I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.
Hydro testing is a process of testing the integrity of pipelines by filling them with water and pressurizing them to ensure they can withstand the required pressure.
Pipelines are filled with water and pressurized to a specified pressure level.
Pressure is held for a specified duration to check for leaks or weaknesses.
Any leaks or weaknesses found are repaired before the pipeline is put into service.
Water pressure in a pipeline can vary depending on factors such as pipe diameter, flow rate, and elevation changes.
Water pressure is typically measured in pounds per square inch (PSI).
Factors affecting water pressure include pipe diameter, flow rate, elevation changes, and friction losses.
For example, a pipeline with a larger diameter will have lower water pressure compared to a pipeline with a smaller diameter at the ...
Special joints in MS pipes are used for specific purposes like connecting pipes of different materials or sizes.
Special joints include flanged joints, expansion joints, and mechanical couplings.
Flanged joints are used for connecting pipes to valves or other equipment.
Expansion joints allow for movement in the piping system due to temperature changes.
Mechanical couplings are used to connect pipes of different materials ...
The welding rod used depends on the type of metal being welded and the welding process being used.
Different welding rods are used for different types of metals such as steel, aluminum, and stainless steel.
The welding rod must be compatible with the welding process being used, such as stick welding, MIG welding, or TIG welding.
Common welding rods include E6010, E7018, ER4043, and ER308L.
DI Pepe water testing pressure is a crucial aspect of ensuring pipeline safety and efficiency.
DI Pepe water testing pressure refers to the process of measuring the pressure of water in the pipeline to ensure it is within safe operating limits.
This testing is essential for detecting any leaks, blockages, or other issues that could compromise the integrity of the pipeline.
Regular water testing pressure helps in maintaini...
DI Pepe length and Daya is a measurement used in pipeline construction to determine the distance between two points.
DI Pepe length is the distance between two pipeline joints, typically measured in meters or feet.
Daya is the depth at which the pipeline is buried underground, usually measured in meters.
Understanding DI Pepe length and Daya is crucial for ensuring proper installation and maintenance of pipelines.
A DI pipe push up joint is a type of joint used in ductile iron pipelines to connect two pipes together.
DI pipe push up joints are designed to allow for easy installation and maintenance of pipelines.
They typically consist of a rubber gasket that fits between the two pipe ends, creating a watertight seal.
The joint is then secured with bolts or clamps to ensure a secure connection.
DI pipe push up joints are commonly use...
Top trending discussions
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
Any condition given by CHP line
I believe in embracing new technology to improve efficiency and safety in coal transfer and maintenance work.
We should research and invest in the latest technology for coal transfer and maintenance work
Regular training and education for employees to ensure they are up-to-date with the latest technology
Collaborate with technology companies to develop customized solutions for our specific needs
Implement safety protocols ...
I applied via Campus Placement and was interviewed in Nov 2024. There were 3 interview rounds.
General English language and grammar, synonyms
I was asked about research advancement of my institute
Experienced professional with a background in retail management and a proven track record of driving sales and improving team performance.
Over 5 years of experience in retail management
Strong leadership skills with a focus on team development
Proven track record of exceeding sales targets
Excellent communication and problem-solving abilities
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 30 Nov 2023
I was interviewed before Nov 2022.
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Engineer
234
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
149
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company