Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by MKC Infrastructure Ltd. Team. If you also belong to the team, you can get access from here

MKC Infrastructure Ltd. Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

MKC Infrastructure Ltd. Interview Questions and Answers

Updated 9 Apr 2025
Popular Designations

29 Interview questions

An Assistant Manager was asked
Q. What are the hindrances at your site?
Ans. 

The hindrance at our site is outdated technology and lack of proper training for employees.

  • Outdated technology slows down processes and hinders productivity

  • Lack of proper training leads to inefficiency and mistakes

  • Both issues need to be addressed to improve overall performance

View all Assistant Manager interview questions
A QS Engineer was asked
Q. What is OGL sampling and what are its details?
Ans. 

OGL Sampling stands for OpenGL Sampling. It is a technique used to improve the quality of graphics rendering in computer graphics.

  • OGL Sampling is used to reduce aliasing and improve the quality of graphics.

  • It involves taking multiple samples of a pixel and averaging the color values to produce a smoother image.

  • The number of samples taken per pixel can be adjusted to balance quality and performance.

  • OGL Sampling is ...

View all QS Engineer interview questions
A QS Engineer was asked
Q. What is the IS code for BBS and Measurements?
Ans. 

The IS code for BBS & Measurements is IS 13920:2016.

  • IS 13920:2016 is the Indian Standard code for detailing of reinforcement in concrete structures.

  • It provides guidelines for the preparation of bar bending schedules (BBS) and measurement of reinforcement.

  • The code specifies the requirements for the dimensions, shape, and position of reinforcement in various structural elements.

  • It also covers the calculation of cutt...

View all QS Engineer interview questions
A QS Engineer was asked
Q. What is an EPC Contract?
Ans. 

EPC Contract stands for Engineering, Procurement, and Construction Contract.

  • EPC Contract is a type of construction contract where the contractor is responsible for the entire project from design to construction.

  • The contractor is responsible for the engineering, procurement, and construction of the project.

  • EPC Contracts are commonly used in large-scale infrastructure projects such as power plants, oil refineries, a...

View all QS Engineer interview questions
A Junior Engineer was asked
Q. How would you design a box culvert step by step?
Ans. 

Designing a box culvert involves several steps including site investigation, hydraulic analysis, structural design, and construction planning.

  • Conduct a site investigation to determine the soil conditions and water table level

  • Perform hydraulic analysis to determine the flow rate and water level

  • Select appropriate materials and dimensions for the culvert based on hydraulic and structural requirements

  • Design the struct...

View all Junior Engineer interview questions
A Junior Engineer was asked
Q. What is active earth pressure?
Ans. 

Active earth pressure is the lateral pressure exerted by soil on a retaining structure when the soil is in a state of movement.

  • Active earth pressure is also known as dynamic earth pressure.

  • It is the pressure exerted by soil on a retaining structure when the soil is in a state of movement.

  • It is calculated using Rankine's theory or Coulomb's theory.

  • The magnitude of active earth pressure depends on the angle of inter...

View all Junior Engineer interview questions
A QS Engineer was asked
Q. How do you monitor overlapping activities?
Ans. 

Overlapping can be monitored by using software tools that can detect and highlight overlapping areas.

  • Use software tools like AutoCAD, Revit, or Navisworks to detect overlapping elements

  • Check for clashes between different systems like mechanical, electrical, and plumbing

  • Perform regular clash detection tests during the design and construction phases

  • Ensure that all stakeholders are aware of the overlapping issues and...

View all QS Engineer interview questions
Are these interview questions helpful?
A QS Engineer was asked
Q. What are the roles of a Quantity Surveyor?
Ans. 

QS roles include cost estimation, budgeting, tendering, contract administration, and project management.

  • Estimating and costing of construction projects

  • Preparing tender documents and analyzing bids

  • Contract administration and management

  • Project management and coordination

  • Ensuring compliance with regulations and standards

View all QS Engineer interview questions
A QS Engineer was asked
Q. What software do you use for quantity calculation?
Ans. 

Software used for quantity calculation includes AutoCAD, Revit, Bluebeam, PlanSwift, and On-Screen Takeoff.

  • AutoCAD is a popular software for 2D and 3D design and drafting

  • Revit is a BIM software used for building design and construction

  • Bluebeam is a PDF software with measurement tools for estimating

  • PlanSwift is a takeoff and estimating software for construction

  • On-Screen Takeoff is a digital takeoff software for con...

View all QS Engineer interview questions
A Planning Engineer was asked
Q. What is a construction budget?
Ans. 

Construction budget is the estimated cost of a construction project.

  • It includes all expenses related to the project such as labor, materials, equipment, permits, and fees.

  • The budget is usually created before the project starts and is used to track expenses throughout the project.

  • It helps to ensure that the project is completed within the allocated funds.

  • The budget can be adjusted if necessary due to unforeseen cir...

View all Planning Engineer interview questions

MKC Infrastructure Ltd. Interview Experiences

34 interviews found

Engineer Interview Questions & Answers

user image GAURAV KUMAR

posted on 7 Mar 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025.

Round 1 - HR 

(1 Question)

  • Q1. What is the reason for change?
  • Ans. 

    Change is driven by necessity, innovation, and adaptation to evolving circumstances or challenges.

    • Necessity: Change often arises from the need to solve problems, such as improving safety in engineering designs.

    • Innovation: New technologies can prompt change, like the shift from traditional to renewable energy sources.

    • Adaptation: Organizations may change to meet new regulations or market demands, such as adopting sustain...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Past Work Experience Details?
  • Ans. 

    I have diverse engineering experience in project management, design, and implementation across various industries.

    • Led a team of engineers in developing a new product line, resulting in a 20% increase in market share.

    • Implemented a quality control system that reduced defects by 30% in manufacturing processes.

    • Collaborated with cross-functional teams to streamline operations, improving efficiency by 15%.

    • Conducted research ...

  • Answered by AI
  • Q2. Technical Questions
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025.

Round 1 - One-on-one 

(1 Question)

  • Q1. HR Round, Technical Round
Round 2 - One-on-one 

(1 Question)

  • Q1. MD Round, Salary Decision
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Details of JOB and working analysis
  • Q2. Experience details
Round 2 - One-on-one 

(2 Questions)

  • Q1. Working details
  • Q2. Skill and Experience

Process Developer Interview Questions & Answers

user image Ruksar Rukku

posted on 21 Oct 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Mkn hyugt tgtfedecjnygrf resecfgh
  • Q2. Jjkiu7tgtftr ffgbhhu jnhtdeswswaswqa
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About Salary and accomodation
Round 2 - Technical 

(1 Question)

  • Q1. About Job details and Qualifications and Experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - HR 

(1 Question)

  • Q1. Why do you want to work for this company.

Billing Engineer Interview Questions & Answers

user image Jignesh Chauhan(QS-HO)

posted on 7 Mar 2025

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell us about yourself?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024.

Round 1 - HR 

(1 Question)

  • Q1. Why do you want to join MKC?
  • Ans. 

    I am drawn to MKC for its innovative approach, commitment to excellence, and opportunities for professional growth in a dynamic environment.

    • MKC's reputation for innovation aligns with my passion for creative problem-solving, as seen in my project on sustainable business practices.

    • The company's commitment to employee development through training programs resonates with my desire to continuously improve my skills.

    • I admir...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About Role in planning
  • Q2. About role in billing

Executive Interview Questions & Answers

user image Anonymous

posted on 6 Mar 2025

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HOD 

(2 Questions)

  • Q1. Where are you currently employed?
  • Ans. 

    I am currently employed as a Senior Operations Manager at a leading logistics company, overseeing supply chain efficiency.

    • Leading a team of 50+ employees to optimize delivery routes, resulting in a 20% reduction in transportation costs.

    • Implementing new software solutions that improved inventory tracking accuracy by 30%.

    • Collaborating with cross-functional teams to enhance customer satisfaction scores by 15% over the pas...

  • Answered by AI
  • Q2. Why did you leave your previous company?
  • Ans. 

    I left my previous company to pursue new challenges and opportunities for growth in my career.

    • I sought a role that aligned more closely with my long-term career goals.

    • The company culture shifted, and I felt it was time for a change.

    • I wanted to explore new industries and broaden my skill set.

    • I was presented with an opportunity that offered greater responsibility and leadership potential.

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
5d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about MKC Infrastructure Ltd.?
Ask anonymously on communities.

MKC Infrastructure Ltd. Interview FAQs

How many rounds are there in MKC Infrastructure Ltd. interview?
MKC Infrastructure Ltd. interview process usually has 1-2 rounds. The most common rounds in the MKC Infrastructure Ltd. interview process are HR, Technical and Resume Shortlist.
How to prepare for MKC Infrastructure Ltd. interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at MKC Infrastructure Ltd.. The most common topics and skills that interviewers at MKC Infrastructure Ltd. expect are Accounting, Corporate Affairs, Government Relations, Client Billing and Land Acquisition.
What are the top questions asked in MKC Infrastructure Ltd. interview?

Some of the top questions asked at the MKC Infrastructure Ltd. interview -

  1. What is FDD what is the density of soil Loose and Compact...read more
  2. What is the IS code of BBS & Measuremen...read more
  3. How would you design a box culvert step by ste...read more
What are the most common questions asked in MKC Infrastructure Ltd. HR round?

The most common HR questions asked in MKC Infrastructure Ltd. interview are -

  1. Why are you looking for a chan...read more
  2. What are your salary expectatio...read more
  3. What is your family backgrou...read more
How long is the MKC Infrastructure Ltd. interview process?

The duration of MKC Infrastructure Ltd. interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

3.9/5

based on 55 interview experiences

Difficulty level

Easy 25%
Moderate 63%
Hard 13%

Duration

Less than 2 weeks 87%
2-4 weeks 13%
View more

MKC Infrastructure Ltd. Reviews and Ratings

based on 364 reviews

3.6/5

Rating in categories

3.5

Skill development

3.3

Work-life balance

3.2

Salary

3.4

Job security

3.2

Company culture

3.2

Promotions

3.4

Work satisfaction

Explore 364 Reviews and Ratings
Junior Engineer
36 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Executive Accountant
32 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Highway Engineer
29 salaries
unlock blur

₹1.9 L/yr - ₹5 L/yr

Assistant Manager
28 salaries
unlock blur

₹4.2 L/yr - ₹9.6 L/yr

Senior Engineer
28 salaries
unlock blur

₹4 L/yr - ₹7.8 L/yr

Explore more salaries
Compare MKC Infrastructure Ltd. with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
write
Share an Interview