Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by MKC Infrastructure Ltd. Team. If you also belong to the team, you can get access from here

MKC Infrastructure Ltd. Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

MKC Infrastructure Ltd. Process Developer Interview Questions and Answers

Updated 21 Oct 2024

MKC Infrastructure Ltd. Process Developer Interview Experiences

1 interview found

Process Developer Interview Questions & Answers

user image Ruksar Rukku

posted on 21 Oct 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Mkn hyugt tgtfedecjnygrf resecfgh
  • Q2. Jjkiu7tgtftr ffgbhhu jnhtdeswswaswqa

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Why do you think you are fit for the job

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest, candid in your replies

Executive Interview Questions & Answers

GMR Group user image Deepti Yellanki

posted on 7 Jul 2017

I was interviewed before Jul 2016.

Interview Questionnaire 

2 Questions

  • Q1. Tell about yourself
  • Ans. 

    I am a results-driven executive with over 10 years of experience in leading teams and driving business growth.

    • Led cross-functional teams to successfully launch new products

    • Implemented cost-saving initiatives resulting in a 20% increase in profitability

    • Developed and executed strategic plans to expand market share

    • Strong track record of building and maintaining relationships with key stakeholders

  • Answered by AI
  • Q2. Psychometric

Interview Preparation Tips

Round: Test
Experience: It was a written test
Tips: For years engineering basics
Duration: 1 hour
Total Questions: 50

Round: Test
Experience: SIMPLE QUESTIONS
Tips: Follow RS Agarwaal book
Duration: 1 hour
Total Questions: 80

Round: HR Interview
Experience: General topics
Tips: Keep calm and try to answer. Nothing or of the box

Round: Behavioural Interview
Experience: How to do react under pressurised conditions
Tips: Take pause, think and then answer.

Skills: Technical Skills
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(5 Questions)

  • Q1. Are you currently employed, and are you prepared to transition to the offered position?
  • Q2. What is your preparedness for working from the office?
  • Q3. What is your current cost to company (CTC) and what are your expected CTC expectations?
  • Q4. What is your reason for seeking a job change?
  • Q5. When are you able to start working?

I applied via Job Portal and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Company introduction and job profile
  • Q2. Basic introduction about self education and experience
  • Q3. Details of job description
  • Q4. How to handle the procurment
  • Q5. How do develop new system
  • Ans. 

    Developing a new system involves identifying requirements, designing, testing, and implementing the system.

    • Identify the requirements of the system

    • Design the system architecture and components

    • Test the system thoroughly to ensure it meets the requirements

    • Implement the system and monitor its performance

    • Continuously improve the system based on feedback and changing requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - please prepare your self to go any where in interview

Skills evaluated in this interview

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

MKC Infrastructure Ltd. Interview FAQs

How many rounds are there in MKC Infrastructure Ltd. Process Developer interview?
MKC Infrastructure Ltd. interview process usually has 1 rounds. The most common rounds in the MKC Infrastructure Ltd. interview process are Technical.
What are the top questions asked in MKC Infrastructure Ltd. Process Developer interview?

Some of the top questions asked at the MKC Infrastructure Ltd. Process Developer interview -

  1. mkn hyugt tgtfedecjnygrf resec...read more
  2. jjkiu7tgtftr ffgbhhu jnhtdeswswas...read more

Tell us how to improve this page.

MKC Infrastructure Ltd. Process Developer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 740 Interviews
Tata Projects Interview Questions
4.2
 • 424 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
Junior Engineer
30 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Accountant
30 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Highway Engineer
30 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
27 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
25 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare MKC Infrastructure Ltd. with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview