i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Job Portal and was interviewed before Jun 2021. There was 1 interview round.
Developing a new system involves identifying requirements, designing, testing, and implementing the system.
Identify the requirements of the system
Design the system architecture and components
Test the system thoroughly to ensure it meets the requirements
Implement the system and monitor its performance
Continuously improve the system based on feedback and changing requirements
I applied via Campus Placement and was interviewed before Sep 2020. There were 4 interview rounds.
What people are saying about Larsen & Toubro Limited
I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
Lapping of beam is done by grinding the surface of the beam to achieve a smooth and flat finish.
The beam is placed on a lapping machine with an abrasive surface.
The machine moves the beam back and forth while the abrasive surface grinds away any imperfections.
The process is repeated with finer and finer abrasives until the desired finish is achieved.
Lapping can improve the strength and durability of the beam.
It is comm...
The number of cube samples taken for 60 cum of concrete depends on the specifications and requirements of the project.
The number of cube samples may vary depending on the project specifications and requirements.
Typically, 3 to 5 cube samples are taken for every 100 cubic meters of concrete.
The cube samples are taken to test the compressive strength of the concrete.
The number of cube samples may also depend on the locat...
posted on 8 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
posted on 16 Aug 2020
I applied via Walk-in and was interviewed before Aug 2019. There were 3 interview rounds.
Daily maintenance schedules of machineries
Check oil levels and top up if necessary
Inspect and clean filters
Check for any signs of wear and tear
Lubricate moving parts
Check for any leaks or unusual noises
Perform any necessary repairs or replacements
Keep a record of maintenance performed
Construction machinery uses various types of oils depending on their functions.
There are different types of oils used in construction machinery such as engine oil, hydraulic oil, gear oil, transmission oil, and brake oil.
Engine oil is used to lubricate the engine and prevent wear and tear.
Hydraulic oil is used to transfer power in hydraulic systems.
Gear oil is used to lubricate gears and bearings in gearboxes.
Transmiss...
To repair a hydraulic pump, first identify the problem and then disassemble the pump to replace or repair the faulty parts.
Identify the problem by checking for leaks, unusual noises, or loss of pressure.
Disassemble the pump carefully, taking note of the order of parts and any seals or gaskets.
Inspect the parts for damage or wear, and replace any faulty components.
Reassemble the pump, making sure all parts are properly ...
Engine failure can be caused by various factors such as overheating, lack of maintenance, wear and tear, and manufacturing defects.
Overheating due to lack of coolant or oil
Lack of maintenance such as not changing oil or air filters
Wear and tear of engine components such as pistons, bearings, and valves
Manufacturing defects such as faulty parts or poor assembly
Fuel contamination or incorrect fuel usage
Improper installat...
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
The procedure for pilecap excavation involves several steps to ensure proper excavation and preparation for the construction of pilecaps.
Clear the site and mark the boundaries of the pilecap area.
Excavate the soil within the marked boundaries to the required depth and dimensions.
Ensure proper shoring and support systems are in place to prevent collapse.
Remove any obstructions or debris from the excavation area.
Inspect ...
Some of the top questions asked at the Larsen & Toubro Limited Executive interview -
based on 3 interviews
Interview experience
based on 42 reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹5.3 L/yr - ₹18.4 L/yr |
Senior Engineer
3.5k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.3 L/yr |
Manager
1.1k
salaries
| ₹9 L/yr - ₹29 L/yr |
Assistant Construction Manager
1k
salaries
| ₹6 L/yr - ₹21.5 L/yr |
Tata Projects
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International