Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Mkc Infrastructure Team. If you also belong to the team, you can get access from here

Mkc Infrastructure Verified Tick

Compare button icon Compare button icon Compare
3.6

based on 287 Reviews

Filter interviews by

Mkc Infrastructure Interview Questions, Process, and Tips

Updated 21 Oct 2024

Top Mkc Infrastructure Interview Questions and Answers

View all 21 questions

Mkc Infrastructure Interview Experiences

Popular Designations

22 interviews found

QS Engineer Interview Questions & Answers

user image Anonymous

posted on 21 Dec 2022

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Define roles of QS ?
  • Ans. 

    QS roles include cost estimation, budgeting, tendering, contract administration, and project management.

    • Estimating and costing of construction projects

    • Preparing tender documents and analyzing bids

    • Contract administration and management

    • Project management and coordination

    • Ensuring compliance with regulations and standards

  • Answered by AI
  • Q2. How to monitor over lapping ?
  • Ans. 

    Overlapping can be monitored by using software tools that can detect and highlight overlapping areas.

    • Use software tools like AutoCAD, Revit, or Navisworks to detect overlapping elements

    • Check for clashes between different systems like mechanical, electrical, and plumbing

    • Perform regular clash detection tests during the design and construction phases

    • Ensure that all stakeholders are aware of the overlapping issues and work

  • Answered by AI
  • Q3. Software used for quantity calculation ?
  • Ans. 

    Software used for quantity calculation includes AutoCAD, Revit, Bluebeam, PlanSwift, and On-Screen Takeoff.

    • AutoCAD is a popular software for 2D and 3D design and drafting

    • Revit is a BIM software used for building design and construction

    • Bluebeam is a PDF software with measurement tools for estimating

    • PlanSwift is a takeoff and estimating software for construction

    • On-Screen Takeoff is a digital takeoff software for construc

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - good luck , hope for best. And you will achieved a

Skills evaluated in this interview

Top Mkc Infrastructure QS Engineer Interview Questions and Answers

Q1. What is FDD what is the density of soil Loose and Compacted?
View answer (1)

QS Engineer Interview Questions asked at other Companies

Q1. Basic specifications of Plastering, How much Deductions are to be made for plastering (internal and External), what is Bar Bending Schedule what will be the cutting length for stirrups of Beam size 230x450 what are the Basic Documentation f... read more
View answer (1)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. How many years of experience you have in bridge design engineering?
  • Q2. Why should we hire you ?
Round 3 - Technical 

(2 Questions)

  • Q1. What is active earth pressure?
  • Ans. 

    Active earth pressure is the lateral pressure exerted by soil on a retaining structure when the soil is in a state of movement.

    • Active earth pressure is also known as dynamic earth pressure.

    • It is the pressure exerted by soil on a retaining structure when the soil is in a state of movement.

    • It is calculated using Rankine's theory or Coulomb's theory.

    • The magnitude of active earth pressure depends on the angle of internal f...

  • Answered by AI
  • Q2. How would you design a box culvert step by step ?
  • Ans. 

    Designing a box culvert involves several steps including site investigation, hydraulic analysis, structural design, and construction planning.

    • Conduct a site investigation to determine the soil conditions and water table level

    • Perform hydraulic analysis to determine the flow rate and water level

    • Select appropriate materials and dimensions for the culvert based on hydraulic and structural requirements

    • Design the structural ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Mkc Infrastructure Junior Engineer interview:
  • Structural Analysis
  • RCC
  • pre stress
Interview preparation tips for other job seekers - Prepare well for your technical rounds and brush up all technical subjects like structural analysis, rcc

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What are responsibilities of construction manager
  • Ans. 

    Construction manager is responsible for overseeing the construction process from start to finish.

    • Planning and scheduling construction activities

    • Managing project budget and resources

    • Ensuring compliance with safety regulations and building codes

    • Hiring and supervising subcontractors and construction workers

    • Communicating with clients, architects, and engineers

    • Resolving any issues or conflicts that arise during construction

    • ...

  • Answered by AI
  • Q2. What is osha compliance
  • Ans. 

    OSHA compliance refers to adhering to the safety standards set by the Occupational Safety and Health Administration.

    • OSHA compliance ensures a safe and healthy workplace for employees

    • It involves following regulations related to hazardous materials, equipment safety, and training programs

    • Examples of OSHA compliance include providing personal protective equipment, conducting regular safety inspections, and maintaining acc...

  • Answered by AI
  • Q3. What is construction budget
  • Ans. 

    Construction budget is the estimated cost of a construction project.

    • It includes all expenses related to the project such as labor, materials, equipment, permits, and fees.

    • The budget is usually created before the project starts and is used to track expenses throughout the project.

    • It helps to ensure that the project is completed within the allocated funds.

    • The budget can be adjusted if necessary due to unforeseen circumst...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Study well dont fake on resume .Add only as per your experience

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

QS Engineer Interview Questions & Answers

user image Anonymous

posted on 18 Apr 2023

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is CA and how many schedule are there?
  • Ans. 

    CA stands for Contract Administration. There are typically 3 schedules in a construction contract.

    • CA involves managing and enforcing the terms of a construction contract.

    • The 3 schedules in a construction contract are typically: Schedule of Values, Payment Schedule, and Change Order Schedule.

    • The Schedule of Values outlines the budget for the project, the Payment Schedule outlines when payments will be made, and the Chan...

  • Answered by AI
  • Q2. What is EPC Contract?
  • Ans. 

    EPC Contract stands for Engineering, Procurement, and Construction Contract.

    • EPC Contract is a type of construction contract where the contractor is responsible for the entire project from design to construction.

    • The contractor is responsible for the engineering, procurement, and construction of the project.

    • EPC Contracts are commonly used in large-scale infrastructure projects such as power plants, oil refineries, and hi...

  • Answered by AI
  • Q3. What is FDD what is the density of soil Loose and Compacted?
  • Ans. 

    FDD stands for Field Density Test. Loose soil density ranges from 1.2 to 1.4 g/cm³ and compacted soil density ranges from 1.4 to 1.6 g/cm³.

    • FDD is a test used to determine the density of soil in the field.

    • Loose soil density ranges from 1.2 to 1.4 g/cm³.

    • Compacted soil density ranges from 1.4 to 1.6 g/cm³.

    • The density of soil affects its strength and load-bearing capacity.

    • The density of soil can be increased through compac

  • Answered by AI
  • Q4. What is OGL Sampling and details of it?
  • Ans. 

    OGL Sampling stands for OpenGL Sampling. It is a technique used to improve the quality of graphics rendering in computer graphics.

    • OGL Sampling is used to reduce aliasing and improve the quality of graphics.

    • It involves taking multiple samples of a pixel and averaging the color values to produce a smoother image.

    • The number of samples taken per pixel can be adjusted to balance quality and performance.

    • OGL Sampling is commo...

  • Answered by AI
  • Q5. What is the IS code of BBS & Measurements?
  • Ans. 

    The IS code for BBS & Measurements is IS 13920:2016.

    • IS 13920:2016 is the Indian Standard code for detailing of reinforcement in concrete structures.

    • It provides guidelines for the preparation of bar bending schedules (BBS) and measurement of reinforcement.

    • The code specifies the requirements for the dimensions, shape, and position of reinforcement in various structural elements.

    • It also covers the calculation of cutting l...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be technically sound and prefer English.

Skills evaluated in this interview

Top Mkc Infrastructure QS Engineer Interview Questions and Answers

Q1. What is FDD what is the density of soil Loose and Compacted?
View answer (1)

QS Engineer Interview Questions asked at other Companies

Q1. Basic specifications of Plastering, How much Deductions are to be made for plastering (internal and External), what is Bar Bending Schedule what will be the cutting length for stirrups of Beam size 230x450 what are the Basic Documentation f... read more
View answer (1)

Mkc Infrastructure interview questions for popular designations

 Planning Engineer

 (2)

 QS Engineer

 (2)

 Admin Manager

 (1)

 Assistant Accounts Manager

 (1)

 Assistant Manager

 (1)

 Civil Graduate Engineer Trainee

 (1)

 Deputy Manager

 (1)

 Electrician

 (1)

Surveyor Interview Questions & Answers

user image Anonymous

posted on 2 Dec 2023

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Eske pahle aap kaun se company me Kam kar rahe the?
  • Ans. PNC INFRATECH LTD Delhi to Baroda expressway pkg 31
  • Answered Anonymously
  • Q2. Kya company aapko jahan bhejegi wahan kaam karne jaoge?
  • Q3. Kya aapko company jahan bhejengi wahan jaoge kaam karne?
  • Q4. Kya aap wine pite Hain
  • Q5. Aapke wahan hr kaun tha?
  • Q6. Mr amresh tripathi
Round 3 - Technical 

(6 Questions)

  • Q1. Kya aap survey ka kaam kar lete hain?
  • Q2. Aapko auto level aur total machin chalana aata hai?
  • Q3. Kya aapko auto cad aata hai?
  • Ans. Nahi abhi Mera learning chal Raha hai learn vern se
  • Answered Anonymously
  • Q4. Aapko center line mark karne ke liye kitne station point ki jarurat hai?
  • Ans. 3 three do se machin set hoga aur teesre se checking ke liye.
  • Answered Anonymously
  • Q5. Kya aapko area calculation aata hai
  • Q6. Kya aap layout marking kar sakte hain?

Interview Preparation Tips

Interview preparation tips for other job seekers - Aap interview ke liye confidence se jayen aur sabhi sawalon ke uttar twarit aur sahi den Jo kaam nahi aata ho uske liye jhuth na bolen. Imandari purvak jawab den baaton ko jyada ghuma ke nahi karen. Seedha aur sathik uttar den. Hadbadaye nahi. Dhanywad

Surveyor Interview Questions asked at other Companies

Q1. How much bench marks important your total station for centre line marking.
View answer (3)

Get interview-ready with Top Mkc Infrastructure Interview Questions

Electrician Interview Questions & Answers

user image Anonymous

posted on 19 Dec 2021

Interview Questionnaire 

4 Questions

  • Q1. How much types of transformer?
  • Ans. 

    There are several types of transformers used in electrical systems.

    • Step-up transformer

    • Step-down transformer

    • Isolation transformer

    • Auto transformer

    • Distribution transformer

    • Instrument transformer

  • Answered by AI
  • Q2. In which direction flow of electric current?
  • Ans. 

    Electric current flows from positive to negative terminal.

    • Electric current flows from a higher potential to a lower potential.

    • In a circuit, the flow of current is from the positive terminal of the power source to the negative terminal.

    • This convention is based on the movement of electrons, which are negatively charged particles.

    • For example, in a battery-powered circuit, the current flows from the positive terminal of th

  • Answered by AI
  • Q3. How many type of current
  • Ans. 

    There are two types of current: direct current (DC) and alternating current (AC).

    • Direct current (DC) flows in one direction only.

    • Alternating current (AC) changes direction periodically.

    • DC is commonly used in batteries and electronic devices.

    • AC is used in homes and businesses for powering appliances and lighting.

    • AC is generated by power plants and transmitted through power lines.

  • Answered by AI
  • Q4. How many type wire use in wiring
  • Ans. 

    There are several types of wire used in wiring, including copper wire, aluminum wire, and coaxial cable.

    • Copper wire is commonly used for electrical wiring due to its high conductivity.

    • Aluminum wire is used in some applications, but it is less common than copper wire.

    • Coaxial cable is used for transmitting high-frequency signals, such as in cable television or internet connections.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Plz going for interview with fully confidence. And give the correct answer with current time.. Don't give any excuse for any question, if don't have the knowledge about the questions give the answer am don't know about this... Question .... Thanks and good luck....

Electrician Interview Questions asked at other Companies

Q1. 1. How much current takes a 5hp motor ?, 2. Draw a STAR DELTA and DOL starter control wireing. 3. How to connect star connection, and DELTA connectin. 4. What is the kw of 30hp motor ?, 5. Can you connect a temperature controller ?, 6. What... read more
View answer (5)

Jobs at Mkc Infrastructure

View all

Senior Manager cum HOD Inventory Control Interview Questions & Answers

user image Anonymous

posted on 18 May 2022

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What about store procedure, system & previous experience
  • Ans. Store is a part of supply chain management system including Inventory Management, warehousing, utilisation & reconciliations of material & balance sheet corresponding with procurement, planning, execution & account finance
  • Answered Anonymously
Round 3 - Case Study 

Document verifications

Interview Preparation Tips

Interview preparation tips for other job seekers - mkc is non cultured owner base company. Their is no value respect of

Admin Manager Interview Questions & Answers

user image Anonymous

posted on 12 Oct 2021

Interview Questionnaire 

1 Question

  • Q1. 1. Asked about previous experiences

Interview Preparation Tips

Interview preparation tips for other job seekers - Dont join this company as they will say after interview, do admin work for corporate office and will say after 3 months you will get increment of 5 percent. As they give 5 percent more only than previous job while joining. Aftet 3 months when I asked increment they said you havd only worked for office and not for sites and never gave increment. They fool people after jojning. The shared accomodation and food given is of bad quality.

Admin Manager Interview Questions asked at other Companies

Q1. What has been your experience with international travel booking for management personnel and vendors, including processing visas and related tasks?
View answer (1)

I applied via Recruitment Consulltant and was interviewed in Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why are you looking for a change?
  • Q5. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Candidate should have basic knowledge in Same field and give answers for All Questions positively.

Procurement Executive Interview Questions asked at other Companies

Q1. What are the detail that you will share to the supplier for getting a quote.?
View answer (2)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Avoid using too much corporate jargon in your CV. Sometimes keeping things simple will get your job done.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me about your self
  • Q2. How many years do you have experience
  • Q3. Working experience how many companies

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be master in your field what you have done in company

Purchase Officer Interview Questions asked at other Companies

Q1. HOW YOU WILL HANDLE SITUATIONS WHERE THE USER LACKS KNOWLEDGE AND IS UNABLE TO UNDERSTAND THE EXECUTION OF SOME PURCHASE WORKS?
View answer (5)

Mkc Infrastructure Interview FAQs

How many rounds are there in Mkc Infrastructure interview?
Mkc Infrastructure interview process usually has 1-2 rounds. The most common rounds in the Mkc Infrastructure interview process are HR, Technical and Resume Shortlist.
How to prepare for Mkc Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Mkc Infrastructure. The most common topics and skills that interviewers at Mkc Infrastructure expect are Accounting, Corporate Affairs, Government Relations, Liaison and Recruitment.
What are the top questions asked in Mkc Infrastructure interview?

Some of the top questions asked at the Mkc Infrastructure interview -

  1. What is FDD what is the density of soil Loose and Compact...read more
  2. What is the IS code of BBS & Measuremen...read more
  3. How would you design a box culvert step by ste...read more
How long is the Mkc Infrastructure interview process?

The duration of Mkc Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Mkc Infrastructure Interview Process

based on 8 interviews in last 1 year

Interview experience

4.5
  
Good
View more

People are getting interviews through

based on 15 Mkc Infrastructure interviews
Company Website
Job Portal
WalkIn
Campus Placement
Referral
33%
20%
13%
7%
7%
20% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 398 Interviews
GMR Group Interview Questions
4.1
 • 74 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 64 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
View all

Mkc Infrastructure Reviews and Ratings

based on 287 reviews

3.6/5

Rating in categories

3.5

Skill development

3.3

Work-Life balance

3.2

Salary & Benefits

3.4

Job Security

3.2

Company culture

3.2

Promotions/Appraisal

3.3

Work Satisfaction

Explore 287 Reviews and Ratings
Engineer/Sr. Engineer - Planning & Billing

Karimganj,

Dhrol

+1

4-7 Yrs

Not Disclosed

Sr. Mechanical Engineer

Gandhinagar

5-7 Yrs

Not Disclosed

Project Manager (Real Estate)

Gandhinagar

8-10 Yrs

Not Disclosed

Explore more jobs
Junior Engineer
30 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Executive Accountant
30 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Highway Engineer
26 salaries
unlock blur

₹1.9 L/yr - ₹4.9 L/yr

Senior Engineer
24 salaries
unlock blur

₹4 L/yr - ₹7.8 L/yr

Assistant Manager
22 salaries
unlock blur

₹4 L/yr - ₹9.6 L/yr

Explore more salaries
Compare Mkc Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview