Pipeline Engineer
10+ Pipeline Engineer Interview Questions and Answers
Q1. Draw a simple line chart for 10 km action plan with in 10 min ( including all safety precautions , procurement , manpower , equipment's , all )
A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.
Identify safety precautions needed for the project
Procure necessary equipment and manpower
Create a timeline for the project
Allocate resources efficiently
Ensure compliance with regulations and standards
Monitor progress and adjust plan as needed
Q2. calculate pup-piece length for - two section are already lowered and overlap 5m and s- bend rolling ,two 90 degree LR bends for 12 inch pipeline ?
To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.
Calculate the total length of the pipeline
Subtract the length of the two sections already lowered and overlap 5m
Add the length of the two 90 degree LR bends
Divide the result by 2 to get the length of each pup-piece
Pipeline Engineer Interview Questions and Answers for Freshers
Q3. how you calculate collapse and damage percentage for HDD crossings ?
Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.
Collapse percentage is calculated using the Mohr-Coulomb failure criterion
Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process
Factors such as soil type, borehole diameter, and drilling fluid properties also play a role in determining collapse ...read more
Q4. what is methodology for rock excavation and how to measure the quantity?
Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.
Drilling holes in rock using specialized equipment
Placing explosives in the holes and detonating them
Removing the debris using heavy machinery
Measuring the quantity of rock excavated by volume or weight
Using software to calculate the amount of explosives needed for a specific excavation project
Q5. What the min distance between pipeline and its trenches walls during construction as per standart ?
The minimum distance between a pipeline and its trench walls during construction is typically specified by industry standards.
The minimum distance is usually around 1 to 2 feet to allow for proper installation and backfilling of the pipeline.
This distance may vary depending on the size and material of the pipeline, as well as local regulations and soil conditions.
Maintaining the minimum distance helps prevent damage to the pipeline during construction and allows for proper in...read more
Q6. Do you know about pipeline and further work anywhere?
Yes, I have experience working on pipeline projects in the oil and gas industry.
I have worked on designing and implementing pipelines for oil and gas transportation.
I have experience in conducting pipeline inspections and maintenance.
I am familiar with pipeline regulations and safety standards.
I have worked with various pipeline materials such as steel, plastic, and composite.
I have collaborated with multidisciplinary teams on pipeline projects.
I have knowledge of pipeline pi...read more
Share interview questions and help millions of jobseekers 🌟
Q7. Pipeline wall thickness calculation methodology?
Pipeline wall thickness is calculated based on factors like internal pressure, external loads, material properties, and safety factors.
Calculate required wall thickness based on internal pressure using Barlow's formula
Consider external loads such as soil weight, traffic loads, and seismic forces
Take into account material properties like yield strength and corrosion allowance
Apply safety factors to ensure the pipeline can withstand unexpected conditions
Use industry standards a...read more
Q8. What is the gap between to pipeline
The gap between two pipelines refers to the distance or separation between them.
The gap between two pipelines is typically determined by safety regulations and engineering standards.
The gap is important to prevent interference between pipelines and ensure proper maintenance access.
For example, in offshore pipelines, the gap between them is usually around 20-30 meters to allow for safe operations.
Pipeline Engineer Jobs
Q9. What is the process of back feeling
Back filling is the process of refilling an excavated area with soil or other materials to restore the ground to its original level.
Back filling is done after the installation of pipelines to cover and protect them.
The process involves carefully placing and compacting the backfill material to prevent settling or damage to the pipeline.
Common backfill materials include sand, gravel, and crushed stone.
Back filling is an important step in the construction of pipelines to ensure ...read more
Q10. What is house keeping
Housekeeping refers to the management and organization of tasks related to maintaining cleanliness and order in a living or working space.
Housekeeping involves tasks such as cleaning, organizing, and tidying up living or working spaces.
It includes activities like dusting, vacuuming, mopping, and laundry.
Housekeeping also involves decluttering, arranging furniture, and maintaining overall cleanliness.
Good housekeeping practices are essential for creating a safe and healthy env...read more
Q11. What is process before laying
The process before laying a pipeline involves planning, surveying, obtaining permits, clearing the right of way, and preparing the trench.
Planning the route of the pipeline to ensure efficiency and safety
Surveying the land to identify any obstacles or potential issues
Obtaining necessary permits and approvals from relevant authorities
Clearing the right of way by removing any vegetation or structures in the path
Preparing the trench where the pipeline will be laid, including exc...read more
Q12. What is pipe laying
Pipe laying is the process of installing pipes underground or underwater for various purposes such as transportation of fluids or gases.
Pipe laying involves digging trenches or using specialized equipment to lay pipes in the ground.
Pipes can also be laid underwater using techniques such as horizontal directional drilling or pipe jacking.
The pipes are then connected together and tested for leaks before being put into service.
Examples of pipe laying projects include oil and gas...read more
Q13. Store experience
I have 5 years of experience working as a Pipeline Engineer in the oil and gas industry.
Designed and implemented pipeline systems for transporting oil and gas
Performed regular inspections and maintenance to ensure safety and efficiency
Collaborated with cross-functional teams to troubleshoot and resolve pipeline issues
Utilized software tools for pipeline design and analysis, such as AutoCAD and Pipeline Toolbox
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month