Embankment is a raised bank or wall built to carry a road or to hold back water.
Embankment is a raised structure made of earth or other materials to support a road or railway.
Earthwork process involves moving, processing, and placing soil or rock to create embankments, excavations, or other earth structures.
Embankments are commonly used in road construction to elevate the road above the surrounding terrain.
Earthwork pr...
PQC laying stands for Pavement Quality Concrete laying, which is the final layer of concrete pavement on roads.
PQC laying is the process of laying the final layer of concrete pavement on roads.
It is done after the base and sub-base layers have been prepared and compacted.
PQC laying ensures a smooth and durable surface for vehicles to travel on.
Proper curing of PQC is essential to prevent cracks and ensure longevity.
Exa...
RCC drain is a reinforced concrete drain used for efficient drainage of rainwater or wastewater.
RCC drain is made of reinforced concrete to provide strength and durability.
It is used to efficiently channel rainwater or wastewater away from roads, buildings, or other structures.
RCC drains come in various shapes and sizes depending on the specific drainage requirements.
These drains are commonly used in urban areas to pre...
Kerb laying is the process of installing and positioning curbs along the edges of roads or pavements.
Kerb laying involves setting out the alignment and levels for the curbs.
The curbs are then placed and fixed in position using concrete or other suitable materials.
Kerb laying helps define the edges of roads, provide structural support, and prevent vehicles from driving off the road.
Properly laid curbs enhance the overal...
Kerb painting and road marking are techniques used to designate specific areas on roads for various purposes.
Kerb painting involves painting the edges of the road, usually in a specific color, to indicate parking restrictions, loading zones, or pedestrian crossings.
Road marking includes painting lines, symbols, and signs on the road surface to guide traffic, indicate lanes, show pedestrian crossings, and warn of hazard...
Top trending discussions
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
posted on 13 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
Billing codes are determined by the organization and industry standards.
Billing codes are used to identify specific products or services provided by an organization.
The codes are typically determined by the organization and may also follow industry standards.
Examples of billing codes include CPT codes for medical procedures and UPC codes for retail products.
based on 1 interview
Interview experience
Engineer
198
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
147
salaries
| ₹3.5 L/yr - ₹10 L/yr |
Store Keeper
78
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Site Engineer
76
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Civil Engineer
72
salaries
| ₹2.1 L/yr - ₹6 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
AtkinsRealis