Q1. Describe in general, the various stages in construction of residential buildings.

Ans.

The stages in construction of residential buildings include planning, design, site preparation, foundation, framing, utilities, interior and exterior finishes, and final inspection.

  • Planning: Determine the project scope, budget, and timeline.

  • Design: Create architectural and structural plans.

  • Site preparation: Clear the land and prepare it for construction.

  • Foundation: Construct the base of the building.

  • Framing: Build the structural framework.

  • Utilities: Install electrical, plumbi...read more

View 5 more answers

Q2. What are handover process to civil or facillities

Ans.

Handover process involves transferring responsibility and ownership of a project or facility from one party to another.

  • Ensure all necessary documentation is complete and accurate

  • Conduct a thorough inspection of the project or facility

  • Provide training and orientation to the new party

  • Establish clear communication channels for ongoing support

  • Obtain sign-off and acknowledgement of the handover

  • Examples: handover of a construction project from the contractor to the owner, handover ...read more

View 3 more answers

Q3. What is cost per sq ft of grade A warehouse. Civil, Pre engineered Building,electrical, Fire fighting work, and other components of the Grade A warehouse?

Ans.

The cost per sq ft of a Grade A warehouse varies depending on the components used.

  • Cost per sq ft of a Grade A warehouse can range from $50 to $150 depending on the location and components used.

  • Civil work can cost around $10 to $20 per sq ft.

  • Pre-engineered building can cost around $20 to $40 per sq ft.

  • Electrical work can cost around $5 to $10 per sq ft.

  • Fire fighting work can cost around $5 to $10 per sq ft.

  • Other components like HVAC, plumbing, and security systems can add to t...read more

Add your answer

Q4. What are the factors that affects the cost per sq ft of the building, how do you optimise the Cost of the building?

Ans.

Factors affecting cost per sq ft of building and how to optimize it.

  • Factors include location, materials used, labor costs, design complexity, and permits.

  • Optimization can be achieved through value engineering, efficient design, and cost-effective materials.

  • Using pre-fabricated components and standardizing design can also reduce costs.

  • Regular cost analysis and budget tracking can help identify areas for improvement.

  • Negotiating with suppliers and contractors can also lead to co...read more

Add your answer
Discover SBI Cards & Payment Services interview dos and don'ts from real experiences

Q5. How will you define stress in simple terms? Explain with example

Ans.

Stress is the force per unit area that a material experiences when subjected to an external load.

  • Stress is a measure of the internal forces within a material

  • It is calculated as force per unit area

  • Stress can cause deformation or failure of a material

  • Example: A bridge under heavy traffic experiences stress due to the weight of the vehicles

  • Example: A metal rod being pulled apart by two opposing forces experiences stress

Add your answer

Q6. How to do research of the company. How you analysis the company

Ans.

Researching a company involves analyzing its financial statements, industry trends, competitive landscape, and management team.

  • Start by analyzing the company's financial statements, including income statement, balance sheet, and cash flow statement.

  • Evaluate the company's industry position, market share, and growth prospects.

  • Assess the competitive landscape by analyzing competitors' financials, market share, and strategies.

  • Examine the company's management team, their track rec...read more

Add your answer
Are these interview questions helpful?

Q7. What is the requirement of paint boxes in one year in the city of jamshedpur

Ans.

The requirement of paint boxes in Jamshedpur varies depending on the demand and usage.

  • The demand for paint boxes can be affected by factors such as population growth, construction projects, and weather conditions.

  • The usage of paint boxes can vary depending on the type of industry and the size of the business.

  • It is important to conduct market research and analyze sales data to determine the annual requirement of paint boxes in Jamshedpur.

  • The requirement of paint boxes can also...read more

Add your answer

Q8. Types of sprinklers name with temperature and color code

Ans.

Sprinklers are classified based on temperature and color code. Each type is designed for specific fire hazards.

  • Blue: 57°C (135°F) - Ordinary Combustibles

  • Orange: 68°C (155°F) - Flammable Liquids

  • Red: 79°C (175°F) - Electrical Equipment

  • Green: 93°C (200°F) - Storage

  • Yellow: 141°C (286°F) - Extra High Temperature

  • Purple: 182°C (360°F) - Extreme High Temperature

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. How many type of waterproof treatment for wet areas?

Ans.

There are primarily two types of waterproof treatments for wet areas: surface waterproofing and integral waterproofing.

  • Surface waterproofing involves applying a waterproof coating or membrane on the surface of the wet area to prevent water penetration.

  • Integral waterproofing involves adding waterproofing agents directly into the concrete mix to make the structure itself waterproof.

  • Examples of surface waterproofing include using bituminous coatings, acrylic coatings, or cementi...read more

View 1 answer

Q10. Difference between PCC and RCC

Ans.

PCC stands for Plain Cement Concrete and RCC stands for Reinforced Cement Concrete.

  • PCC is a mixture of cement, sand, and coarse aggregates, used as a base for flooring, foundations, etc.

  • RCC is a combination of PCC and reinforcement bars, used in structural elements like beams, columns, slabs, etc.

  • PCC has a lower strength compared to RCC.

  • RCC provides better resistance against cracks and structural stability.

  • PCC is commonly used for non-structural elements, while RCC is used fo...read more

View 11 more answers

Q11. How to system testing and commitioning

Ans.

System testing and commissioning involves verifying and validating the functionality of a system before it is put into operation.

  • Develop a test plan that outlines the testing process and criteria

  • Execute the test plan to ensure that the system meets the requirements

  • Document any issues or defects found during testing

  • Fix any issues or defects and retest

  • Once testing is complete, commission the system by putting it into operation

  • Verify that the system is functioning as expected

  • Pro...read more

Add your answer

Q12. What is vlookup pivotable you know about excel

Ans.

VLOOKUP and PivotTable are two powerful features of Excel used for data analysis and manipulation.

  • VLOOKUP is a function used to search for a specific value in a table and return a corresponding value from the same row.

  • PivotTable is a tool used to summarize and analyze large amounts of data in a table format.

  • VLOOKUP can be used in conjunction with PivotTable to extract specific data from a larger dataset.

  • For example, VLOOKUP can be used to extract customer information from a s...read more

View 1 answer

Q13. Types of water supply pipes name with make name

Ans.

There are several types of water supply pipes available in the market. Some of the popular ones are copper, PVC, PEX, and galvanized steel.

  • Copper pipes are durable and resistant to corrosion. They are commonly used in residential and commercial buildings.

  • PVC pipes are lightweight and easy to install. They are commonly used in irrigation systems and swimming pools.

  • PEX pipes are flexible and easy to install. They are commonly used in residential plumbing systems.

  • Galvanized stee...read more

Add your answer

Q14. How the RMC will check the concret

View 2 more answers

Q15. What is the sequence of activities involved in the construction of a high-rise building?

Ans.

The sequence of activities involved in the construction of a high-rise building includes site preparation, foundation work, structural framing, exterior finishing, interior finishing, and final inspections.

  • Site preparation involves clearing the land, leveling the ground, and setting up temporary facilities.

  • Foundation work includes excavation, laying the foundation, and waterproofing.

  • Structural framing involves erecting the steel or concrete frame of the building.

  • Exterior fini...read more

Add your answer

Q16. How can check the RMC vehicle.

Ans.

RMC vehicles can be checked by verifying their registration number and inspecting their physical condition.

  • Check the registration number of the RMC vehicle

  • Inspect the physical condition of the vehicle

  • Ensure that the vehicle is properly maintained and serviced

  • Check for any damages or defects in the vehicle

  • Verify the vehicle's insurance and other necessary documents

View 4 more answers

Q17. Typed of drainage pipes name with make name

Ans.

There are various types of drainage pipes available in the market with different make names.

  • PVC pipes - made by companies like Astral, Finolex, and Supreme

  • HDPE pipes - made by companies like Jain Irrigation, Kisan, and Prince

  • Cast iron pipes - made by companies like Tata, Jindal, and Electrosteel

  • Concrete pipes - made by companies like Hume, RCP, and Hanson

  • Corrugated pipes - made by companies like ADS, NDS, and Timewell

Add your answer

Q18. How much can a shuterring forman earn?

Add your answer

Q19. How many squre feet of gypsum bag will work

Add your answer

Q20. How to start the finishing activities after RCC?

Ans.

After RCC, finishing activities can be started by following a systematic approach to ensure quality and efficiency.

  • Inspect the RCC work to ensure it meets quality standards

  • Prepare the surface for finishing by cleaning and leveling

  • Start with plastering, painting, flooring, and other finishing works in a sequential manner

  • Coordinate with other trades to ensure smooth progress of finishing activities

  • Regularly inspect and monitor the finishing works to address any issues promptly

View 1 answer

Q21. What is scaffold and inspection process How many work permit is being used in construction site What are the safety measures are being taken prior to allow slab casting What risk assessment

Ans.

Scaffolding is a temporary structure used in construction for workers to access heights. Inspection process ensures safety and compliance.

  • Scaffold is a temporary structure made of wood or metal used to support workers and materials during construction.

  • Inspection process involves checking the scaffold for stability, proper assembly, and adherence to safety regulations.

  • Work permits in construction sites vary depending on the type of work being done, such as hot work, confined s...read more

Add your answer

Q22. What are effective strategies for balancing work and personal life?

Ans.

Effective strategies for balancing work and personal life include setting boundaries, prioritizing tasks, delegating responsibilities, and practicing self-care.

  • Set boundaries between work and personal life to avoid burnout

  • Prioritize tasks based on importance and deadlines

  • Delegate responsibilities to team members to lighten workload

  • Practice self-care activities such as exercise, meditation, and spending time with loved ones

Add your answer

Q23. 2. How lift works and how ACs work and different types of ACs

Ans.

Lifts work on the principle of pulleys and counterweights while ACs work on the principle of refrigeration.

  • Lifts use a motor to move a counterweight that balances the weight of the lift car and its occupants.

  • ACs use a compressor to compress and expand refrigerant gas to absorb and release heat.

  • Types of ACs include window ACs, split ACs, central ACs, and portable ACs.

  • Window ACs are mounted on windows and cool a single room, while split ACs have an indoor unit and an outdoor un...read more

Add your answer

Q24. What is the sequence of the finishing activities?

Ans.

The sequence of finishing activities typically involves painting, flooring, installation of fixtures, and final cleaning.

  • Painting walls and ceilings

  • Installing flooring such as tiles or hardwood

  • Fixtures installation like lights, faucets, and cabinets

  • Final cleaning of the area

Add your answer

Q25. When is lodha group solveing technical issue of water pressure?

Ans.

The Lodha Group is actively working to solve the technical issue of water pressure in the bathroom sealing.

  • Lodha Group has identified the issue with water pressure affecting bathroom sealing

  • They are currently working on implementing technical solutions to address the problem

  • Regular maintenance and monitoring of water pressure levels are being conducted to prevent future breakdowns

Add your answer

Q26. how will you sell the flat with person without any budget

Ans.

I would focus on highlighting the unique features and benefits of the flat, emphasizing its value and potential for the buyer.

  • Emphasize the location and convenience of the flat, such as proximity to public transportation, schools, or shopping centers.

  • Highlight any special amenities or features of the flat, such as a balcony, updated kitchen, or spacious layout.

  • Offer flexible payment options or negotiate a payment plan to accommodate the buyer's budget constraints.

  • Provide info...read more

Add your answer

Q27. Definition of Horticulture , technical knowledge of landscape

Ans.

Horticulture is the science and art of cultivating plants for food, medicine, and beauty. Technical knowledge of landscape involves designing and maintaining outdoor spaces.

  • Horticulture involves the study of plant growth, propagation, and cultivation techniques.

  • It includes the production of fruits, vegetables, flowers, and ornamental plants.

  • Landscape design involves creating outdoor spaces that are functional, aesthetically pleasing, and sustainable.

  • Technical knowledge of lan...read more

Add your answer

Q28. Could you please explain the 7-days slab cycle for Aluform shuttering?

Ans.

The 7-days slab cycle for Aluform shuttering involves the process of casting, curing, and stripping the concrete slab within a 7-day period.

  • Day 1: Setting up the Aluform shuttering and pouring the concrete mixture into the formwork.

  • Day 2-6: Allowing the concrete to cure and gain strength within the shuttering.

  • Day 7: Stripping the Aluform shuttering to reveal the hardened concrete slab.

  • The 7-days slab cycle is crucial for ensuring the structural integrity and quality of the co...read more

Add your answer

Q29. What is the occupational diseases

Ans.

Occupational diseases are illnesses caused by exposure to workplace hazards.

  • Occupational diseases are specific health conditions that result from workplace exposures.

  • They can be caused by physical, chemical, biological, or ergonomic hazards.

  • Examples include lung diseases from inhaling asbestos fibers, skin disorders from exposure to certain chemicals, and hearing loss from prolonged noise exposure.

  • Occupational diseases can have both short-term and long-term effects on workers...read more

Add your answer

Q30. What u know about fire fighting.

Ans.

Firefighting involves the use of various techniques and equipment to extinguish fires and prevent their spread.

  • Firefighters use water, foam, and other extinguishing agents to put out fires.

  • They also use specialized tools such as axes, hoses, and ladders to gain access to burning buildings and rescue people.

  • Firefighters are trained to assess the situation and determine the best course of action to contain and extinguish the fire.

  • They also work to prevent fires by educating the...read more

Add your answer

Q31. What is Self compacting concrete what are test involved

Ans.

Self compacting concrete is a highly flowable type of concrete that does not require vibration for compaction.

  • Self compacting concrete (SCC) is designed to flow and fill formwork without the need for mechanical consolidation.

  • Tests involved in SCC include slump flow test, V-funnel test, L-box test, and J-ring test.

  • Slump flow test measures the flowability of SCC by observing the diameter of the concrete spread on a flat surface.

  • V-funnel test evaluates the flow time and flow rat...read more

Add your answer

Q32. Area of interest (subjects)

Ans.

Structural engineering, transportation engineering, and geotechnical engineering

  • Structural engineering: designing and analyzing structures such as buildings, bridges, and dams

  • Transportation engineering: planning and designing transportation systems, including roads, highways, and airports

  • Geotechnical engineering: studying soil and rock mechanics to ensure the stability of structures and foundations

View 1 answer

Q33. Do you Excel, Word, PowerPoint, mail drafting?

Add your answer

Q34. How will you sell lodha Project

Ans.

I will highlight the unique features of the Lodha project and showcase its value proposition to potential buyers.

  • Emphasize the prime location of the project

  • Highlight the luxurious amenities and facilities offered

  • Showcase the quality of construction and attention to detail

  • Provide a comparison with similar projects in the market

  • Offer attractive payment plans and financing options

Add your answer

Q35. What are the software's you know?

Ans.

I am proficient in AutoCAD, Revit, SketchUp, and Adobe Creative Suite.

  • AutoCAD

  • Revit

  • SketchUp

  • Adobe Creative Suite

Add your answer

Q36. What is the specific performance of contract

Ans.

Specific performance of a contract is a legal remedy where a court orders a party to fulfill their obligations under the contract.

  • Specific performance is a remedy typically used when monetary damages are inadequate to compensate for a breach of contract.

  • It is an equitable remedy granted at the discretion of the court.

  • Courts may order specific performance in cases involving unique goods or real estate.

  • Example: A court may order a seller to transfer ownership of a unique piece ...read more

View 1 answer

Q37. What is difference between betumen road & RCC road

Ans.

Bitumen roads are flexible and made of bitumen while RCC roads are rigid and made of reinforced concrete.

  • Bitumen roads are cheaper to construct than RCC roads.

  • RCC roads have a longer lifespan than bitumen roads.

  • Bitumen roads are more suitable for low traffic areas while RCC roads are better for high traffic areas.

  • RCC roads require more maintenance than bitumen roads.

  • RCC roads are more durable and can withstand heavy loads better than bitumen roads.

Add your answer

Q38. Describe the method of waterproof treatment?

Ans.

Waterproof treatment involves applying materials to prevent water penetration into structures.

  • Surface preparation including cleaning and repairing any cracks or holes

  • Application of waterproofing materials such as membranes, coatings, or sealants

  • Ensuring proper curing and drying time for the materials to effectively seal the surface

  • Regular maintenance and inspection to ensure long-lasting waterproofing

  • Examples: using bituminous coatings for roofs, applying epoxy injections for...read more

Add your answer

Q39. How to deal or solve the site situation.

Ans.

To solve site situations, it is important to assess the problem, communicate effectively with team members, implement a solution, and monitor progress.

  • Assess the situation by identifying the root cause of the problem

  • Communicate effectively with team members to gather input and feedback

  • Implement a solution by creating an action plan and assigning tasks

  • Monitor progress by regularly checking in on the situation and adjusting as needed

Add your answer

Q40. What is safety and de snagging.

Ans.

Safety and de-snagging are important aspects of ensuring a safe and efficient work environment on construction sites.

  • Safety involves implementing measures to prevent accidents and injuries on site.

  • De-snagging refers to the process of removing obstacles or hazards that could potentially cause harm to workers.

  • Examples of safety measures include providing proper training, enforcing the use of personal protective equipment, and conducting regular safety inspections.

  • Examples of de...read more

Add your answer

Q41. How do you include new Cps?

Ans.

New CPS can be included by identifying potential clients, building relationships, and providing value through product knowledge and excellent customer service.

  • Identify potential clients through market research and networking

  • Build relationships through regular communication and follow-up

  • Provide value through product knowledge and excellent customer service

  • Offer promotions or incentives to encourage new CPS to try your products

  • Track and analyze sales data to identify areas for ...read more

Add your answer

Q42. What is the mix proportion ?

Ans.

Mix proportion refers to the ratio of different materials used in a concrete mix to achieve desired properties.

  • Mix proportion is typically expressed as the ratio of cement, sand, and aggregate in a concrete mix.

  • For example, a common mix proportion for concrete is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.

  • The mix proportion can vary depending on the desired strength, workability, and durability of the concrete mix.

Add your answer

Q43. How to do slum cone checking

Add your answer

Q44. Is standard code for concrete mix design

Ans.

Yes, standard codes are used for concrete mix design to ensure quality and safety.

  • Standard codes provide guidelines for selecting materials, proportions, and testing procedures for concrete mix design.

  • Examples of standard codes include ACI 318 for structural concrete and ASTM C94 for ready-mixed concrete.

  • Following standard codes helps ensure the durability, strength, and workability of the concrete mix.

Add your answer

Q45. When is lodha group solveing this issue?

Ans.

The issue with bathroom sealing breaking down due to water pressure is being addressed by Lodha Group.

  • Lodha Group is actively working on solving the issue with bathroom sealing breaking down due to water pressure.

  • They are likely investigating the root cause of the problem and implementing necessary fixes.

  • It is important for them to prioritize the safety and comfort of their residents by resolving this issue promptly.

Add your answer

Q46. What will you ensure before concreting

Ans.

Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

  • Check formwork for proper alignment and stability

  • Ensure reinforcement bars are correctly placed as per design

  • Verify concrete mix design meets project specifications

  • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

Add your answer

Q47. What is RERA act about?

Ans.

RERA act is a real estate regulatory act passed by the Indian parliament in 2016.

  • RERA stands for Real Estate (Regulation and Development) Act.

  • It aims to protect the interests of homebuyers and ensure timely completion of projects.

  • It mandates that all real estate projects must be registered with the regulatory authority.

  • Developers must deposit 70% of the funds collected from buyers in a separate bank account to ensure timely completion of projects.

  • It also establishes a fast-tr...read more

Add your answer

Q48. How to do a cube test

Add your answer

Q49. Which field in complete your education

Ans.

I completed my education in the field of Computer Science.

  • Bachelor's degree in Computer Science

  • Courses in programming languages like Java, Python, C++

  • Specialization in data management and analysis

  • Internship at a software development company

Add your answer

Q50. NewbTechnology in horticulture .

Ans.

NewbTechnology in horticulture refers to the use of innovative technologies to improve the efficiency and productivity of horticulture practices.

  • NewbTechnology can include the use of drones for crop monitoring and management.

  • It can also involve the use of precision agriculture techniques to optimize crop yields.

  • NewbTechnology can help reduce water usage and improve sustainability in horticulture.

  • Examples of NewbTechnology in horticulture include hydroponics, vertical farming,...read more

Add your answer

Q51. Resident project in buildings

Ans.

Resident project in buildings involves managing and overseeing construction projects within residential buildings.

  • Supervising and coordinating construction activities

  • Ensuring compliance with building codes and regulations

  • Managing project timelines and budgets

  • Coordinating with contractors, architects, and other stakeholders

  • Resolving any issues or conflicts that arise during the project

  • Ensuring quality control and adherence to project specifications

  • Communicating project updates...read more

Add your answer

Q52. What is rolling margin?

Ans.

Rolling margin is the difference between the actual cost and the estimated cost of a project at a specific point in time.

  • Rolling margin helps in tracking the financial performance of a project.

  • It is calculated by subtracting the estimated cost from the actual cost.

  • A positive rolling margin indicates that the project is under budget, while a negative rolling margin indicates that the project is over budget.

Add your answer

Q53. Which aggregate test done

Ans.

Various tests are done on aggregates, including sieve analysis, specific gravity, and absorption.

  • Sieve analysis determines the particle size distribution of the aggregate.

  • Specific gravity test measures the density of the aggregate compared to water.

  • Absorption test determines the amount of water absorbed by the aggregate.

  • Other tests include soundness test, crushing value test, and impact value test.

  • The results of these tests help in determining the quality and suitability of t...read more

Add your answer

Q54. Procedure of finishing work

View 3 more answers

Q55. Productivity of fitters and carpenters?

Ans.

Productivity of fitters and carpenters can vary based on factors like skill level, experience, tools/equipment availability, and project complexity.

  • Productivity of fitters and carpenters can be influenced by their skill level and experience.

  • Availability of tools and equipment can impact the efficiency of fitters and carpenters.

  • The complexity of the construction project can also affect the productivity of fitters and carpenters.

  • Regular training and upskilling can improve the p...read more

Add your answer

Q56. Basic formula sum if count vlookup

Ans.

The question is asking about basic formulas like SUM, IF, COUNT, and VLOOKUP commonly used in data entry operations.

  • Use SUM formula to add up a range of cells

  • IF formula to perform a logical test and return one value if the condition is met, and another value if it is not

  • COUNT formula to count the number of cells that contain numbers

  • VLOOKUP formula to search for a value in the first column of a table and return a value in the same row from another column

Add your answer

Q57. How to calculate quantity?

Ans.

Quantity can be calculated by multiplying the area or volume of an object by its density or by counting individual units.

  • Calculate area or volume of the object

  • Determine the density of the material if applicable

  • Multiply the area or volume by the density to get the total quantity

  • Alternatively, count individual units to calculate quantity

Add your answer

Q58. How you will mitigate delay

Ans.

To mitigate delay, I will prioritize tasks, set realistic timelines, communicate effectively with team members, and proactively address any issues that may arise.

  • Prioritize tasks based on importance and urgency

  • Set realistic timelines and deadlines for each task

  • Communicate effectively with team members to ensure everyone is on the same page

  • Proactively address any issues or obstacles that may cause delays

  • Regularly review progress and make adjustments as needed

Add your answer

Q59. You know about SAP. SAP T codes.

Ans.

SAP T codes are transaction codes used in SAP to execute specific functions or tasks.

  • SAP T codes are shortcuts to access specific functions in SAP.

  • Each T code corresponds to a specific task or transaction in SAP.

  • For example, T code FB50 is used to post a journal entry in SAP.

  • Users can also create custom T codes for frequently used functions.

Add your answer

Q60. Doka jum form xclumbing 60

Ans.

The question is asking about the climbing form Doka jum xclumbing 60.

  • Doka jum is a type of climbing formwork system used in construction.

  • Xclumbing 60 may refer to a specific model or size of the climbing formwork system.

  • The number 60 could indicate the height or capacity of the climbing formwork system.

Add your answer

Q61. Customer service scenario

Ans.

Handling a customer complaint about a delayed delivery

  • Apologize for the inconvenience caused

  • Investigate the reason for the delay

  • Offer a solution or compensation

  • Ensure the customer is satisfied with the resolution

Add your answer

Q62. Ex.empoler experience

Ans.

I have extensive experience in managing and empowering teams to achieve their goals.

  • Implemented a mentorship program that increased employee retention by 20%

  • Encouraged cross-functional collaboration resulting in a 15% increase in productivity

  • Provided regular feedback and recognition to team members resulting in a 25% increase in employee satisfaction

  • Developed and executed training programs resulting in a 30% increase in employee skillset

  • Implemented a flexible work schedule re...read more

Add your answer

Q63. Toilet waterproofing procedure

Ans.

Toilet waterproofing procedure involves sealing all potential leakage points to prevent water damage.

  • Clean and dry the surface before applying waterproofing material

  • Use waterproofing membrane or coating to seal joints and corners

  • Ensure proper sealing around pipes and fittings to prevent leaks

  • Test the waterproofing by filling the toilet with water and checking for any leaks

  • Regular maintenance and inspection to prevent water damage

Add your answer

Q64. Explain mivan slab cycle

Ans.

Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

  • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

  • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

  • This method is efficient, cost-effective, and results in high-quality finishes.

  • Mivan slab cycle reduces construction time and labor requirements compared to traditional methods.

  • Exa...read more

Add your answer

Q65. Measurements and Process of work

Ans.

Measurements and process of work are essential for tracking progress and ensuring efficiency.

  • Establish clear goals and objectives for the work to be done

  • Define key performance indicators (KPIs) to measure success

  • Implement regular check-ins and progress updates to track performance

  • Utilize tools and technology to streamline processes and improve efficiency

  • Analyze data and metrics to identify areas for improvement and optimization

Add your answer

Q66. Earlier projects done

Ans.

I have worked on various civil engineering projects including construction of highways, bridges, and buildings.

  • Managed the construction of a 10 km highway project, ensuring timely completion and adherence to safety standards

  • Designed and supervised the construction of a 5-story commercial building, ensuring structural integrity and compliance with local regulations

  • Led a team of engineers in the construction of a pedestrian bridge, ensuring efficient use of resources and timely...read more

Add your answer

Q67. Use of Vlookup in excel

Ans.

Vlookup is a function in Excel used to search for a value in a table and return a corresponding value from another column.

  • Vlookup stands for 'vertical lookup'

  • It is used to search for a value in the first column of a table and return a value in the same row from a specified column

  • Syntax: =VLOOKUP(lookup_value, table_array, col_index_num, [range_lookup])

  • Example: =VLOOKUP(A2, B2:D10, 3, FALSE) - searches for the value in cell A2 in the range B2:D10 and returns the value in the 3...read more

Add your answer

Q68. FCU working principle

Ans.

FCU stands for Fan Coil Unit, which works on the principle of heat transfer through a coil to cool or heat air.

  • FCU contains a coil through which chilled or hot water flows to transfer heat to or from the air.

  • A fan blows air over the coil to distribute the cooled or heated air into the space.

  • Thermostat controls the operation of the FCU based on the desired temperature set by the user.

Add your answer

Q69. Waterproofing methodology

Add your answer

Q70. Sell me this flat

Ans.

Spacious and modern flat with stunning views

  • Open floor plan with plenty of natural light

  • High-end finishes and modern appliances

  • Large balcony overlooking the city skyline

  • Convenient location near shopping and transportation

  • Secure building with amenities like a gym and pool

Add your answer

Q71. Description of doors

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at SBI Cards & Payment Services

based on 117 interviews
Interview experience
4.2
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.8
 • 1.5k Interview Questions
4.0
 • 362 Interview Questions
3.9
 • 362 Interview Questions
3.5
 • 346 Interview Questions
4.3
 • 191 Interview Questions
4.1
 • 141 Interview Questions
View all
Top Lodha Group Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter