Filter interviews by
I was interviewed in Aug 2024.
Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.
Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.
Steel is durable and resistant to corrosion, ensuring the longevity of structures.
Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.
Steel is cost-effec...
Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.
Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.
It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.
Proper concrete cover helps in maintaining the durability and streng...
Calculate the amount of steel required for a staircase based on design and dimensions.
Calculate the total length of all the steel bars needed for the staircase
Determine the diameter and spacing of the steel bars based on design requirements
Consider the number of steps and the dimensions of the staircase in the calculation
Account for any additional reinforcement needed for structural integrity
Consult structural drawings
Concrete workability can be determined by conducting a slump test.
Conduct a slump test to measure the consistency of the concrete mix.
Adjust the water content or use admixtures to achieve the desired workability.
Consider factors such as temperature, humidity, and type of aggregates in determining workability.
Consult with concrete mix design experts for guidance on achieving the desired workability.
Use tools like flow t...
Slump test is a method to measure the consistency of concrete before it sets.
Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.
The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.
The test helps ensure the concrete is of the right consistency for proper placement and compaction.
Slump tes...
Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.
Involves selecting the right combination of materials like cement, aggregates, water, and admixtures
Proportions are determined based on desired strength, workability, durability, and other properties
Testing and adjusting the mix design to meet project requirements
Example: A ...
I applied via LinkedIn
Cube test is a method to determine the compressive strength of concrete.
Concrete cubes are casted and cured for 28 days before testing.
The cubes are then placed in a compression testing machine.
The maximum load that the cube can bear before failure is recorded.
The compressive strength of the concrete is calculated using the formula: compressive strength = maximum load/area of cube face.
The cube test is an important qua
ESR stands for Earth System Research, CWR stands for Crop Water Requirement, and steel IS code refers to Indian Standard code for steel.
ESR is a research program that studies the Earth's climate system and its changes over time.
CWR is the amount of water needed by crops to grow and produce a good yield.
Steel IS code refers to the Indian Standard code for steel, which provides guidelines for the production and use of st
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
What people are saying about Megha Engineering & Infrastructures
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
posted on 15 Jun 2024
I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.
Sanik school G+2 , Quantity survey, estimation and costing
I applied via Referral and was interviewed in Jun 2022. There was 1 interview round.
The technical specification of a boom placer includes details about its lifting activities and repair maintenance.
Technical specification of a boom placer includes information about its capacity, reach, and lifting height.
Lifting activities of a boom placer involve the movement and placement of heavy objects or materials.
Repair maintenance of a boom placer includes regular inspections, lubrication, and replacement of w...
Yes, I have a documentation process for my work as a Site Engineer.
I maintain detailed records of all project activities, including plans, specifications, and progress reports.
I use standardized templates and forms to document site inspections, quality control checks, and safety procedures.
I organize and file all documentation in a systematic manner for easy retrieval and reference.
I regularly update and communicate ch...
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
posted on 29 May 2024
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.
Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.
Final setting time is usually around 2 to 4 hours after adding water to the cement.
Setting time can vary based on the type of cement and environmental conditions.
S
Bleeding is the process of air escaping from fresh concrete mix and rising to the surface.
Bleeding occurs when water in the concrete mix rises to the surface due to settlement of solid particles.
It can lead to surface defects if not properly managed.
Bleeding can be reduced by using proper mix design and techniques like vibration or adding admixtures.
Excessive bleeding can weaken the surface of the concrete.
Examples: Wa...
based on 82 reviews
Rating in categories
Senior Engineer
880
salaries
| ₹3 L/yr - ₹11.5 L/yr |
Engineer
867
salaries
| ₹2.2 L/yr - ₹6.8 L/yr |
Associate Manager
490
salaries
| ₹4.8 L/yr - ₹15.5 L/yr |
Mechanical Engineer
394
salaries
| ₹2.1 L/yr - ₹9 L/yr |
Civil Engineer
360
salaries
| ₹2.2 L/yr - ₹8.2 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company