Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Megha Engineering & Infrastructures Tunnel Engineer Interview Questions, Process, and Tips

Updated 26 Oct 2024

Top Megha Engineering & Infrastructures Tunnel Engineer Interview Questions and Answers

View all 8 questions

Megha Engineering & Infrastructures Tunnel Engineer Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Sep 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Description for Tunnel NATM
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a construction method for tunnels.

    • NATM is a tunneling method that involves excavating the tunnel while providing support using rock bolts, shotcrete, and steel ribs.

    • It is a flexible and adaptable method that allows for adjustments during construction based on the geological conditions encountered.

    • NATM is commonly used in soft ground conditions where traditional tunneling m...

  • Answered by AI
  • Q2. Description for Standup time and Tunnel Supports
  • Ans. 

    Standup time refers to the time it takes for concrete to set and gain enough strength to support itself. Tunnel supports are structures used to stabilize the tunnel walls and roof.

    • Standup time is crucial for ensuring the stability of the tunnel during construction.

    • Tunnel supports can include rock bolts, shotcrete, steel ribs, and lattice girders.

    • The type of tunnel support used depends on the geology of the surrounding ...

  • Answered by AI
  • Q3. Describe the blast details with powder factor and quantity
  • Ans. 

    Blast details include powder factor and quantity of explosives used.

    • Powder factor is the amount of explosives used per unit volume of rock to be blasted

    • Quantity of explosives used is typically measured in kilograms or pounds

    • Blast details are crucial for ensuring safe and efficient tunnel excavation

  • Answered by AI
  • Q4. Describe the Cycle time
  • Ans. 

    Cycle time is the total time taken to complete a task or process from start to finish.

    • Cycle time includes all the time spent on actual work as well as any waiting time or delays.

    • It is an important metric in project management to assess efficiency and productivity.

    • For tunnel engineering, cycle time could refer to the time taken to complete a specific phase of tunnel construction, such as excavation or lining installatio

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary expecting
  • Q2. What you specially do for company

Tunnel Engineer Interview Questions & Answers

user image Ashiq Hussain Bhat

posted on 14 Feb 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Whatsaap group and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous company
  • Q2. Why you want to leave
  • Ans. Because of work nearer to Complete
  • Answered by Ashiq Hussain Bhat
Round 2 - Technical 

(3 Questions)

  • Q1. What was my previous position
  • Q2. What is powder factor
  • Ans. 

    Powder factor is a measure of the amount of explosive used per unit volume of rock in tunneling operations.

    • Powder factor is calculated by dividing the weight of explosives used by the volume of rock being blasted.

    • It is typically expressed in units of kilograms or pounds of explosives per cubic meter or cubic yard of rock.

    • A higher powder factor indicates a greater amount of explosives used, which can result in more effi...

  • Answered by AI
  • Q3. What is RMR value
  • Ans. 

    RMR value stands for Rock Mass Rating value, which is a geotechnical classification system used to assess the quality of rock masses.

    • RMR value is used in tunnel engineering to evaluate the stability and support requirements of rock masses.

    • It takes into account various parameters such as rock strength, joint conditions, groundwater conditions, and orientation of discontinuities.

    • RMR values range from 0 to 100, with highe...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. What is pullout test and where it is used
  • Ans. 

    Pullout test is a method to determine the bond strength between concrete and reinforcement in a structure.

    • Pullout test involves applying a tensile force to a steel bar embedded in concrete to measure the force required to pull it out.

    • It is used to assess the quality of concrete and the effectiveness of reinforcement in a structure.

    • The test helps in evaluating the bond strength between concrete and reinforcement, which ...

  • Answered by AI
  • Q2. How much load you have to given in pullout test in SN rockbolt of size 32mm

Interview Preparation Tips

Interview preparation tips for other job seekers - Gain knowledge be strong

Tunnel Engineer Interview Questions Asked at Other Companies

asked in Geodata
Q1. What information is required when designing tunnel projects
Q2. What should be the necessary document for Bill?, how do you justi ... read more
Q3. What is pullout test and where it is used
Q4. Describe the blast details with powder factor and quantity
Q5. Description for Standup time and Tunnel Supports
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. About work experience and salary expectations
Round 3 - Technical 

(3 Questions)

  • Q1. About technical terms of Tunnel construction. and previous employment exp based questions
  • Q2. Cycle time of advancement
  • Ans. 

    Cycle time of advancement refers to the time taken for the tunnel boring machine to progress a certain distance.

    • Cycle time can vary depending on factors such as geology, machine efficiency, and crew experience.

    • For example, a tunnel boring machine may advance 10-15 meters per day in stable rock conditions.

    • However, in more challenging ground conditions, the cycle time may be slower due to the need for additional support ...

  • Answered by AI
  • Q3. About rock support and dealing with cavity
Round 4 - HR 

(1 Question)

  • Q1. Joining date and salary negotiation

Interview Preparation Tips

Topics to prepare for Megha Engineering & Infrastructures Tunnel Engineer interview:
  • Tunnel construction
Interview preparation tips for other job seekers - Do not agree with HR terms like 3 months Notice period and deductions in salary bcz thats bad in the last when you were leaving tham.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing

Interview Questionnaire 

3 Questions

  • Q1. What is android architecture stack?
  • Ans. 

    Android architecture stack is a set of layers that make up the Android operating system.

    • The stack includes four main layers: Linux kernel, native libraries, Android runtime, and application framework.

    • The Linux kernel provides low-level system functionality.

    • Native libraries are written in C or C++ and provide access to hardware-specific features.

    • The Android runtime includes the Dalvik virtual machine and core libraries.

    • ...

  • Answered by AI
  • Q2. What is AIDL?
  • Ans. 

    AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.

    • AIDL is used to define the interface between client and service in Android.

    • It allows communication between different processes in Android.

    • AIDL is used to pass complex data types between processes.

    • AIDL is similar to Remote Procedure Call (RPC) in other programming languages.

    • Example: AIDL is used in Android to implement...

  • Answered by AI
  • Q3. What is hash set and hash map
  • Ans. 

    Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.

    • Hash set stores unique values without any specific order.

    • Hash map stores key-value pairs and allows fast retrieval of values based on keys.

    • Both use hashing to map keys to their corresponding values.

    • In Java, HashSet and HashMap are implementations of these data structures.

  • Answered by AI

Skills evaluated in this interview

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Contribute & help others!
anonymous
You can choose to be anonymous

Megha Engineering & Infrastructures Interview FAQs

How many rounds are there in Megha Engineering & Infrastructures Tunnel Engineer interview?
Megha Engineering & Infrastructures interview process usually has 3 rounds. The most common rounds in the Megha Engineering & Infrastructures interview process are HR, Technical and Resume Shortlist.
What are the top questions asked in Megha Engineering & Infrastructures Tunnel Engineer interview?

Some of the top questions asked at the Megha Engineering & Infrastructures Tunnel Engineer interview -

  1. What is pullout test and where it is u...read more
  2. Describe the blast details with powder factor and quant...read more
  3. Description for Standup time and Tunnel Suppo...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

REVIEWS

Megha Engineering & Infrastructures

No Reviews

REVIEWS

Megha Engineering & Infrastructures

No Reviews

INTERVIEWS

Megha Engineering & Infrastructures

No Interviews

INTERVIEWS

Virtusa Consulting Services

No Interviews

INTERVIEWS

Megha Engineering & Infrastructures

No Interviews

INTERVIEWS

Virtusa Consulting Services

No Interviews

INTERVIEWS

Megha Engineering & Infrastructures

No Interviews

INTERVIEWS

Virtusa Consulting Services

No Interviews

Tell us how to improve this page.

Megha Engineering & Infrastructures Tunnel Engineer Interview Process

based on 3 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 424 Interviews
Tata Technologies Interview Questions
3.6
 • 254 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Worley Interview Questions
4.1
 • 109 Interviews
View all
Megha Engineering & Infrastructures Tunnel Engineer Salary
based on 58 salaries
₹4 L/yr - ₹9 L/yr
32% less than the average Tunnel Engineer Salary in India
View more details

Megha Engineering & Infrastructures Tunnel Engineer Reviews and Ratings

based on 11 reviews

3.9/5

Rating in categories

3.6

Skill development

3.3

Work-life balance

3.6

Salary

4.1

Job security

3.7

Company culture

2.7

Promotions

3.8

Work satisfaction

Explore 11 Reviews and Ratings
Engineer
898 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
878 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Associate Manager
501 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
412 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
345 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Megha Engineering & Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent