Top L&T Construction Assistant Manager Interview Questions and Answers

  • Q1. How much sqm plastering done by Mason per day, concrete blocks sizes, workability, painting, gypsum work
  • Q2. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Q3. What is the process of developing an erection plan?
View all 12 questions

L&T Construction Assistant Manager Interview Experiences

14 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Your previous experience
  • Q2. Describe about yourself
  • Q3. Asked about my management skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be confident on, what you have done in your previous job.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Related to field and years of experience
  • Q2. Salary,expectations,company requirements and commitment to work
  • Q3. They test your patience and response capability
Round 3 - Technical 

(2 Questions)

  • Q1. Cable laying and jointing knowledge
  • Q2. Related to field inspection and site acceptance

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in advance irrespective of field too,they make ask different questions to check your capable to give better position other than applied.

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Salary negotiation
  • Q2. Job specific questions
  • Q3. Job specific questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give to the point answers. Most of the questions will be from your expertise only.

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

L&T Construction interview questions for designations

 Assistant Store Manager

 (1)

 Assistant Manager Operations

 (1)

 Assistant Manager/Manager -(Technical)

 (1)

 Assistant Construction Manager

 (10)

 Assistant Manager - EHS

 (3)

 Assistant Engineering Manager

 (3)

 Assistant Manager Civil

 (2)

 Assistant Manager Environment

 (1)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Assistant Manager interview?
L&T Construction interview process usually has 1-2 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction Assistant Manager interview?

Some of the top questions asked at the L&T Construction Assistant Manager interview -

  1. How much sqm plastering done by Mason per day, concrete blocks sizes, workabili...read more
  2. Elaborate VT pump installation process step by step.. How many valves & types u...read more
  3. What is the process of developing an erection pl...read more

Tell us how to improve this page.

L&T Construction Assistant Manager Interview Process

based on 24 interviews

2 Interview rounds

  • Resume Shortlist Round
  • Technical Round
View more
L&T Construction Assistant Manager Salary
based on 1.1k salaries
₹6 L/yr - ₹18.2 L/yr
35% more than the average Assistant Manager Salary in India
View more details

L&T Construction Assistant Manager Reviews and Ratings

based on 301 reviews

3.8/5

Rating in categories

3.8

Skill development

2.9

Work-life balance

3.7

Salary

4.2

Job security

3.3

Company culture

3.3

Promotions

3.3

Work satisfaction

Explore 301 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
323 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview