I was interviewed in Sep 2024.
NATM stands for New Austrian Tunneling Method, a construction method for tunnels.
NATM is a tunneling method that involves excavating the tunnel while providing support using rock bolts, shotcrete, and steel ribs.
It is a flexible and adaptable method that allows for adjustments during construction based on the geological conditions encountered.
NATM is commonly used in soft ground conditions where traditional tunneling m...
Standup time refers to the time it takes for concrete to set and gain enough strength to support itself. Tunnel supports are structures used to stabilize the tunnel walls and roof.
Standup time is crucial for ensuring the stability of the tunnel during construction.
Tunnel supports can include rock bolts, shotcrete, steel ribs, and lattice girders.
The type of tunnel support used depends on the geology of the surrounding ...
Blast details include powder factor and quantity of explosives used.
Powder factor is the amount of explosives used per unit volume of rock to be blasted
Quantity of explosives used is typically measured in kilograms or pounds
Blast details are crucial for ensuring safe and efficient tunnel excavation
Cycle time is the total time taken to complete a task or process from start to finish.
Cycle time includes all the time spent on actual work as well as any waiting time or delays.
It is an important metric in project management to assess efficiency and productivity.
For tunnel engineering, cycle time could refer to the time taken to complete a specific phase of tunnel construction, such as excavation or lining installatio
I applied via Whatsaap group and was interviewed in Aug 2023. There were 3 interview rounds.
Powder factor is a measure of the amount of explosive used per unit volume of rock in tunneling operations.
Powder factor is calculated by dividing the weight of explosives used by the volume of rock being blasted.
It is typically expressed in units of kilograms or pounds of explosives per cubic meter or cubic yard of rock.
A higher powder factor indicates a greater amount of explosives used, which can result in more effi...
RMR value stands for Rock Mass Rating value, which is a geotechnical classification system used to assess the quality of rock masses.
RMR value is used in tunnel engineering to evaluate the stability and support requirements of rock masses.
It takes into account various parameters such as rock strength, joint conditions, groundwater conditions, and orientation of discontinuities.
RMR values range from 0 to 100, with highe...
Pullout test is a method to determine the bond strength between concrete and reinforcement in a structure.
Pullout test involves applying a tensile force to a steel bar embedded in concrete to measure the force required to pull it out.
It is used to assess the quality of concrete and the effectiveness of reinforcement in a structure.
The test helps in evaluating the bond strength between concrete and reinforcement, which ...
I applied via Approached by Company and was interviewed before Oct 2022. There were 4 interview rounds.
Cycle time of advancement refers to the time taken for the tunnel boring machine to progress a certain distance.
Cycle time can vary depending on factors such as geology, machine efficiency, and crew experience.
For example, a tunnel boring machine may advance 10-15 meters per day in stable rock conditions.
However, in more challenging ground conditions, the cycle time may be slower due to the need for additional support ...
Top trending discussions
posted on 30 Nov 2023
I was interviewed before Nov 2022.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.
posted on 18 Nov 2020
Android architecture stack is a set of layers that make up the Android operating system.
The stack includes four main layers: Linux kernel, native libraries, Android runtime, and application framework.
The Linux kernel provides low-level system functionality.
Native libraries are written in C or C++ and provide access to hardware-specific features.
The Android runtime includes the Dalvik virtual machine and core libraries.
...
AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.
AIDL is used to define the interface between client and service in Android.
It allows communication between different processes in Android.
AIDL is used to pass complex data types between processes.
AIDL is similar to Remote Procedure Call (RPC) in other programming languages.
Example: AIDL is used in Android to implement...
Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.
Hash set stores unique values without any specific order.
Hash map stores key-value pairs and allows fast retrieval of values based on keys.
Both use hashing to map keys to their corresponding values.
In Java, HashSet and HashMap are implementations of these data structures.
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 12 May 2018
based on 3 interviews
Interview experience
based on 11 reviews
Rating in categories
Engineer
898
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
878
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
501
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
412
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
345
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company