Senior Engineer QS
Senior Engineer QS Interview Questions and Answers
Q1. What is the co-efficient of tile adhesive for wall cladding ?
The co-efficient of tile adhesive for wall cladding is typically around 0.5 to 0.7.
The co-efficient of tile adhesive refers to the amount of adhesive needed to secure a certain area of wall cladding.
It is usually recommended to follow the manufacturer's instructions for the specific type of tile adhesive being used.
The co-efficient can vary based on factors such as the type of tiles, substrate, and environmental conditions.
For wall cladding, the co-efficient is typically in t...read more
Q2. What is the productivity of one carpenter & 1 bar bender ?
Productivity of one carpenter & 1 bar bender depends on the type of work and skill level.
Productivity can vary based on the complexity of the task assigned.
A skilled carpenter may be able to complete tasks faster than an inexperienced one.
Efficiency of tools and equipment can also impact productivity.
On average, a carpenter can complete 8-12 square meters of formwork per day, while a bar bender can bend around 200-300 bars per day.
Q3. What are the indirect cost of a project ?
Indirect costs of a project are expenses not directly related to the specific project activities.
Indirect labor costs (e.g. supervision, support staff)
Indirect materials costs (e.g. consumables, tools)
Indirect expenses (e.g. utilities, rent)
Overhead costs (e.g. administrative expenses)
Insurance costs
Taxes
Q4. What is the unit of skirting ?
The unit of skirting is typically measured in linear feet or meters.
Skirting is typically measured in linear feet or meters
It is used to cover the joint between the wall and the floor
Commonly used in construction and interior design projects
Q5. How to prepare measurement sheet?
Measurement sheet is prepared by taking off quantities from drawings and specifications.
Review drawings and specifications to identify items to be measured
Take accurate measurements using appropriate tools and techniques
Record measurements in a systematic manner on the measurement sheet
Include relevant details such as dimensions, quantities, and units
Double-check measurements for accuracy and completeness
Organize the measurement sheet in a clear and logical format
Ensure all n...read more
Q6. Current project billing process
Our current project billing process involves tracking expenses, labor costs, and materials used to accurately bill clients.
We track expenses such as equipment rentals, subcontractor costs, and travel expenses.
Labor costs are calculated based on hours worked by each team member and their respective rates.
Materials used are documented and their costs are included in the billing.
We ensure all expenses are properly allocated to the correct project to avoid discrepancies.
Regular r...read more
Share interview questions and help millions of jobseekers 🌟
Senior Engineer QS Jobs
0Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month