Upload Button Icon Add office photos

Filter interviews by

Geodata Tunnel Engineer Interview Questions and Answers

Updated 25 May 2023

Geodata Tunnel Engineer Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Supervisor of Tunnel NATM work as per technical specifications and approved drawings
  • Q2. What tunnel engineering projects have you completed in your previous job
  • Q3. How would you ensure a project stays with in budget and on time
  • Q4. What information is required when designing tunnel projects
  • Ans. 

    Various information such as geological conditions, water table levels, traffic volume, and project budget are required when designing tunnel projects.

    • Geological conditions of the area where the tunnel will be constructed

    • Water table levels to determine potential water ingress

    • Traffic volume to design the tunnel size and ventilation system

    • Project budget to ensure feasibility and cost-effectiveness

    • Environmental impact asse

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Can you tell us about the teams you have led on project
  • Q2. Give us an example of a process you have improved. How did this improvement benefit the company

Interview Preparation Tips

Topics to prepare for Geodata Tunnel Engineer interview:
  • Tunnel
  • Project Management
  • Quality Control
  • Tunnel inspection
  • Safty inspection
  • montitoring time cycles
Interview preparation tips for other job seekers - 1) Identify you career goals
2) 0ptimize your LinkedIn profile
3) be honest
4) mind your attitude
5) maintain good body language
6) follow up after the interview

I applied via LinkedIn and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. The question asked were in relation to my experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Shared my onfileld knowledge and exposure of new technologies used.

Tunnel Engineer Interview Questions Asked at Other Companies

asked in Geodata
Q1. What information is required when designing tunnel projects
Q2. What should be the necessary document for Bill?, how do you justi ... read more
Q3. What is pullout test and where it is used
Q4. Describe the blast details with powder factor and quantity
Q5. Description for Standup time and Tunnel Supports

Interview questions from similar companies

I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to department

Interview Preparation Tips

Topics to prepare for Hyundai Engineering Civil Engineer interview:
  • Related to experience
Interview preparation tips for other job seekers - Please prepare professional cv related to work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How will conduct a slump test?
  • Ans. 

    To conduct a slump test, fill a metal cone with concrete, compact it, remove the cone, and measure the slump.

    • Clean the cone and moisten it with water.

    • Fill the cone with concrete in three layers, compacting each layer with a rod.

    • Remove the cone and place it next to the slump.

    • Measure the difference in height between the top of the cone and the highest point of the slump.

    • Repeat the test at least twice and take the average

  • Answered by AI
  • Q2. Minimum cement content for M25 Grade?
  • Ans. 

    Minimum cement content for M25 Grade is 300 kg/m³.

    • M25 grade concrete has a minimum compressive strength of 25 MPa.

    • The water-cement ratio should not exceed 0.50.

    • The cement content can vary based on factors such as aggregate size, shape, and grading.

    • The cement content should be adjusted based on the results of trial mixes.

  • Answered by AI
  • Q3. How much CTC do you expect?
  • Ans. 

    I expect a competitive salary based on industry standards and my experience.

    • I have researched the industry standards for QA QC Engineer salaries

    • I have taken into account my experience and skills

    • I am open to negotiation based on the specific job responsibilities and benefits package

    • I am looking for a fair and competitive salary that reflects my value to the company

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No need to study hard for this interview you have study your CV First.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Good comunication skills
Round 2 - Technical 

(1 Question)

  • Q1. Knowledge about Materials,WPS,Welder qualification, Filler rods.

Interview Questionnaire 

6 Questions

  • Q1. They were asked about previous work experience in detail.
  • Q2. Previous Project details.
  • Q3. Previous projects shuttering area and type of formwork
  • Ans. 

    The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.

    • Used traditional timber formwork for a residential building project

    • Implemented modular steel formwork for a commercial complex

    • Utilized aluminum formwork for a high-rise construction

    • Employed tunnel formwork for an underground structure

  • Answered by AI
  • Q4. Build-up area
  • Q5. About subcontractors billing.
  • Q6. Formwork,steel and masonry work daily productive

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about your work.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About experience
Round 2 - Technical 

(2 Questions)

  • Q1. About experience
  • Q2. About welding, inspection and documentation

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain compressor troubleshooting
  • Ans. 

    Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.

    • Check for leaks in the system

    • Inspect the compressor for damage or wear

    • Check the electrical connections and wiring

    • Monitor the pressure and temperature readings

    • Clean or replace air filters

    • Check the oil level and quality

    • Inspect the belts and pulleys for wear or damage

  • Answered by AI
  • Q2. Prespare well and before interview make sure

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and all types mechanical equipment

I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. How many Year experience
Round 3 - Group Discussion 

Salary discusses boss and hr

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready all challenging new job for the new client
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. General description, skills, expertise, technical knowledge
  • Ans. Whatever knowledge and skills acquire ld with experience
  • Answered Anonymously
Round 3 - One-on-one 

(1 Question)

  • Q1. Detailed technical round, HR inputs, briefing about situations at work

Interview Preparation Tips

Topics to prepare for Turner Construction Assistant Manager interview:
  • Construction
  • Consulting
  • Project Management
  • Cost Control
  • Cost Benefit Analysis

Geodata Interview FAQs

How many rounds are there in Geodata Tunnel Engineer interview?
Geodata interview process usually has 3 rounds. The most common rounds in the Geodata interview process are Technical and Resume Shortlist.
What are the top questions asked in Geodata Tunnel Engineer interview?

Some of the top questions asked at the Geodata Tunnel Engineer interview -

  1. What information is required when designing tunnel proje...read more
  2. Supervisor of Tunnel NATM work as per technical specifications and approved dra...read more

Tell us how to improve this page.

Geodata Tunnel Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

J&F Interview Questions
3.7
 • 30 Interviews
Eversendai Interview Questions
3.7
 • 28 Interviews
Arup Interview Questions
3.8
 • 12 Interviews
Shimizu Interview Questions
4.1
 • 11 Interviews
Khatib & Alami Interview Questions
3.5
 • 11 Interviews
View all
Geodata Tunnel Engineer Salary
based on 13 salaries
₹8.6 L/yr - ₹10.5 L/yr
10% more than the average Tunnel Engineer Salary in India
View more details

Geodata Tunnel Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Tunnel Engineer
13 salaries
unlock blur

₹8.6 L/yr - ₹10.5 L/yr

CAD Engg
9 salaries
unlock blur

₹4.3 L/yr - ₹6.9 L/yr

Geologist
7 salaries
unlock blur

₹6.8 L/yr - ₹14 L/yr

Junior Engineer
6 salaries
unlock blur

₹2.5 L/yr - ₹2.8 L/yr

Cadd Engineer
5 salaries
unlock blur

₹3.6 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Geodata with

Bahwan Engineering

4.2
Compare

Eversendai

3.7
Compare

Descon Engineering

4.0
Compare

GS Engineering & Construction

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview