Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.
Safety precautions, risk assessment, road signs, ISI marking, barricades, and basic computer knowledge are important for a safety engineer.
Safety precautions are measures taken to prevent accidents or injuries.
Risk assessment is the process of identifying potential hazards and evaluating the likelihood and severity of harm.
Road signs are important for communicating information to drivers and pedestrians.
ISI marking ind...
Risk is the likelihood of harm occurring, while hazards are potential sources of harm.
Risk is the probability of an event happening and the severity of its consequences
Hazards are potential sources of harm that can cause injury, illness, or damage to property
Risk assessment involves identifying hazards and evaluating the likelihood and severity of harm
Examples of hazards include chemicals, machinery, and environmental ...
I applied via Company Website and was interviewed before Feb 2021. There were 2 interview rounds.
Top trending discussions
I was interviewed in Mar 2023.
posted on 14 Oct 2023
I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.
Density of bentonite and prestressing formula are two separate topics in civil engineering.
Density of bentonite is typically around 2.0-2.5 g/cm^3.
Prestressing formula involves calculating the stress in a structure due to applied loads and prestressing forces.
Example of prestressing formula: Stress = Load / Area + Prestressing Force / Area
posted on 26 Jan 2025
CoS billing procedure involves categorizing and prioritizing traffic for billing purposes.
CoS (Class of Service) is a method used in networking to prioritize different types of traffic.
Billing procedures based on CoS involve assigning costs or charges to different classes of service.
Examples include charging more for high-priority traffic like VoIP calls compared to lower-priority data traffic.
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
Launching girder is a temporary structure used in construction to move and position heavy loads.
Launching girder is typically made of steel and consists of multiple sections that can be assembled and disassembled.
It is used in the construction of bridges, viaducts, and other structures to lift and move precast concrete segments into position.
The launching operation involves the step-by-step movement of the girder along...
posted on 30 Nov 2023
I was interviewed before Nov 2022.
based on 1 interview
Interview experience
based on 12 reviews
Rating in categories
Senior Engineer
212
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
207
salaries
| ₹0 L/yr - ₹0 L/yr |
Asst Store
201
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
193
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
178
salaries
| ₹0 L/yr - ₹0 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
PNC Infratech