Round 1 - Technical 

(5 Questions)

  • Q1. What is pipe laying
  • Ans. 

    Pipe laying is the process of installing pipes underground or underwater for various purposes such as transportation of fluids or gases.

    • Pipe laying involves digging trenches or using specialized equipment to lay pipes in the ground.

    • Pipes can also be laid underwater using techniques such as horizontal directional drilling or pipe jacking.

    • The pipes are then connected together and tested for leaks before being put into se...

  • Answered by AI
  • Q2. What is process before laying
  • Ans. 

    The process before laying a pipeline involves planning, surveying, obtaining permits, clearing the right of way, and preparing the trench.

    • Planning the route of the pipeline to ensure efficiency and safety

    • Surveying the land to identify any obstacles or potential issues

    • Obtaining necessary permits and approvals from relevant authorities

    • Clearing the right of way by removing any vegetation or structures in the path

    • Preparing...

  • Answered by AI
  • Q3. What is the gap between to pipeline
  • Ans. 

    The gap between two pipelines refers to the distance or separation between them.

    • The gap between two pipelines is typically determined by safety regulations and engineering standards.

    • The gap is important to prevent interference between pipelines and ensure proper maintenance access.

    • For example, in offshore pipelines, the gap between them is usually around 20-30 meters to allow for safe operations.

  • Answered by AI
  • Q4. What is the process of back feeling
  • Ans. 

    Back filling is the process of refilling an excavated area with soil or other materials to restore the ground to its original level.

    • Back filling is done after the installation of pipelines to cover and protect them.

    • The process involves carefully placing and compacting the backfill material to prevent settling or damage to the pipeline.

    • Common backfill materials include sand, gravel, and crushed stone.

    • Back filling is an ...

  • Answered by AI
  • Q5. What is house keeping
  • Ans. 

    Housekeeping refers to the management and organization of tasks related to maintaining cleanliness and order in a living or working space.

    • Housekeeping involves tasks such as cleaning, organizing, and tidying up living or working spaces.

    • It includes activities like dusting, vacuuming, mopping, and laundry.

    • Housekeeping also involves decluttering, arranging furniture, and maintaining overall cleanliness.

    • Good housekeeping p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - We should redy for our work every time with full confidence

Interview questions from similar companies

Interview Questionnaire 

3 Questions

  • Q1. What is android architecture stack?
  • Q2. What is AIDL?
  • Ans. 

    AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.

    • AIDL is used to define the interface between client and service in Android.

    • It allows communication between different processes in Android.

    • AIDL is used to pass complex data types between processes.

    • AIDL is similar to Remote Procedure Call (RPC) in other programming languages.

    • Example: AIDL is used in Android to implement...

  • Answered by AI
  • Q3. What is hash set and hash map
  • Ans. 

    Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.

    • Hash set stores unique values without any specific order.

    • Hash map stores key-value pairs and allows fast retrieval of values based on keys.

    • Both use hashing to map keys to their corresponding values.

    • In Java, HashSet and HashMap are implementations of these data structures.

  • Answered by AI

Skills evaluated in this interview

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Question about material reconciliation, allowable wastage question based on previous work experience
  • Q2. It's not easy to describe it in a few words because of the interview time is more

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare point base answer what u have done in ur present service and what u r going to offer them by considering a technical aspects

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous experience, and my scope of work?
  • Q2. Areas of strengths and areas need to develop

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview consisting of two rounds, first is about my personal details, which is intervied by Hr person. the second round is technical one, which was taken by Project director of the particular project. So i advice everyone be confident what you answering them, all the questions were asked about my experience part, and the knowledge what i have gained during the work apart from my education life. They also check all my documents. After completion of my interview and after 1 month, i got the offer letter of this company. Now iam so happy for this achievement. I hope all of the others who were attending for the interviews, hope you all get placed.

Thanks and Regards
Rahman

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About the background

Interview Preparation Tips

Interview preparation tips for other job seekers - Please have good job knowledge
Round 1 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - What you know told boldly and answer with smile

I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Salary discussion and some professional questions.
  • Q2. Technical realated your stream

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T is good organization for learning and self growth purpose.good employee welfare.

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Pipeline Engineer interview?
L&T Construction interview process usually has 1 rounds. The most common rounds in the L&T Construction interview process are Technical.
What are the top questions asked in L&T Construction Pipeline Engineer interview?

Some of the top questions asked at the L&T Construction Pipeline Engineer interview -

  1. What is the gap between to pipel...read more
  2. What is the process of back feel...read more
  3. What is process before lay...read more

Tell us how to improve this page.

L&T Construction Pipeline Engineer Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

Dilip Buildcon Interview Questions
4.0
 • 149 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 66 Interviews
View all
L&T Construction Pipeline Engineer Salary
based on 5 salaries
₹1.8 L/yr - ₹3 L/yr
61% less than the average Pipeline Engineer Salary in India
View more details

L&T Construction Pipeline Engineer Reviews and Ratings

based on 3 reviews

2.9/5

Rating in categories

3.9

Skill development

3.4

Work-life balance

2.0

Salary

2.4

Job security

2.4

Company culture

3.4

Promotions

4.4

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
703 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
489 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
469 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
327 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview