Round 1 - Technical 

(1 Question)

  • Q1. What are the qualities required for a manager ???

I applied via Walk-in and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About proper site issues, explainetion of proper work details.
Round 2 - HR 

(1 Question)

  • Q1. Salary discuss and notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Always go with truth, one false details and your jod gone.

Associate Manager Interview Questions Asked at Other Companies

Q1. How will you calculate tension on the sheet which is being given ... read more
asked in Accenture
Q2. What is Soc7 and other Cobol /Jcl error codes ...
asked in PepsiCo
Q3. In Sponsored Products, how many types of campaigns can you make?
Q4. What will happen if there is leakage inside De Oxo furnace of you ... read more
asked in PepsiCo
Q5. Are you familiar to environment where you have to explain what is ... read more

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About Highway Work related and Earthwork related
  • Q2. About Flexible pavement

Interview Preparation Tips

Interview preparation tips for other job seekers - HGIEL is very up growthing company for highway work
Good team work
Cooperative staff and HR team
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Reagarding work experiences & background.
Round 2 - Technical 

(4 Questions)

  • Q1. Related to technical aspects of projects executed.
  • Q2. Concrete mix designs
  • Q3. P&M productivity - Earth works
  • Q4. Customer relationship related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers. See the scope and technical aspects of the experience claimed.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Related TBM Tunnelling
  • Q2. How to work in metro city with EPB machine
  • Ans. 

    To work in a metro city with an EPB machine, one must be familiar with its operation and maintenance.

    • Understand the operation of the EPB machine and follow safety protocols

    • Regularly maintain and inspect the EPB machine to ensure proper functioning

    • Coordinate with other team members and stakeholders for efficient project execution

    • Stay updated on the latest technology and advancements in EPB machines

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Discussion about qualification
  • Q2. About salary and qualification
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Related to field and years of experience
  • Q2. Salary,expectations,company requirements and commitment to work
  • Q3. They test your patience and response capability
Round 3 - Technical 

(2 Questions)

  • Q1. Cable laying and jointing knowledge
  • Q2. Related to field inspection and site acceptance

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in advance irrespective of field too,they make ask different questions to check your capable to give better position other than applied.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Ans. 

    The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.

    • The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.

    • The raising main typically has gate valves, check valves, and air release valves.

    • The cooling lubrication system is responsib...

  • Answered by AI
  • Q2. Why are you going to quit the current job?
  • Ans. 

    I am looking for new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Wanting to expand my skill set and knowledge

    • Desire for a higher level of responsibility

    • Seeking a better work-life balance

    • Unsatisfied with the current work environment or company culture

  • Answered by AI
  • Q3. What is your salary expectation?
  • Ans. 

    I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.

    • I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.

    • I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident..
Be Genuine..
Listen each & every Qustion or case study & Explain properly as per practical conditions.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Stairs case ralling Section and fixing process
  • Q2. Productivity of plaster work and tiles
  • Ans. 

    The productivity of plaster work and tiles is an important factor in construction projects.

    • Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.

    • Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.

    • For example, experienced plasterers may be able to apply plaster m...

  • Answered by AI
  • Q3. Centiler beam steel design
  • Ans. 

    Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.

    • Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.

    • The section modulus is then used to select the appropriate beam size from standard steel beam tables.

    • Factors such as the type of load, material properties, and safety factors a...

  • Answered by AI
  • Q4. In footing 25 mm dia bend deduction yes ya No
  • Q5. Responsibility and team' work
  • Q6. Your work at site?
  • Q7. Work permit at site
  • Q8. Density of steel with unit
  • Ans. 

    The density of steel is a measure of its mass per unit volume.

    • Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.

    • The density of steel is an impo...

  • Answered by AI
  • Q9. AAC block price and size details
  • Ans. 

    AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.

    • AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.

    • The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.

    • The prices of AAC blocks depend on factors such as the brand, quality, and qu...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Assistant Manager interview:
  • Nice

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Salary negotiation
  • Q2. Job specific questions
  • Q3. Job specific questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give to the point answers. Most of the questions will be from your expertise only.

GVPR Engineers Interview FAQs

How many rounds are there in GVPR Engineers Associate Manager interview?
GVPR Engineers interview process usually has 1-2 rounds. The most common rounds in the GVPR Engineers interview process are Technical and HR.

Tell us how to improve this page.

GVPR Engineers Associate Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
GVPR Engineers Associate Manager Salary
based on 6 salaries
₹6 L/yr - ₹11.1 L/yr
39% less than the average Associate Manager Salary in India
View more details

GVPR Engineers Associate Manager Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

5.0

Salary

4.2

Job security

3.4

Company culture

4.2

Promotions

3.4

Work satisfaction

Explore 2 Reviews and Ratings
Senior Engineer
230 salaries
unlock blur

₹3.6 L/yr - ₹9.1 L/yr

Engineer
156 salaries
unlock blur

₹2.4 L/yr - ₹7.5 L/yr

Civil Engineer
156 salaries
unlock blur

₹2.5 L/yr - ₹8 L/yr

Assistant Manager
150 salaries
unlock blur

₹4.6 L/yr - ₹11.1 L/yr

Store Executive
65 salaries
unlock blur

₹2.4 L/yr - ₹5.4 L/yr

Explore more salaries
Compare GVPR Engineers with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.3
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview