Filter interviews by
I applied via Walk-in
About work location and welfare facilities of on site
Work location and work activity finding the unsafe conditions and Acts.
I applied via Walk-in and was interviewed before Dec 2021. There was 1 interview round.
Bridges can be classified as major, minor or normal based on their importance and traffic volume.
Major bridges are those that connect important cities or regions and have high traffic volume.
Minor bridges are those that connect smaller towns or villages and have lower traffic volume.
Normal bridges are those that fall in between major and minor bridges in terms of importance and traffic volume.
Factors such as length, wi...
Pier is a vertical structure that supports the weight of a bridge, while abutment is a horizontal structure that supports the ends of a bridge.
Pier is a vertical structure that supports the weight of a bridge, while abutment is a horizontal structure that supports the ends of a bridge.
Piers are usually located in the middle of a bridge, while abutments are located at the ends of a bridge.
Piers are typically made of con...
CA of river, nalla, local nalla can be found by studying the catchment area and rainfall data.
Study the catchment area of the river, nalla, or local nalla
Collect rainfall data of the area
Calculate the runoff coefficient using the catchment area and rainfall data
Multiply the runoff coefficient with the total rainfall to get the CA
CA = Runoff Coefficient x Total Rainfall
CA is important for designing drainage systems and
GVPR Engineers interview questions for popular designations
Subject
Get interview-ready with Top GVPR Engineers Interview Questions
I applied via Walk-in and was interviewed in Dec 2021. There were 5 interview rounds.
I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.
Safety and quality in project site are maintained through strict adherence to protocols and standards.
Establishing clear safety and quality guidelines
Providing regular training to workers on safety and quality protocols
Conducting regular inspections and audits to ensure compliance
Using appropriate safety equipment and tools
Encouraging workers to report any safety or quality concerns
Taking immediate action to address an...
I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.
Store management process involves planning, organizing, directing and controlling all activities in a retail store.
Planning involves setting goals, objectives, and strategies for the store.
Organizing involves arranging resources such as staff, inventory, and equipment to achieve the goals.
Directing involves leading and motivating staff to achieve the goals.
Controlling involves monitoring and evaluating performance to e...
Inventory process involves tracking and managing the flow of materials in and out of the store.
Establishing inventory levels and reorder points
Conducting regular physical counts and reconciling with system records
Identifying slow-moving or obsolete items and taking appropriate action
Ensuring proper storage and handling of materials
Collaborating with purchasing and sales teams to optimize inventory levels
Utilizing inven
I applied via Naukri.com and was interviewed in Dec 2021. There were 4 interview rounds.
The business cycle of procurement involves identifying needs, sourcing suppliers, negotiating contracts, placing orders, receiving goods/services, and evaluating performance.
Identifying needs: Assessing what goods/services are required and in what quantity.
Sourcing suppliers: Researching potential suppliers, obtaining quotes, and evaluating capabilities.
Negotiating contracts: Discussing terms and conditions, pricing, a...
Top trending discussions
The duration of GVPR Engineers interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 58 interviews
Interview experience
based on 782 reviews
Rating in categories
Senior Engineer
234
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
148
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company