is the pressure exerted by soil on a retaining structure when the soil is in a state of movement.
It is calculated using Rankine's theory or Coulomb's theory.
The magnitude of active earth pressure depends on the angle of internal f...
Designing a box culvert involves several steps including site investigation, hydraulic analysis, structural design, and construction planning.
Conduct a site investigation to determine the soil conditions and water table level
Perform hydraulic analysis to determine the flow rate and water level
Select appropriate materials and dimensions for the culvert based on hydraulic and structural requirements
Design the structural ...
I applied via Naukri.com and was interviewed before Nov 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Nov 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.
Question on your previous experience
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
I have experience in designing and analyzing transmission lines for power distribution.
Designed and analyzed transmission lines for power distribution projects
Performed load flow analysis and short circuit analysis for transmission lines
Experience in using software tools like PLS-CADD and PLS-POLE
Knowledge of industry standards and regulations for transmission line design
Collaborated with cross-functional teams to ensu
Design of foundation is crucial for the stability and safety of any structure.
The type of foundation depends on the soil type and load-bearing capacity.
Factors like building height, weight, and seismic activity must be considered.
Proper drainage and waterproofing must be incorporated.
Foundation design must comply with local building codes and regulations.
Examples of foundation types include shallow, deep, and pile foun
posted on 1 Dec 2021
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Micro planning of construction site involves detailed planning and scheduling of activities to ensure efficient and timely completion of the project.
It involves breaking down the project into smaller tasks and assigning timelines for each task.
It includes identifying the resources required for each task and ensuring their availability.
Micro planning also involves monitoring the progress of each task and making necessar...
The unit weight of 12mm bar depends on the type of steel used.
The unit weight of 12mm bar made of mild steel is 0.89 kg/m
For high tensile steel, the unit weight of 12mm bar is 1.06 kg/m
The density of steel used in the bar also affects the unit weight
I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.
The capacity of Tata Steel's lime plant is yet to be determined.
The capacity of the lime plant is currently unknown and is still to be decided by Tata Steel.
Tata Steel is likely in the process of determining the optimal capacity for their lime plant.
The capacity of the lime plant will depend on various factors such as production requirements, market demand, and technological capabilities.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Junior Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Reliance Infrastructure
GMR Group