Upload Button Icon Add office photos

Filter interviews by

GVPR Engineers Interview Questions, Process, and Tips

Updated 2 Jan 2025

Top GVPR Engineers Interview Questions and Answers

View all 38 questions

GVPR Engineers Interview Experiences

Popular Designations

56 interviews found

Interview Questionnaire 

3 Questions

  • Q1. How to recognise a bridge as like major, minor, normal
  • Ans. 

    Bridges can be classified as major, minor or normal based on their importance and traffic volume.

    • Major bridges are those that connect important cities or regions and have high traffic volume.

    • Minor bridges are those that connect smaller towns or villages and have lower traffic volume.

    • Normal bridges are those that fall in between major and minor bridges in terms of importance and traffic volume.

    • Factors such as length, wi...

  • Answered by AI
  • Q2. What is the difference between pier and abutment
  • Ans. 

    Pier is a vertical structure that supports the weight of a bridge, while abutment is a horizontal structure that supports the ends of a bridge.

    • Pier is a vertical structure that supports the weight of a bridge, while abutment is a horizontal structure that supports the ends of a bridge.

    • Piers are usually located in the middle of a bridge, while abutments are located at the ends of a bridge.

    • Piers are typically made of con...

  • Answered by AI
  • Q3. How to find out CA of river,nalla,local nalla
  • Ans. 

    CA of river, nalla, local nalla can be found by studying the catchment area and rainfall data.

    • Study the catchment area of the river, nalla, or local nalla

    • Collect rainfall data of the area

    • Calculate the runoff coefficient using the catchment area and rainfall data

    • Multiply the runoff coefficient with the total rainfall to get the CA

    • CA = Runoff Coefficient x Total Rainfall

    • CA is important for designing drainage systems and

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You can contact me by mail @ WhatsApp chat

Project Engineer - Civil Interview Questions asked at other Companies

Q1. 15 days Program sheet for Steel qty of 850 sqft, slab area, 60 columns of size 600×300 mm and 3.0 m height, 30 Mt steel & Steel shuttering.
View answer (2)

Accounts Manager Interview Questions & Answers

user image CHANDRA SEKHARA RAO N

posted on 8 Mar 2022

Round 1 - One-on-one 

(2 Questions)

  • Q1. Subject quetions only
  • Q2. Accounting gst tally
Round 2 - Assignment 

Subject

Accounts Manager Interview Questions asked at other Companies

Q1. Tell me an analysis about how to factor customer or prospects for your product segment
View answer (5)

I applied via Walk-in and was interviewed in Dec 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Material Reconciliations related

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good experience in Water division

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)

I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Tell about to technical knowledge
  • Q2. How mainten safety and quality in project site
  • Ans. 

    Safety and quality in project site are maintained through strict adherence to protocols and standards.

    • Establishing clear safety and quality guidelines

    • Providing regular training to workers on safety and quality protocols

    • Conducting regular inspections and audits to ensure compliance

    • Using appropriate safety equipment and tools

    • Encouraging workers to report any safety or quality concerns

    • Taking immediate action to address an...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was normal .tell to everything in pipe line activites in clearly

Deputy Project Manager Interview Questions asked at other Companies

Q1. If contractors not compliance spec. Then what do you want or take action against.
View answer (2)

GVPR Engineers interview questions for popular designations

 Mechanical Engineer

 (4)

 Assistant Manager

 (3)

 Civil Engineer

 (3)

 Deputy Manager

 (3)

 Senior Engineer

 (3)

 Accounts Manager

 (2)

 Associate Manager

 (2)

 Procurement Engineer

 (2)

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Store management process
  • Ans. 

    Store management process involves planning, organizing, directing and controlling all activities in a retail store.

    • Planning involves setting goals, objectives, and strategies for the store.

    • Organizing involves arranging resources such as staff, inventory, and equipment to achieve the goals.

    • Directing involves leading and motivating staff to achieve the goals.

    • Controlling involves monitoring and evaluating performance to e...

  • Answered by AI
  • Q2. Inventory process of Material
  • Ans. 

    Inventory process involves tracking and managing the flow of materials in and out of the store.

    • Establishing inventory levels and reorder points

    • Conducting regular physical counts and reconciling with system records

    • Identifying slow-moving or obsolete items and taking appropriate action

    • Ensuring proper storage and handling of materials

    • Collaborating with purchasing and sales teams to optimize inventory levels

    • Utilizing inven

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing hard, just process of normal interview, genaral questions asked, no need to prepare heavy

Assistant Store Manager Interview Questions asked at other Companies

Q1. 2. What about kpi' importance in retail
View answer (37)

Get interview-ready with Top GVPR Engineers Interview Questions

Safety Executive Interview Questions & Answers

user image D Kartheek Reddy

posted on 29 Jan 2022

I applied via Naukri.com and was interviewed in Dec 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Explain about Company

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview was very tough

Safety Executive Interview Questions asked at other Companies

Q1. How you will control the hazards of casting industry?
View answer (2)

Jobs at GVPR Engineers

View all
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. P2P process and complete cycle
  • Q2. Business cycle of the procurement
  • Ans. 

    The business cycle of procurement involves identifying needs, sourcing suppliers, negotiating contracts, placing orders, receiving goods/services, and evaluating performance.

    • Identifying needs: Assessing what goods/services are required and in what quantity.

    • Sourcing suppliers: Researching potential suppliers, obtaining quotes, and evaluating capabilities.

    • Negotiating contracts: Discussing terms and conditions, pricing, a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Think twice

Mechanical Procurement Engineer Interview Questions asked at other Companies

Q1. Business cycle of the procurement
View answer (1)

I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. 1) How many years of experience you have?
  • Q2. 2) What is your expected salary?
  • Q3. 3) what is your qualification?
  • Q4. 3) Diploma in Civil & ITI in Survey

Interview Preparation Tips

Interview preparation tips for other job seekers - NIL.........................................................................................................

Senior Surveyor Interview Questions asked at other Companies

Q1. What is the difference of true north and magnetic north ?
View answer (1)
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed before Jan 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Can you operate a computer?
  • Ans. 

    Yes, I can operate a computer proficiently.

    • I am comfortable using various operating systems such as Windows and Mac OS.

    • I have experience using Microsoft Office Suite and other software programs.

    • I am able to troubleshoot basic computer issues and perform routine maintenance.

    • I am familiar with using the internet and email for communication and research.

    • I am willing to learn new software and technologies as needed.

  • Answered by AI
  • Q2. Can you drive the weight fork of the vehicle?
  • Ans. 

    Yes, I am trained and experienced in driving the weight fork of the vehicle.

    • I have received proper training and certification to operate the weight fork

    • I have experience in driving the weight fork and have a good understanding of safety protocols

    • I am familiar with different types of weight forks and can operate them efficiently

    • Examples: I have operated weight forks for trucks, forklifts, and other heavy machinery

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't stop, keep trying, sometimes you will succeed.

Weigh Bridge Operator Interview Questions asked at other Companies

Q1. Total weight of objects. (here vehicle with included material)
View answer (3)

Interview Questionnaire 

3 Questions

  • Q1. Design mix m25
  • Ans. 

    Design mix M25 is a concrete mix with a compressive strength of 25 MPa after 28 days.

    • M25 mix consists of 1 part cement, 1 part coarse aggregates, and 2 parts fine aggregates.

    • Water-cement ratio should be maintained at 0.5 for M25 mix.

    • M25 mix is commonly used in construction of buildings, bridges, and roads.

    • The mix should be properly cured for at least 28 days to achieve the desired strength.

  • Answered by AI
  • Q2. Site execution practically
  • Q3. Mivan shuttering

Interview Preparation Tips

Interview preparation tips for other job seekers - Practice site execution method's

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (64)

GVPR Engineers Interview FAQs

How many rounds are there in GVPR Engineers interview?
GVPR Engineers interview process usually has 2-3 rounds. The most common rounds in the GVPR Engineers interview process are Technical, HR and Resume Shortlist.
How to prepare for GVPR Engineers interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at GVPR Engineers. The most common topics and skills that interviewers at GVPR Engineers expect are WTP, Water Supply, Billing, Planning and QS.
What are the top questions asked in GVPR Engineers interview?

Some of the top questions asked at the GVPR Engineers interview -

  1. How can u calculate quantities for estimations as per component wise like BBS, ...read more
  2. Can you drive the weight fork of the vehic...read more
  3. Risk assessment, what is the importance of HSE Policy and implementati...read more
How long is the GVPR Engineers interview process?

The duration of GVPR Engineers interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

GVPR Engineers Interview Process

based on 10 interviews in last 1 year

Interview experience

4
  
Good

People are getting interviews through

based on 30 GVPR Engineers interviews
WalkIn
Job Portal
Company Website
Referral
Campus Placement
57%
17%
10%
10%
3%
3% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 684 Interviews
Tata Projects Interview Questions
4.3
 • 397 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Essar Group Interview Questions
3.8
 • 28 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

GVPR Engineers Reviews and Ratings

based on 741 reviews

3.8/5

Rating in categories

3.4

Skill development

3.7

Work-Life balance

3.6

Salary & Benefits

3.5

Job Security

3.4

Company culture

3.3

Promotions/Appraisal

3.5

Work Satisfaction

Explore 741 Reviews and Ratings
Manager

Hyderabad / Secunderabad

10-17 Yrs

Not Disclosed

JE/AE/SE/DPM/PM

Hyderabad / Secunderabad,

Ahmedabad

+1

3-8 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
217 salaries
unlock blur

₹3.6 L/yr - ₹9.1 L/yr

Civil Engineer
162 salaries
unlock blur

₹2.5 L/yr - ₹8 L/yr

Engineer
153 salaries
unlock blur

₹2 L/yr - ₹7.2 L/yr

Assistant Manager
142 salaries
unlock blur

₹3.8 L/yr - ₹12 L/yr

Mechanical Engineer
66 salaries
unlock blur

₹2.8 L/yr - ₹6 L/yr

Explore more salaries
Compare GVPR Engineers with

L&T Construction

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview