Filter interviews by
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
Various information such as geological conditions, water table levels, traffic volume, and project budget are required when designing tunnel projects.
Geological conditions of the area where the tunnel will be constructed
Water table levels to determine potential water ingress
Traffic volume to design the tunnel size and ventilation system
Project budget to ensure feasibility and cost-effectiveness
Environmental impact asse
I applied via LinkedIn and was interviewed in Jul 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To conduct a slump test, fill a metal cone with concrete, compact it, remove the cone, and measure the slump.
Clean the cone and moisten it with water.
Fill the cone with concrete in three layers, compacting each layer with a rod.
Remove the cone and place it next to the slump.
Measure the difference in height between the top of the cone and the highest point of the slump.
Repeat the test at least twice and take the average
Minimum cement content for M25 Grade is 300 kg/m³.
M25 grade concrete has a minimum compressive strength of 25 MPa.
The water-cement ratio should not exceed 0.50.
The cement content can vary based on factors such as aggregate size, shape, and grading.
The cement content should be adjusted based on the results of trial mixes.
I expect a competitive salary based on industry standards and my experience.
I have researched the industry standards for QA QC Engineer salaries
I have taken into account my experience and skills
I am open to negotiation based on the specific job responsibilities and benefits package
I am looking for a fair and competitive salary that reflects my value to the company
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
Salary discusses boss and hr
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Tunnel Engineer
13
salaries
| ₹8.6 L/yr - ₹10.5 L/yr |
CAD Engg
9
salaries
| ₹4.3 L/yr - ₹6.9 L/yr |
Geologist
7
salaries
| ₹6.8 L/yr - ₹14 L/yr |
Junior Engineer
6
salaries
| ₹2.5 L/yr - ₹2.8 L/yr |
Cadd Engineer
5
salaries
| ₹3.6 L/yr - ₹5.3 L/yr |
Bahwan Engineering
Eversendai
Descon Engineering
GS Engineering & Construction