Upload Button Icon Add office photos

Filter interviews by

Dilip Buildcon Engineer Interview Questions and Answers

Updated 22 Jan 2024

Dilip Buildcon Engineer Interview Experiences

1 interview found

Engineer Interview Questions & Answers

user image Anonymous

posted on 22 Jan 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the procedure for pilecap excavation?
  • Ans. 

    The procedure for pilecap excavation involves several steps to ensure proper excavation and preparation for the construction of pilecaps.

    • Clear the site and mark the boundaries of the pilecap area.

    • Excavate the soil within the marked boundaries to the required depth and dimensions.

    • Ensure proper shoring and support systems are in place to prevent collapse.

    • Remove any obstructions or debris from the excavation area.

    • Inspect ...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is Grade of M20
  • Ans. 

    Grade of M20 refers to the mix ratio of concrete where M denotes mix and 20 represents the compressive strength in N/mm^2 after 28 days.

    • M20 concrete mix consists of 1 part cement, 1.5 parts sand, and 3 parts aggregate.

    • The compressive strength of M20 concrete after 28 days is 20 N/mm^2.

    • It is commonly used for residential construction like foundations, slabs, and beams.

  • Answered by AI
  • Q2. What is Grade of M25
  • Ans. 

    Grade of M25 refers to the mix design of concrete with a compressive strength of 25 MPa.

    • M25 grade concrete is a mix design with a compressive strength of 25 MPa after 28 days of curing.

    • It is commonly used in construction for residential buildings, bridges, and pavements.

    • The mix proportion for M25 grade concrete is usually 1:1:2 (cement:sand:aggregate).

  • Answered by AI
  • Q3. 4.75 to 10 size of sieve
  • Ans. 

    4.75 to 10 size of sieve refers to the range of particle sizes that can pass through the sieve.

    • 4.75 to 10 size of sieve indicates the range of particle sizes that can pass through the sieve mesh.

    • Particles smaller than 4.75 will pass through, while particles larger than 10 will be retained on the sieve.

    • This range is commonly used in particle size analysis in industries like construction and mining.

  • Answered by AI
  • Q4. What is sinking fund method
  • Ans. 

    Sinking fund method is a way for a company to set aside money over time to repay a debt or replace an asset.

    • Sinking fund method involves regular contributions to a fund specifically designated for repaying debt or replacing assets.

    • The purpose of the sinking fund is to ensure that enough money is available when the debt matures or the asset needs to be replaced.

    • By using the sinking fund method, a company can avoid havin...

  • Answered by AI
  • Q5. What is annuity
  • Ans. 

    An annuity is a financial product that provides a series of payments at regular intervals.

    • Annuities are typically used for retirement income or to provide a steady income stream.

    • There are different types of annuities such as fixed annuities, variable annuities, and indexed annuities.

    • Annuities can be purchased with a lump sum payment or through a series of payments over time.

    • The payments from an annuity can be guarantee...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Lime plant TBD capacity of Tata steel
  • Ans. 

    The capacity of Tata Steel's lime plant is yet to be determined.

    • The capacity of the lime plant is currently unknown and is still to be decided by Tata Steel.

    • Tata Steel is likely in the process of determining the optimal capacity for their lime plant.

    • The capacity of the lime plant will depend on various factors such as production requirements, market demand, and technological capabilities.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Concrete and site management
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Instrument branch

Interview Preparation Tips

Topics to prepare for Power Mech Projects Engineer interview:
  • instrument and control system
Interview preparation tips for other job seekers - india is best country.

Interview Questionnaire 

7 Questions

  • Q1. Will you comfortable with structure work .
  • Q2. Do you have knowledge of Finnish work .
  • Q3. Yes I have finishing work knowledge like floor tile , wall tile , stone cladding dry or wet both , flash celling work with gypsum , metal celling , wooden work .
  • Q4. Do you have engineering drawing understanding .
  • Ans. 

    Yes, I have a good understanding of engineering drawings.

    • I am familiar with different types of engineering drawings such as mechanical, electrical, and architectural drawings.

    • I can interpret and analyze engineering drawings to understand the design and specifications of a product or structure.

    • I am proficient in reading and interpreting symbols, dimensions, and annotations on engineering drawings.

    • I have experience using...

  • Answered by AI
  • Q5. Yes I have .
  • Q6. You can work in all weather conditions
  • Q7. Yes I can

Interview Questionnaire 

1 Question

  • Q1. Planning & Billing

I applied via LinkedIn and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical

Interview Preparation Tips

Interview preparation tips for other job seekers - Have technical knowledge. Learn the basic of your field.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Job Portal and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Our Responsibility
  • Q2. Experience & projects name
  • Q3. Regarding bar bending schedule
  • Q4. Regarding contractor billing
  • Q5. Cube & slump test
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Online 

(1 Question)

  • Q1. Any type of question
Round 3 - Technical 

(2 Questions)

  • Q1. Technically question
  • Q2. Blast Furnace Tuyer Platform questions

Dilip Buildcon Interview FAQs

How many rounds are there in Dilip Buildcon Engineer interview?
Dilip Buildcon interview process usually has 1 rounds. The most common rounds in the Dilip Buildcon interview process are Technical.
How to prepare for Dilip Buildcon Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dilip Buildcon. The most common topics and skills that interviewers at Dilip Buildcon expect are Highways.

Tell us how to improve this page.

Fast track your campus placements

View all
Dilip Buildcon Engineer Salary
based on 153 salaries
₹2.7 L/yr - ₹7.2 L/yr
14% less than the average Engineer Salary in India
View more details

Dilip Buildcon Engineer Reviews and Ratings

based on 35 reviews

3.9/5

Rating in categories

4.1

Skill development

3.7

Work-Life balance

3.8

Salary & Benefits

4.0

Job Security

3.9

Company culture

3.7

Promotions/Appraisal

4.0

Work Satisfaction

Explore 35 Reviews and Ratings
Senior Engineer
244 salaries
unlock blur

₹4 L/yr - ₹10.9 L/yr

Asst Store
203 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Store Executive
193 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Structural Engineer
181 salaries
unlock blur

₹2.7 L/yr - ₹6.7 L/yr

Mechanical Engineer
175 salaries
unlock blur

₹2.2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare Dilip Buildcon with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview