Q1. What is FDD what is the density of soil Loose and Compacted?

Ans.

FDD stands for Field Density Test. Loose soil density ranges from 1.2 to 1.4 g/cm³ and compacted soil density ranges from 1.4 to 1.6 g/cm³.

  • FDD is a test used to determine the density of soil in the field.

  • Loose soil density ranges from 1.2 to 1.4 g/cm³.

  • Compacted soil density ranges from 1.4 to 1.6 g/cm³.

  • The density of soil affects its strength and load-bearing capacity.

  • The density of soil can be increased through compaction techniques such as tamping or rolling.

Add your answer

Q2. What is the IS code of BBS & Measurements?

Ans.

The IS code for BBS & Measurements is IS 13920:2016.

  • IS 13920:2016 is the Indian Standard code for detailing of reinforcement in concrete structures.

  • It provides guidelines for the preparation of bar bending schedules (BBS) and measurement of reinforcement.

  • The code specifies the requirements for the dimensions, shape, and position of reinforcement in various structural elements.

  • It also covers the calculation of cutting length, development length, and lap length of reinforcement...read more

View 1 answer

Q3. What is CA and how many schedule are there?

Ans.

CA stands for Contract Administration. There are typically 3 schedules in a construction contract.

  • CA involves managing and enforcing the terms of a construction contract.

  • The 3 schedules in a construction contract are typically: Schedule of Values, Payment Schedule, and Change Order Schedule.

  • The Schedule of Values outlines the budget for the project, the Payment Schedule outlines when payments will be made, and the Change Order Schedule outlines the process for making changes ...read more

Add your answer

Q4. What is OGL Sampling and details of it?

Ans.

OGL Sampling stands for OpenGL Sampling. It is a technique used to improve the quality of graphics rendering in computer graphics.

  • OGL Sampling is used to reduce aliasing and improve the quality of graphics.

  • It involves taking multiple samples of a pixel and averaging the color values to produce a smoother image.

  • The number of samples taken per pixel can be adjusted to balance quality and performance.

  • OGL Sampling is commonly used in video games and other real-time graphics appli...read more

Add your answer
Discover Hitachi Johnson Controls Air Conditioning interview dos and don'ts from real experiences

Q5. What is EPC Contract?

Ans.

EPC Contract stands for Engineering, Procurement, and Construction Contract.

  • EPC Contract is a type of construction contract where the contractor is responsible for the entire project from design to construction.

  • The contractor is responsible for the engineering, procurement, and construction of the project.

  • EPC Contracts are commonly used in large-scale infrastructure projects such as power plants, oil refineries, and highways.

  • The contractor is responsible for delivering the pr...read more

Add your answer

Q6. How to monitor over lapping ?

Ans.

Overlapping can be monitored by using software tools that can detect and highlight overlapping areas.

  • Use software tools like AutoCAD, Revit, or Navisworks to detect overlapping elements

  • Check for clashes between different systems like mechanical, electrical, and plumbing

  • Perform regular clash detection tests during the design and construction phases

  • Ensure that all stakeholders are aware of the overlapping issues and work together to resolve them

Add your answer

Q7. Software used for quantity calculation ?

Ans.

Software used for quantity calculation includes AutoCAD, Revit, Bluebeam, PlanSwift, and On-Screen Takeoff.

  • AutoCAD is a popular software for 2D and 3D design and drafting

  • Revit is a BIM software used for building design and construction

  • Bluebeam is a PDF software with measurement tools for estimating

  • PlanSwift is a takeoff and estimating software for construction

  • On-Screen Takeoff is a digital takeoff software for construction

Add your answer

Q8. Define roles of QS ?

Ans.

QS roles include cost estimation, budgeting, tendering, contract administration, and project management.

  • Estimating and costing of construction projects

  • Preparing tender documents and analyzing bids

  • Contract administration and management

  • Project management and coordination

  • Ensuring compliance with regulations and standards

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter