There are two main types of motors: AC motors and DC motors.
AC motors: Induction motors, synchronous motors
DC motors: Brushed DC motors, brushless DC motors
Other types: Stepper motors, servo motors
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
Different types of concrete used in construction include ready-mix concrete, precast concrete, high-strength concrete, and lightweight concrete.
Ready-mix concrete is a mixture of cement, water, and aggregates that is delivered in a truck and poured on site.
Precast concrete is made in a controlled environment and then transported to the construction site for installation.
High-strength concrete is designed to withstand h...
Steel bars are commonly used in construction for reinforcement purposes.
Steel bars are categorized based on their composition and properties, such as carbon steel, alloy steel, and stainless steel.
Different types of steel bars include TMT bars, deformed bars, mild steel bars, and high tensile strength bars.
Types of foundations in construction include shallow foundations, deep foundations, and specialized foundations.
Shallow foundations: spread footings, mat foundations
Deep foundations: piles, drilled shafts
Specialized foundations: caissons, piers
Types of soils used in construction include clay, sand, silt, and gravel.
Clay: used for lining ponds and as a base for roads
Sand: used for making concrete and mortar
Silt: used for filling embankments and as a base for roads
Gravel: used for drainage and as a base for roads
Different types of steel used in construction include carbon steel, alloy steel, stainless steel, and tool steel.
Carbon steel is the most common type used in construction due to its strength and affordability.
Alloy steel contains additional elements such as manganese, silicon, and copper to enhance its properties.
Stainless steel is corrosion-resistant and often used in environments where rust is a concern.
Tool steel is...
Different types of bridges include beam bridges, truss bridges, arch bridges, suspension bridges, and cable-stayed bridges.
Beam bridges are the simplest type, consisting of a horizontal beam supported by piers at each end.
Truss bridges have a framework of connected elements forming triangular units for support.
Arch bridges have a curved structure that distributes weight evenly and is often used for longer spans.
Suspens...
Megha Engineering & Infrastructures interview questions for popular designations
I applied via Job Fair and was interviewed in May 2024. There were 2 interview rounds.
12 pass iti certificate
Get interview-ready with Top Megha Engineering & Infrastructures Interview Questions
I applied via Approached by Company and was interviewed in May 2024. There were 2 interview rounds.
Water Treatment Plant (WTP) process involves various stages including filtration through filter beds with different layers.
WTP process involves coagulation, flocculation, sedimentation, filtration, and disinfection.
Filter bed is a layer of granular materials like sand, gravel, and anthracite used to filter out impurities from water.
Different layers of filter bed include coarse sand, fine sand, gravel, and anthracite in...
I applied via Walk-in and was interviewed in Sep 2024. There was 1 interview round.
Reasoning & technical
I have over five years of experience in civil surveying, specializing in land development and construction projects.
Conducted topographic surveys for residential developments, ensuring accurate land measurements.
Utilized GPS and total stations for precise data collection on various construction sites.
Collaborated with engineers to create site plans and alignments for road construction projects.
Managed survey teams, pro...
I hold a Bachelor's degree in Civil Engineering, specializing in surveying and geospatial analysis.
Bachelor's degree in Civil Engineering from XYZ University.
Completed coursework in surveying, geodesy, and land development.
Participated in field projects that involved topographic surveys and site assessments.
Gained practical experience through internships with civil engineering firms.
Top trending discussions
Some of the top questions asked at the Megha Engineering & Infrastructures interview -
The duration of Megha Engineering & Infrastructures interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 573 interviews
Interview experience
based on 5.2k reviews
Rating in categories
Barmer,
Barauni
5-10 Yrs
₹ 2.6-5.30184 LPA
Engineer
865
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Senior Engineer
841
salaries
| ₹3.2 L/yr - ₹9.6 L/yr |
Associate Manager
505
salaries
| ₹4.8 L/yr - ₹15.8 L/yr |
Mechanical Engineer
388
salaries
| ₹2.1 L/yr - ₹7.3 L/yr |
Civil Engineer
343
salaries
| ₹2.2 L/yr - ₹7.6 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Alstom Transportation